Online EV Scheduling Algorithms for Adaptive Charging Networks with Global Peak Constraints
Not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
In case J3400 and J3400/1 define a basic analog signaling approach for DC charging adapters to communicate over-temperature events to both the EV and EVSE. They also require the EV to implement mitigation and corrective actions in cases where the EVSE does not respond to adapter thermal signals. In this study, multiple production vehicles were evaluated for responsiveness to assess field readiness and ensure consistent performance in accordance with the SAE J1772, J3400 and J3400/1 standards. A series of test cases were developed and executed across different vehicles, using an adapter thermal breakout fixture designed by NLR for evaluations. The results revealed notable variations in behavior: some vehicles expected to comply with J1772 were found to be non-responsive under certain conditions. Additionally, while some EV OEMs appear to align with the J3400 standard, discrepancies exist due to its evolving nature, resulting in inconsistent implementation of the latest requirements. These findings highlight the need for alignment within standards organizations to ensure consistent interpretation, encourage compliance, and reduce potential confusion across implementations.
This report examines the mechanical forces that direct current fast charging (DCFC) electric vehicle supply equipment (EVSE) connectors and electric vehicle (EV) inlet ports experience during normal usage. As we witness the fast and growing variety of EVs, charge port locations, and bigger and more powerful EVSE configurations including the SAE J3400 North American Charging Standard (NACS), which has increased the use of adapters with J3400 and J1772 compatibility. These new conditions contribute to increased mechanical forces due to their size, weight and lever arm effect, which creates the need to study and compare these forces to the limits on UL2251 and IEC 62196-1 standards. This report focuses solely on high power DC charging EVSE connectors, EV inlets and adapters for the specific compatibility cases on J3400 with J1772. We first describe the details of the 100N and the 750N side-load evaluations as described in the standards, then present the data obtained by replicating these tests to finally go into more detail on the findings and our recommendations.
As part of the U.S. DOE EVs@Scale consortium Next-Gen Profiles (NGP) project, the profile capture of production electric vehicles undergoing high power charging (HPC) is conducted over a wide range of conditions to explore variance and performance. Charge session parameters are collected from both the electric vehicle (EV) and electric vehicle supply equipment (EVSE) at a rate of 10Hz and entered into a time-series database for analysis. These charge profiles are captured under nominal and off-nominal conditions, exploring the impact of battery state of charge (SOC), battery temperature, vehicle condition, smart charge management (SCM), and EVSE limitations. Nominal conditions are defined to be ideal conditions that should transfer the maximum allowable energy in the minimum possible amount of time. Nominal condition profiles are compared across EVs to characterize state-of-the-art EV charging performance against one another. Off-nominal condition profiles are compared against its nominal condition profile counterpart to highlight the variance across less desirable starting conditions within a single EV. Under nominal conditions, most EVs can achieve the original equipment manufacturer (OEM) rated peak-power and charge times. Peak power across EVs has variance due to the vehicle design, battery topology, charging strategy, etc. These 10-100% nominal preconditioned charge profiles across 13 EVs (11 light-duty (LD), 2 heavy-duty (HD)) were used for analysis in power curve analysis, power distribution, SOC and range comparison, thermal impacts of current draw, battery pack size and energy charged, and ramp rates. Power curve analysis show the uniqueness in power vs time curves across all EVs, breaking down the features of a typical profile and where variation is typically seen. Power distribution results showed that over 50% of charge time is spent below 50kW and only 12.1% is spent above 200kW. SOC and range performance yielded different top performing EVs when exploring goals of performance from SOC and range gained after 10-min (EV2) and 20-min (EV8), and time-to-achieve 80% SOC (EV8) and 200 miles of range (EV1). Current draw from 400-volt EVs had a higher thermal impact to cable/connector temperatures when compared to 800-volt EVs, due to a higher current requirement to achieve similar power levels. There was high variance in C rating, a useful metric when comparing the relationship between peak/average charge session power and relative battery pack size, across EVs under test. Ramp rates during initial power transfer were examined, fastest and slowest speeds ranging from 192.5kW/second to 2.6kW/second respectively. A similar analysis of ramp rates was also conducted for OCPP curtailment testing, where EVs underwent a 2-minute 65A curtailment request before returning to full-power charge. Under off-nominal conditions, most EVs experienced variation from the nominal condition profiles. EVs that underwent the full set of NGP defined testing conditions were compared, analysis of which was categorized by 800-volt and 400-volt EVs. It should be noted that the 800-volt EVs had significantly higher peak power ratings than the 400-volt EVs, and thus were more prone to variance. Initial state of charge, battery temperature, and vehicle condition had a considerable impact on peak power levels and charge time for the 800-volt vehicles under test. EVSE limited tests lowered achievable power down to 200kW, greatly impacted 800-volt charging power, and had little to no effect on 400-volt charging power. Adapter testing was performed on a single 400-volt EV, where power and current limitations were found but overall charge time was not significantly impacted. Adapter and boost converter testing was performed on a single 800-volt EV, where both charge power and charge time were greatly impacted. Charge profiles are unique, and comparing such requires analysis that examines starting conditions, vehicle and battery topologies,
Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.
