Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EVM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NASA EVM Overview and Case Study

The presentation gives an overview of the National Aeronautics and Space Administration (NASA) Earned Value Management (EVM) structure. We briefly talk about the current EVM high-level policies within NASA and the EVM governing structure. It touches on the roles and responsibilities of EVM Focal Points within the Agency. We will also discuss the approach that MSFC followed in implementing EVM and better data analysis within the Habitat Holding Racks (HHR) Project. We will address the approach used at the Marshall Space Flight Center (MSFC) to effectively equip and support MSFC projects in applying a sound EVM and data analysis process. In addition, we will show metrics associated with the HHR project before and after the implementation of EVM on the project. We will discuss the monthly report, using sample data, that the project manager used each month to assess the performance of the project. The data received from EVM helped create a solid method for assessing the project s performance. The use of EVM data analysis can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces. EVM provides project managers with information that can be used in the decision making process.

Kerby, Jerald G.↗

EVM and Schedule Management

The objective of EVMS surveillance is to ensure that the management control processes that support the performance measurement baseline (PMB) are in place, compliant with the EVMS guidelines, are routinely being used, and provide timely and reliable data. The PMB is a triple constraint where the constraints are schedule, budget and scope. For Surveillance, NASA uses the DCMA EVM Compliance Metrics (DECM) Tests that are aligned with the EIA-748 EVM Standard. Guidelines 6 is Scheduling Work, and DECM has 23 Tests for evaluating if the IMS supports project goals in its planning, statusing and forecasting. This session will focus on the Test Metric that analyzes forecast start/finish dates riding the status date of the IMS for two or more consecutive months as an example of how surveillance works in concert with IMS health checks. It will cover how to run the test to recognize trends and how this test helps ensure that the forecast is credible in support of critical path analysis.

EVM↗

An Effective Earned Value Management System (EVMS) is a Team Sport

We present a novel framework to assess 27 earned value management system (EVMS) environment factors and investigate their impact on project performance. A study of the EVMS literature, a survey of practitioners, and focus group meetings with 36 EVMS industry and government experts, supported the development of the framework. Focus groups involving 80 practitioners refined and tested it. We analyzed performance data from 35 completed projects/programs representing over US$21.8 billion in total cost; a project demonstrating a positive environment could save up to 25% in cost versus baseline. Practitioners can develop an effective EVMS environment by following the provided guidance.

Aramali, Vartenie↗

Tailoring EVMS Tools for Projects under $50M

The Earned Value Management System (EVMS) Tailoring Guide for Projects Under $\$$50M is designed for U.S. Department of Energy (DOE) cost-reimbursed projects less than $50M where full EVMS is not required per DOE Order 413.3B but is applicable to all projects below a mandated compliant EVMS requirement. The guide provides an inventory of tools and rules typically used as part of a fully compliant EVMS. The ranking employed in this guide identifies key foundational tools, as well as identifying opportunities for tailoring based upon project size or risk. The goal is to provide guidance for companies to establish enterprise level tools that provide meaningful performance data as efficiently as possible.

99 GENERAL AND MISCELLANEOUS↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

PREPARING FOR A SUCCESSFUL EVMS CERTIFICATION

The client, a government agency, requires its contractor to obtain an Earned Value Management System (EVMS) certification that meets the intent of ANSI/EIA-748-B, Earned Value Management Systems. The contractor has extensive experience with certification preparation, having completed two certifications within two years. Information from a previous EVMS certification and internal system surveillances are used to prepare for client-based EVMS certifications and bi-annual surveillances. The contractor also sent members of its group to assist other companies preparing for surveillances and certifications to perform 'Black Hat Reviews.' This paper is a lessons learned on preparing a team for EVMS certification. The information is also applicable for surveillances, since the contractor prepares its team for the surveillance in the same manner as the initial certification. Some of the areas covered include required documents, tracing the data through the systems, Control Account Manager (CAM) preparation, and system verification.

99 GENERAL AND MISCELLANEOUS↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Measurement of Error Vector Magnitude (EVM) to Characterize the Impairment of the Tracking and Data Relay Satellite (TDRS) Channel

A digital signal is transmitted via a carrier wave, it demodulates at a receiver, and locates at an ideal constellation point. However, noise distortion, carrier leakage, and phase noise can force a signal to divert from its ideal position to a new position. Consequently, the performance of the signal is decreased. Bit Error Rate (BER) and Error Vector Magnitude (EVM) measurement techniques are used to enable the analysis and assessment of the extent to which the performance of a signal has been decreased. In this paper, we present the EVM measurement technique as a figure of merit to analyze and evaluate the performance of a User Services Subsystem Component Replacement (USSCR) modem. Also, we demonstrate the use of the EVM measurement technique in a Tracking and Data Relay Satellite (TDRS) system to measure and evaluate channel impairment between a satellite (transmitter) and the ground terminal (receiver) at the White Sands Complex.

Spacecraft RF Communications↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗

Measurement of Nuclear Power Plant Construction Performance Using EVMS Model

The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗

AmeriFlux FLUXNET-1F US-EvM Everglades Saltwater intrusion marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-EvM Everglades Saltwater intrusion marsh. This is the FLUXNET version of the carbon flux data for the site US-EvM Everglades Saltwater intrusion marsh produced by applying the standard ONEFlux (1F) software. Site Description - This is a site in Southeaster Florida that is experience an ecosystem state shift caused by saltwater flooding. We are seeing sawgrass mortality and mangrove invasion

Starr, Gregory [University of Alabama]↗

Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

Counts, Stacy↗

Applying EVM to Satellite on Ground and In-Orbit Testing - Better Data in Less Time

Using Error Vector Magnitude (EVM) in satellite integration and test allows rapid verification of the Bit Error Rate (BER) performance of a satellite link and is particularly well suited to measurement of low bit rate satellite links where it can result in a major reduction in test time (about 3 weeks per satellite for the Geosynchronous Operational Environmental Satellite [GOES] satellites during ground test) and can provide diagnostic information. Empirical techniques developed to predict BER performance from EVM measurements and lessons learned about applying these techniques during GOES N, O, and P integration test and post launch testing, are discussed.

Peters, Robert↗

NASA Earned Value Management (EVM) Update

Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.

Kerby, Jerald↗

EVMS Self-Surveillance of Remote Handled Low Level Waste (RHLLW) Project

DOE G 413.3-10A, Section 3.a states: “The Contractor has primary responsibility for implementing and maintaining a surveillance program to ensure continued compliance of the system with ANSI/EIA-748B. DOE O 413.3B requires the FPD to ensure the contractor conducts a Self-Surveillance annually. This annual Self-Surveillance,…should cover all 32 guidelines of the ANSI/EIA748B. Documentation of the Self-Surveillance is sent to the CO and the PMSO (copy to OECM) confirming the continued compliance of their EVMS ANSI/EIA748B...” This review, and the associated report, is deemed to satisfy this requirement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