Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EV”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVs@Scale Next-Gen Profiles - EV Profile Capture 2023

As part of the U.S. DOE EVs@Scale consortium Next-Gen Profiles (NGP) project, the profile capture of production electric vehicles undergoing high power charging (HPC) is conducted over a wide range of conditions to explore variance and performance. Charge session parameters are collected from both the electric vehicle (EV) and electric vehicle supply equipment (EVSE) at a rate of 10Hz and entered into a time-series database for analysis. These charge profiles are captured under nominal and off-nominal conditions, exploring the impact of battery state of charge (SOC), battery temperature, vehicle condition, smart charge management (SCM), and EVSE limitations. Nominal conditions are defined to be ideal conditions that should transfer the maximum allowable energy in the minimum possible amount of time. Nominal condition profiles are compared across EVs to characterize state-of-the-art EV charging performance against one another. Off-nominal condition profiles are compared against its nominal condition profile counterpart to highlight the variance across less desirable starting conditions within a single EV. Under nominal conditions, most EVs can achieve the original equipment manufacturer (OEM) rated peak-power and charge times. Peak power across EVs has variance due to the vehicle design, battery topology, charging strategy, etc. These 10-100% nominal preconditioned charge profiles across 13 EVs (11 light-duty (LD), 2 heavy-duty (HD)) were used for analysis in power curve analysis, power distribution, SOC and range comparison, thermal impacts of current draw, battery pack size and energy charged, and ramp rates. Power curve analysis show the uniqueness in power vs time curves across all EVs, breaking down the features of a typical profile and where variation is typically seen. Power distribution results showed that over 50% of charge time is spent below 50kW and only 12.1% is spent above 200kW. SOC and range performance yielded different top performing EVs when exploring goals of performance from SOC and range gained after 10-min (EV2) and 20-min (EV8), and time-to-achieve 80% SOC (EV8) and 200 miles of range (EV1). Current draw from 400-volt EVs had a higher thermal impact to cable/connector temperatures when compared to 800-volt EVs, due to a higher current requirement to achieve similar power levels. There was high variance in C rating, a useful metric when comparing the relationship between peak/average charge session power and relative battery pack size, across EVs under test. Ramp rates during initial power transfer were examined, fastest and slowest speeds ranging from 192.5kW/second to 2.6kW/second respectively. A similar analysis of ramp rates was also conducted for OCPP curtailment testing, where EVs underwent a 2-minute 65A curtailment request before returning to full-power charge. Under off-nominal conditions, most EVs experienced variation from the nominal condition profiles. EVs that underwent the full set of NGP defined testing conditions were compared, analysis of which was categorized by 800-volt and 400-volt EVs. It should be noted that the 800-volt EVs had significantly higher peak power ratings than the 400-volt EVs, and thus were more prone to variance. Initial state of charge, battery temperature, and vehicle condition had a considerable impact on peak power levels and charge time for the 800-volt vehicles under test. EVSE limited tests lowered achievable power down to 200kW, greatly impacted 800-volt charging power, and had little to no effect on 400-volt charging power. Adapter testing was performed on a single 400-volt EV, where power and current limitations were found but overall charge time was not significantly impacted. Adapter and boost converter testing was performed on a single 800-volt EV, where both charge power and charge time were greatly impacted. Charge profiles are unique, and comparing such requires analysis that examines starting conditions, vehicle and battery topologies,

Charging↗

EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals [Slides]

The Electric Vehicle (EV) Champion Training Series, hosted by the National Renewable Energy Laboratory (NREL), is tailored for fleet managers, facility managers, and other stakeholders involved in the deployment of EVs and charging stations. This series equips participants with the skills and knowledge necessary to become subject matter experts in EV implementation. This is the first training in a four-part series and serves as an introductory training. This training covers fundamental topics such as EV and charging technology, utility basics, and financial considerations for EVs. Additionally, this session introduces the Federal Fleet ZEV Ready Center framework, a one-stop location for federal fleet electrification resources. Participants will gain a solid foundation to support the effective deployment and management of EVs and their infrastructure. Visit the Federal Fleet ZEV Ready Center website to learn more about the ZEV Ready Center process. EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals will enable attendees to: Identify EV and EV charging technology fundamentals; Recognize EV market and GSA Schedule options; Identify utility basics, incentives, and rates as they relate to EV charging; and Identify methods to calculate life cycle costs for EVs and gasoline vehicles.