This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level. Using charging data from over 4,600 EV drivers, the study analyzed SCM’s impact on the distribution systems of BGE and Pepco, which consists of over 2000 feeders. Unlike prior research that focused on system-wide trends or synthetic feeders, this analysis offers granular, feeder-level insights based on real-world operational data. It highlights how transformer density, load profiles, and infrastructure constraints influence smart charging performance. Results show feeder-level conditions play a crucial role in SCM effectiveness, with most feeders benefiting more from LB, while TOU-based SCM may be sufficient for others. By 2035, LB reduced peak charging loads by 27% on average, compared to 23% under TOU-based SCM, though some feeders saw reductions exceeding 35%, while others experienced minimal impact. Feeders with higher transformer utilization and limited capacity benefited more from LB, which more effectively distributed charging demand during off-peak hours. Beyond reducing grid constraints, SCM offers long-term operational and financial benefits. By shifting EV charging demand strategically, utilities can optimize asset utilization, delay infrastructure investments, and enhance grid performance. In terms of infrastructure upgrade deferrals, at the feeder level, LB consistently reduced peak charging loads and resulting infrastructure upgrade costs, particularly in high EV enrollment areas, decreasing the number of overloaded transformers by up to 35%, while TOU-based SCM achieved 20-30% reductions depending on feeder characteristics. At the system level, LB has the potential to defer total upgrade costs by $\$$186 million for BGE, compared to $\$$159 million under TOU-based SCM. For Pepco, TOU-based SCM performed slightly better, deferring upgrade costs by $\$$30 million, compared to $\$$29 million under LB. Section 4.5 reviews some of the system differences between BGE and Pepco. However, as EV adoption scales, TOU-based SCM will introduce secondary peak charging loads, reinforcing the need for more advanced, adaptive SCM approaches to prevent new grid challenges. As EV adoption continues to grow, feeder-level managed charging strategies will be essential for mitigating grid stress, improving infrastructure efficiency, and maintaining energy affordability for consumers. This report provides critical insights for utilities, Public Utility Commissions (PUCs), and state agencies on the role of feeder-specific smart charging in infrastructure planning, policy development, and grid modernization. The findings underscore the importance of tailored, data-driven SCM solutions that align with local grid conditions, ensuring a resilient, cost-effective transition to increasing EV adoption while safeguarding distribution system performance.
Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.
With the rapid advancement and acceleration in the electric vehicle (EV) industry within the United States, major automakers and EV charging companies are increasingly adopting the North American Charging Standard (NACS) connector style, now officially known as J3400. This shift is expected to enhance charging infrastructure, providing a better customer experience by making it easier for all EV drivers to access a wider network of direct-current (DC) fast chargers (DCFCs). However, the adoption of the J3400 standard presents challenges for many EVs already on the roads and some currently coming off production lines that are equipped with the Combined Charging System (CCS) connector, which this report will refer to as the North American standard, CCS1. These vehicles will need adapters to use new or existing J3400 infrastructure. During this transition, several issues have emerged. Firstly, there is a need to standardize the new connector type to ensure it is interoperable, safe, and reliable. Second, existing CCS EV drivers need a way to access the J3400 network, which will require electric vehicle supply equipment (EVSE) or sites with both connector types, driver-provided adapters to physically convert from CCS to J3400, or EVSE with retained adapters designed for use with the EVSE. Third, adapter standards will need to be written to specify how they will be designed and what evaluations will be needed to ensure safe and reliable performance. To address these challenges, adapters that support different types of charging connectors will be essential. These adapters will play a crucial role in supporting the transition and ensuring continued service for legacy EVs with CCS inlets as the J3400 standard becomes the predominant one in the United States. Consequently, the National Charging Experience (ChargeX) Consortium has investigated and performed a teardown analysis on the different adapter versions on the market. The aim is to create a failure mode and effects analysis (FMEA) on what are expected to be the most common adapter types used in this transition. In order to support this work, we executed an FMEA exercise with the main goal of identifying gaps in the existing adapters' performance and conformance to the most common safety requirements of high-power and high-voltage devices. This effort focused on adapters provided by the driver, as these may present the highest safety and reliability risks. The recommendations made here apply to both retained and driver-provided adapters.
