An Effective Earned Value Management System (EVMS) is a Team Sport

We present a novel framework to assess 27 earned value management system (EVMS) environment factors and investigate their impact on project performance. A study of the EVMS literature, a survey of practitioners, and focus group meetings with 36 EVMS industry and government experts, supported the development of the framework. Focus groups involving 80 practitioners refined and tested it. We analyzed performance data from 35 completed projects/programs representing over US$21.8 billion in total cost; a project demonstrating a positive environment could save up to 25% in cost versus baseline. Practitioners can develop an effective EVMS environment by following the provided guidance.

Aramali, Vartenie↗

Tailoring EVMS Tools for Projects under $50M

The Earned Value Management System (EVMS) Tailoring Guide for Projects Under $\$$50M is designed for U.S. Department of Energy (DOE) cost-reimbursed projects less than $50M where full EVMS is not required per DOE Order 413.3B but is applicable to all projects below a mandated compliant EVMS requirement. The guide provides an inventory of tools and rules typically used as part of a fully compliant EVMS. The ranking employed in this guide identifies key foundational tools, as well as identifying opportunities for tailoring based upon project size or risk. The goal is to provide guidance for companies to establish enterprise level tools that provide meaningful performance data as efficiently as possible.

99 GENERAL AND MISCELLANEOUS↗

PREPARING FOR A SUCCESSFUL EVMS CERTIFICATION

The client, a government agency, requires its contractor to obtain an Earned Value Management System (EVMS) certification that meets the intent of ANSI/EIA-748-B, Earned Value Management Systems. The contractor has extensive experience with certification preparation, having completed two certifications within two years. Information from a previous EVMS certification and internal system surveillances are used to prepare for client-based EVMS certifications and bi-annual surveillances. The contractor also sent members of its group to assist other companies preparing for surveillances and certifications to perform 'Black Hat Reviews.' This paper is a lessons learned on preparing a team for EVMS certification. The information is also applicable for surveillances, since the contractor prepares its team for the surveillance in the same manner as the initial certification. Some of the areas covered include required documents, tracing the data through the systems, Control Account Manager (CAM) preparation, and system verification.

99 GENERAL AND MISCELLANEOUS↗

Measurement of Nuclear Power Plant Construction Performance Using EVMS Model

The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AmeriFlux FLUXNET-1F US-EvM Everglades Saltwater intrusion marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-EvM Everglades Saltwater intrusion marsh. This is the FLUXNET version of the carbon flux data for the site US-EvM Everglades Saltwater intrusion marsh produced by applying the standard ONEFlux (1F) software. Site Description - This is a site in Southeaster Florida that is experience an ecosystem state shift caused by saltwater flooding. We are seeing sawgrass mortality and mangrove invasion

Starr, Gregory [University of Alabama]↗

EVMS Self-Surveillance of Remote Handled Low Level Waste (RHLLW) Project

DOE G 413.3-10A, Section 3.a states: “The Contractor has primary responsibility for implementing and maintaining a surveillance program to ensure continued compliance of the system with ANSI/EIA-748B. DOE O 413.3B requires the FPD to ensure the contractor conducts a Self-Surveillance annually. This annual Self-Surveillance,…should cover all 32 guidelines of the ANSI/EIA748B. Documentation of the Self-Surveillance is sent to the CO and the PMSO (copy to OECM) confirming the continued compliance of their EVMS ANSI/EIA748B...” This review, and the associated report, is deemed to satisfy this requirement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux US-EvM Everglades Saltwater intrusion marsh

This is the AmeriFlux version of the carbon flux data for the site US-EvM Everglades Saltwater intrusion marsh. Site Description - This is a site in Southeaster Florida that is experience an ecosystem state shift caused by saltwater flooding. We are seeing sawgrass mortality and mangrove invasion

Starr, Gregory↗

Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

Earned value management (EVM) is a project management approach that can enhance the probability of project success. It is applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through the use of an earned value management system (EVMS). A holistic and up-to-date literature review on EVM and EVMS does not exist. A literature review can provide a comprehensive perspective on the topic, identifying and summarizing the existing body of knowledge, as a foundation to advance the state of practice of EVM/EVMS. Therefore, the objective of this paper is to investigate the EVM/EVMS state of the art by critically reviewing academic and industry publications, with a specific focus on the maturity of EVMS and the environment surrounding its implementation. By performing a systematic literature review, the authors identified 600 publications since the inception of the EVM concept in 1962, and then narrowed down this list to 160 relevant publications from the last decade for closer review. The findings include the discovery of eight emergent themes. Of these themes, “forecasting/prediction” constitutes the largest portion of the recent literature, followed by “application of EVMS.” One interesting finding is that EVMS maturity, although being a critical topic, is only discussed in one publication. Publications focused on EVM/EVMS have increased in the last decade and significant differences were found between academia and industry literature in terms of the limitations and extensions of EVM/EVMS, EVMS environment, and compliance. A key finding is that designing a reliable EVMS should combine both technical and social aspects of implementation. This forward-looking paper provides a state-of-the-art review while highlighting gaps in the existing EVM/EVMS body of knowledge and introducing new perspectives to support EVMS research and application.

42 ENGINEERING↗

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance

Earned value management systems (EVMS) are used by industry practitioners to successfully manage projects and programs; however, there has been no past study to characterize and evaluate the impact of EVMS maturity on project performance. This paper introduces a novel framework, developed to measure the EVMS maturity, composed of 56 attributes arrayed across ten subprocesses, which together make up an integrated project/program management system. This paper describes how the framework was conceived and developed, based on literature review and data collected from industry workshops. Then, it examines the relationship between EVMS maturity and ten project performance metrics through statistical analyses. The study analyzed project data from 35 projects and programs worth over $21.8 billion in total cost. For this sample, results showed statistically significant differences between projects with high and low EVMS maturity; on average, projects exhibiting high EVMS maturity have 54% less cost overruns and 19% less change orders versus their performance measurement baseline. Higher maturity projects and programs also achieve better customer satisfaction, meet business objectives more often, and are more often in compliance with EVMS standards and guidelines. This paper contributes to the body of knowledge by providing a practical and novel framework for assessing the maturity of earned value management systems. Practitioners can use the framework to improve their integrated project and program management.

99 GENERAL AND MISCELLANEOUS↗

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