30 DIRECT ENERGY CONVERSION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

EVs@Scale Next-Gen Profiles - EV Profile Capture 2024

As part of the U.S. DOE EVs@Scale consortium Next-Gen Profiles (NGP) project, the profile capture and analysis of production electric vehicles undergoing high power charging (HPC) is conducted over a wide range of conditions to explore variance and performance. Charge session parameters are collected from both the electric vehicle (EV) and electric vehicle supply equipment (EVSE) at a rate of 10Hz and entered into a time-series database for analysis. These charge profiles are captured under nominal and off-nominal conditions, exploring the impact of battery state of charge (SOC), battery temperature, vehicle condition, smart charge management (SCM), and EVSE limitations. Nominal conditions are defined to be ideal conditions that should transfer the maximum allowable energy in the minimum possible amount of time. Nominal condition profiles are compared across EVs to characterize state-of-the-art EV charging performance against one another. Off-nominal condition profiles are compared against its nominal condition profile counterpart to highlight the variance across less desirable starting conditions within a single EV. This EV Profile Capture 2024 report stands as an update from the EV Profile Capture 2023 report to include the additional EV & EVSE assets tested and analyzed in 2024. The major updates within this report include the addition of three next-generation electric vehicles, added test cases, and further analysis. This expansion of analysis includes power profiles, power distribution, quantifying SOC, energy and range performance, EVSE limitation impacts, boost converter performance, etc. Additionally, NGP time-series data has been used as input towards three national laboratory-led grid modelling efforts: ANL’s IEEE-37 HIL model, INL’s Caldera model, and NREL’s EVI-X model. A summary of these platforms and how NGP has worked to improve their effectiveness has also been added to this years’ report.

Thurston, Sam↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

Short-Term Load Forecasting Considering EV Charging Loads with Prediction Interval Evaluation

Short-term load forecasting plays a critical role in power system planning and operation. Along with the electrification of various loads, electricity demands are becoming increasingly hard to predict. Notably, the recent rise in electric vehicles (EVs) has further contributed to this unpredictability. To address this issue, this paper proposes a probabilistic load forecasting strategy utilizing Gaussian process regression, structured in a day-ahead manner. While many works focus on deterministic prediction, probabilistic forecasting offers additional insights into variability and uncertainty, enabling more flexible and reliable operation for power systems. To enhance the accuracy of the load forecasting model, the inputs include features related to EV charging habits as well as commonly used weather information. The load forecasting results are evaluated using various metrics, including conventional ones that assess the accuracy of point forecasts, as well as additional metrics that test the reliability of prediction intervals. The proposed load forecasting method is finally tested on real residential power consumption data and EV charging data sampled from real-world sources. The results prove that the new features can greatly improve the performance of the load forecasting method.

electrical vehicle↗

Is the Adoption of Electric Vehicles (EVs) and Solar Photovoltaics (PVs) Interdependent or Independent? An Integrated EVs-PVs Modeling Framework

Transportation and residential energy consumption account for more than one-half of the overall energy consumption in the United States. Adoption of electric vehicles (EVs) can play a key role in decarbonizing the transportation sector, while the adoption of renewable energy sources (e.g., solar photovoltaics or PVs) could bring similar benefits to the residential energy sector and in turn support transport electrification. Although the market share for both EVs and PVs continue to grow, both these emerging technologies are deployed rather disjoint without considering the existence of potential similarities among users who own (or aspire to own) EVs and PVs. This might be due to lack of understanding of the behavioral interdependence in consumer preferences towards these technologies. To fill this gap in knowledge, this study utilizes data from the 2018 WholeTraveler Transportation Behavior Study to develop an integrated model system that explores EV and PV adoption behaviors. A structural equations model (SEM) is employed that incorporates direct effects as well as error correlations among the adoption behaviors for EVs and PVs. Model results indicate that the adoption behavior for both these technologies is indeed interconnected and significantly influenced by attitudes, values and personality traits. Findings from this research suggest that incentives (e.g., subsidies) that drive 'bundled' adoption of EVs and PVs could accelerate the adoption of both these sustainable technologies. The results highlights the need to consider transport and building energy efficient technology adoption behavior in a single integrated structure.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