Range anxiety and long battery charging time continue to be critical challenges to mass adaptation of EVs. A major identified gap to wider adoption of BEVs is the ability and availability to refuel quickly or to fast charge. Studies have shown that in areas where drivers have access to 50-kW or 120-kW fast charge stations, annual electric vehicle (EV) miles traveled (i.e., eVMT) increased by over 25%, even in cases where fast charging was used for 1% to 5% of total charging events. Charge stations of higher power not only alleviate the “range anxiety” and reduce the driver’s waiting time, but also requires less investment. Michigan Energy Office completed a study in early 2019 titled “Electric Vehicle Charger Placement Optimization in Michigan: Phase I – Highways”. This study finds a system with 150kW chargers, though more expensive individually, actually has lower total system cost when compared to a 50kW charging system when serving the same battery size EV. To be truly competitive to the ICEV refueling experience, even higher power stations are necessary. However, high power charge stations would create large power draws from the grid. If this occurs during peak demand periods, grid capacity could be overloaded. This problem needs to be addressed to reduce the impact on the electric utility infrastructure. The main goal of this project is to develop a 400-kW/400-A XFC system targeting total efficiency of 96.5 percent from the MVAC grid to a vehicle. The novel SST power cell topology, combined with a new silicon carbide (SiC) MOSFET device, enables a 3.5 percent improvement in system efficiency, a 50-percent smaller equipment footprint, and four times less weight than today’s DCFC systems. The SST technology would directly utilize MVAC at 4.8-kV or 13.2-kV. This would eliminate the line frequency transformer (LFT), which steps down medium-voltage AC to 3-Phase 480-V line-to-line voltage in current DCFC systems.
The key technology barriers that hinder the growth of Electric Vehicles (EVs) are long charging time, the shorter life-time of EV batteries, and battery safety. Specifically, EV charging protocols have significant effects on battery lifetime and safety. If not charged properly, the battery could end up with shorter life, and more importantly, improper charging can cause battery faults leading to catastrophic failures. To overcome these barriers, we propose a closed-loop feedback based approach, that enables real-time optimal fast charging protocol adaptation to battery health and possess active diagnostic capabilities in the sense that, during charging, it detects real-time faults and takes corrective action to mitigate such fault effects. We utilize battery electrical-thermal model, explicit battery capacity and power fade aging models, and thermal fault model to capture battery behavior. In conjunction with the models, we adopt linear quadratic optimal control techniques to realize the feedback-based control algorithm. Simulation studies are presented to illustrate the effectiveness of the proposed scheme.
This paper presents a stability analysis of parallel-connected bi-directional series-series resonant network wireless power transfer (WPT), optimized for Electric Vehicle (EV) charging and vehicle-to-grid (V2G) applications. The study addresses critical stability challenges in systems integrated with diverse distributed energy resources (DERs), including photovoltaics, fuel cells, wind turbines, energy storage systems, and the AC grid. The stability of such integrated DC grid systems is paramount for ensuring reliable operation, particularly under varying power flow conditions and dynamic interactions between parallel WPT systems. The analysis included system impedance characterization, state-space modeling, and open and closed-loop stability evaluations. The results demonstrated that the integration of a robust control architecture effectively mitigates instability risks and supports scalable, efficient operation. This work underscores the converter's adaptability and its potential for large-scale deployment in wireless EV charging infrastructures and integrated DC grid systems.
The rapid increase in electric vehicle (EV) adoption demands enhancements in the efficiency and adaptability of EV supply equipment (EVSE). Traditional EVSE systems often fail to optimize power delivery to meet the variable acceptance rates of EV batteries, resulting in significant energy wastage and reduced operational efficiency. This research addresses these challenges by integrating queuing theory with modular EVSE architectures, offering a dual strategy to optimize the operation of EV charging stations. A simulation model was developed to assess various configurations of charger capacities and outlet numbers. This model aimed to identify the optimal setup that maximizes station utilization while minimizing charging times and maximizing throughput. The model focused on charger capacities ranging from 50 to 250 kW and analyzed the different capacities’ effects on charging times and the number of vehicles served. The results indicate that a charger capacity of 125 kW is optimal, striking a balance between the charging time and the number of EVs served per hour, thus achieving the highest station utilization rate. This capacity allows for servicing a significant number of EVs with moderate increases in charging times. Lower capacities, although capable of serving more vehicles, lead to longer charging times and decreased throughput efficiency. The study underscores the effectiveness of combining queuing theory with flexible, modular charging systems that can dynamically adjust to EV charging demands.
