LogPath: Log data based energy consumption analysis enabling electric vehicle path optimization

Vehicle navigation and path optimization require a more meticulous approach when it deals with EVs (electric vehicles) and SDVs (software-defined vehicles), due to lengthy charging times and the lack of charging infrastructure. Long-distance freight EV trucking needs path guidance with accurate energy consumption estimates to prevent charging-related failures. We developed a novel energy consumption estimation approach that only uses battery log data to extract major vehicle parameters to increase EV navigation accuracy without additional sensors. This is enabled by extracting multiple drive modes from the log data for analysis. The system provides 1) routes, 2) charge locations, 3) charging times, and 4) optimal vehicle speeds that guarantee the shortest travel time. Here we successfully validated the system using log data collected from an EV and Tesla's Supercharging map in the US and compared it with the commercially available navigation system, Tesla's trip planner, whose capabilities solely include charging time and routing.

EV (Electric vehicles) navigation↗

Navigating Common Electric Vehicle and Charging Infrastructure Concerns

Increasing knowledge about electric vehicles (EVs) can increase Tribal member comfort level with the technology, leading to increased EV adoption. This fact sheet lists common EV and charging infrastructure concerns and provides information to help address these hurdles during engagement with Tribal communities.

33 ADVANCED PROPULSION SYSTEMS↗

Become EV Friendly With Planning Resources for Charging Infrastructure

State and local governments are key to the successful build-out of a nationwide electric vehicle (EV) charging infrastructure network. Visit the Alternative Fuels Data Center for resources on EV infrastructure planning, including key considerations and best practices for navigating regulatory updates to streamline infrastructure build-out.

ADVANCED PROPULSION SYSTEMS↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Navigating Options for Transportation Electrification and Solar Charging: Steps and Lessons Learned in Montana Communities

This document is intended to assist communities who are considering investing in electric transportation. It can assist communities engage stakeholders, prioritize community goals, assess electric transportation options, and navigate complex decisions about deploying zero emission electric transportation in their community. It covers technological, economic and environmental aspects of the transition to electric vehicles (EV), and highlights the specific considerations related to the deployment of renewable energy technologies (e.g., distributed solar) in combination with EV supply equipment (EVSE, e.g., charging stations). There are many important decisions to make and questions for communities to ask themselves as they consider electric vehicle types, charging infrastructure, and electricity generation options. This guide will help communities assess: (1) Which stage in the decision-making process they are in with respect to EV deployment; (2) Questions they can explore to guide their decisions about EV deployment; (3) How to engage key stakeholders on EV deployment options; (4) Tradeoffs and benefits of various electric transportation options and; (5) Synergies of pairing electric vehicle charging and renewable energy generation technologies. The analysis and lessons learned presented in this roadmap are intended to serve as a template and guide for similarly situated communities across the country who want to prepare for and play a role in the electrified transportation future.

14 SOLAR ENERGY↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