EV Champion Training Webinar 2: ZEV and EV Charging Planning [Slides]

The Electric Vehicle (EV) Champion Training Series, hosted by the National Renewable Energy Laboratory (NREL), is tailored for fleet managers, facility managers, and other stakeholders involved in the deployment of EVs and charging stations. This series equips participants with the skills and knowledge necessary to become subject matter experts in EV implementation. This is the second training in a four-part series and serves as an intermediate training. This training covers the first four steps in the ZEV Ready Center process, including how to identify and train your zero-emission vehicle (ZEV) team, align headquarters strategy with site-level planning, identify ZEV opportunities, and identify charging needs for your project sites. Participants will gain a solid foundation to support the effective deployment and management of EVs and their infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Transient pulse‐based impedance characterisation of DC‐link capacitor for EV systems

In this study, a method for impedance characterisation of DC‐link capacitors based on transient pulse analysis is proposed. The fundamentals of the concept are presented and design considerations are discussed. The functionality of the proposed approach is supported by SPICE simulation with two different commercial capacitors from different manufacturers and validated with experimental results. Experimental results for equivalent series resistance, equivalent series inductance (ESL) and capacitance estimation are presented for commercial DC‐link capacitors and compared with component analyser results. The simulation and experimental results show that the proposed method is a promising candidate for capacitance and ESL estimation of capacitors in EV traction systems.

Gurpinar, Emre↗

Detection of hot electrons originating from an upper valley at ∼1.7eV above the Γ valley in wurtzite GaN using electron emission spectroscopy

Using electron emission spectroscopy, measurement and analysis were conducted on the energy distribution of vacuum emitted electrons from electrically driven InGaN/GaN green (peak wavelengths 𝜆 ≈ 515nm) light-emitting diodes (LEDs) with and without a prewell superlattice (SL). Here, we report on the detection of a high-energy upper valley at ∼ 1.7eV above the Γ valley from samples with no prewell SL. We propose that these upper valley electrons originate predominantly from trap-assisted Auger recombination (TAAR) in green LEDs, as the intensity of these peaks is found to have quadratic dependence on the carrier density 𝑛 [see Espenlaub et al., J. Appl. Phys. 126, 184502 (2019)]. The high-energy upper valley peak was not observed in the sample with a prewell SL which is attributed to gettering by the prewell SL of still unidentified impurities that act as TAAR centers.

carrier generation & recombination↗

Western Smart Regional EV Adoption and Infrastructure at Scale- WestSmartEV@Scale (Budget Period 2 – Milestone Report – TNC EV Study)

WestSmartEV@Scale is a comprehensive research project addressing key opportunities to decarbonize transportation throughout the Rocky Mountain West. Building upon the framework established in the original WestSmart project, unique subprojects are scoped targeting transportation emissions across light-, medium-, and heavy-duty vehicles with consideration of equity and access. This report summarizes the progress to date on Subproject 6, TNC EV Study (Urban Mobility). It is comprised of three sections: • Outreach and participant recruitment; • Survey data collection and analysis; and • BEV driver driving and charging behavior data collection and analysis.

33 ADVANCED PROPULSION SYSTEMS↗

EV Load Forecasting Guide: A Report by the Energy Systems Integration Group’s EV Load Forecasting Task Force

Forecasting electricity usage is a foundational planning activity for utilities, underpinning billions of dollars in grid investments that ensure system reliability. Historically, forecasting relied on trends in economic and population growth; however, transportation electrification presents a new and complex planning challenge. Unlike conventional loads, electric vehicle (EV) charging has relatively limited usage history. In addition, charging is driven by complex human behaviors, is mobile, and at the same time can concentrate geographically in ways that, without proper planning, can quickly overwhelm local distribution systems.