As part of the Next-Gen Profiles (NGP) project, the profile capture and analysis of production electric vehicles undergoing high-power charging (HPC) is conducted over a wide range of conditions to explore variance and performance. Charge session parameters are collected from both the electric vehicle (EV) and electric vehicle supply equipment (EVSE) at a rate of 10Hz and entered into a time-series database for analysis. These charge profiles are captured under nominal and off-nominal conditions, exploring the impact of starting battery state of charge (SOC), battery temperature, vehicle condition, smart charge management (SCM), EVSE limitations and charging adapter usage. Nominal conditions are defined as ideal conditions that should transfer the maximum allowable energy in the minimum possible amount of time. Nominal condition profiles are compared across EVs to characterize state-of-the-art EV charging performance against one another. Off-nominal condition profiles are compared against their nominal condition profile counterparts to highlight the variance across less desirable starting conditions within a single EV.
Abstract Lithium iron phosphate (LiFePO 4 , LFP) has long been a key player in the lithium battery industry for its exceptional stability, safety, and cost-effectiveness as a cathode material. Major car makers (e.g., Tesla, Volkswagen, Ford, Toyota) have either incorporated or are considering the use of LFP-based batteries in their latest electric vehicle (EV) models. Despite LFP’s well-researched status as a cathode material, it is expected to fulfill additional demands in electric vehicle applications, such as fast-charging capabilities, wide temperature range adaptability, and higher energy density. This perspective examines the LFP supply chain, synthetic approaches, manufacturing processes, market trends, recent advancements, and evolving demands to better understand its future role in the EV market. Graphical abstract
The integration of electric vehicles (EVs) into electric grid operations can potentially leave the grid vulnerable to cyberattacks from both legacy and new equipment and protocols, including extreme fast-charging infrastructure. This paper introduces a co-simulation platform to perform cyber vulnerability analysis of EV charging infrastructure and its dependencies on communications and control systems. Grid impact scenarios through linkages to power system simulation tools such as OpenDSS and vehicle infrastructure-specific attack paths are discussed. An adaptive platform that assists with predicting and solving evolving cybersecurity challenges is demonstrated with a cyber-energy emulation that accelerates the analysis of cyberattacks and system behavior.
A key goal of NextGen Profiles' fleet utilization study was to conduct a comprehensive, strategic, and standardized assessment of the operational behavior and utilization patterns across EV and EVSE production-ready fleets. These data-driven insights were intended to inform current fleet management strategies and support future infrastructure planning, ensuring the effective adoption and adaptation of the growing EV fleet market. The study applied a series of metrics defined in NextGen Profiles to evaluate diverse fleet operations across various use cases, emphasizing trends in charging, routing, and other critical behaviors. The fleet utilization dataset includes these three sets of metrics from 17 EV fleets, each consisting of a wide range of vehicle types and operational categories, as well as two EVSE fleets. Data were collected from a variety of sources and reformatted into a unified structure before metric computation, ensuring consistency and comparability across all fleets. To protect confidentiality, all fleet metadata are anonymized, and the publicly released metric datasets are aggregated to an hourly cadence.
The primary objective of this project is to determine the incremental value created with the medium voltage solid-state transformer (MV SST) technology to different stakeholders in view of the updated DER grid regulations. This includes studying the benefits of the MV SST technology in a range of use cases for EV and DER penetration including (1) “corridor charging” for EVs and (2) solar plus storage (FERC 2222). The potential customers of this technology include utilities for EV charging, DER installers who must meet utility interconnection requirements, balancing authorities, and DER aggregators. The traditional transformers on the grid could be a limiting factor for the EV-grid integration as the distribution transformers were not designed to handle the dynamic and fluctuating EV charging loads. Thus, the issues such as voltage fluctuations, increased losses and reduced efficiency [1] can negatively impact the grid operation. To address these challenges, transformers with flexibility and adaptability become imperative to meet the evolving energy demands. In this regard, the concept of Medium Voltage Solid-State Transformers.
The integration of electric vehicles (EVs) into electric grid operations can potentially leave the grid vulnerable to cyberattacks from both legacy and new equipment and protocols, including extreme fast-charging infrastructure. This paper introduces a co-simulation platform to perform cyber vulnerability analysis of EV charging infrastructure and its dependencies on communications and control systems. Grid impact scenarios through linkages to power system simulation tools such as OpenDSS and vehicle infrastructure-specific attack paths are discussed. An adaptive platform that assists with predicting and solving evolving cybersecurity challenges is demonstrated with a cyber-energy emulation that accelerates the analysis of cyberattacks and system behavior.