Giraldez, Julieta [Electric Power Engineers, Austi↗

Optimal Siting of EV Fleet Charging Station Considering EV Mobility and Microgrid Formation for Enhanced Grid Resilience

Coordinating infrastructure planning for transportation and the power grid is essential for enhanced reliability and resilience during operation and disaster management. This paper presents a two-stage stochastic model to optimize the location of electric vehicle fleet charging stations (FEVCSs) to enhance the resilience of a distribution network. The first stage of this model deals with the decision to place an FEVCS at the most favorable and optimized location, whereas the second stage aims to minimize the weighted sum of the value of lost load in multiple potential scenarios with different faults. Indeed, the second stage is a joint grid restoration scheme with network reconfiguration and microgrid formation using available distributed generators and fleet electric vehicles. The proposed model is tested on a modified IEEE-33 node distribution network and a four-node transportation network. Case studies demonstrate the effectiveness of the proposed model.

25 ENERGY STORAGE↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A novel large-scale EV charging scheduling algorithm considering V2G and reactive power management based on ADMM

Electric vehicle aggregators (EVAs) that utilize vehicle-to-grid (V2G) technologies can function as both controllable loads and virtual power plants, providing key energy management services to the distribution system operator (DSO). EVAs can also balance the grid’s reactive power as a virtual static VAR compensator (SVC) and provide voltage stability by utilizing advanced electric vehicle (EV) chargers that are capable of four-quadrant operations to provide reactive power management. Finally, managed charging can benefit EVAs themselves by minimizing power factor penalties in their electricity bills. In this paper, we propose a novel EV charging scheduling algorithm based on a hierarchical distributed optimization framework that minimizes peak load and provides reactive power compensation for the DSO by collaboration with EVAs that manage both the active and the reactive charging and discharging power of participating EVs. Utilizing the alternative direction method of multipliers (ADMM), the proposed distributed optimization approach scales well with increased EV charging infrastructure by balancing active and reactive power while decreasing computational burden. In our proposed hierarchical approach, each EVA schedules the active and reactive EV charging and discharging power for 1) reactive power compensation in order to minimize power factor penalty and electricity cost accrued by the EVA, 2) satisfaction of each EV’s energy demand at minimal charging cost, and 3) peak shaving and load management for the DSO. When compared with an uncoordinated charging model, the efficacy of this proposed model is successfully demonstrated through a 300% decreased peak EV load for the DSO, 28% lower electricity costs for EV users, and 98.55% smaller power factor penalty, along with 17.58% lower overall electricity costs, for EVAs. The performance of our approach is validated in a case study with 50 EVs at multiple EVAs in an IEEE 13-bus test case and compared the results with uncoordinated EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV SALaD 2023 Demonstration: Best Practices and Mitigations for Protecting EVSE Infrastructure

The Electric Vehicle Secure Architecture Laboratory Demonstration (EV SALaD) program is a demonstration of cybersecurity best practices for high-power electric vehicle (EV) charging infrastructure led by Idaho National Laboratory (INL), in collaboration with other DOE National Laboratories participating in the EVs at Scale Consortium.a Sandia National Laboratories (SNL) and Pacific Northwest National Laboratory (PNNL) participated in the first 2-year (FY22-23) demonstration cycle for EV SALaD. This report documents the FY23 demonstration, the second in a series of demonstrations and collaborations in deploying and operating cybersecure EV charging infrastructure. It includes a summary of improvements from the FY22 demonstration, technical analysis of the FY23 demonstration, how the research demonstrates cyber-physical and cybersecurity best practices for high-power EV charging infrastructure, and related impacts to national and energy security. For EV SALaD, the FY22 demonstration focused on the detection, ranking, and prioritization of anomalous events for high-power EV charging. The FY23 demonstration additionally included the demonstration of cybersecurity best practices, which included protection and mitigation solutions to prevent, respond, and recover from anomalous events. During the demonstrations, the multi-lab EV SALaD team conducted a Test Effect Payload (TEP)b evaluation on extreme fast charger (XFC) hardware equipped with Cerberus, a detection and response solution, to demonstrate anomaly detection and mitigation cybersecurity best practices against cyber-enabled events.

33 ADVANCED PROPULSION SYSTEMS↗