Equipment specification for a space rated radar altimeter Final technical report
Equipment specifications for GEOS C mission altimeters
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Equipment specifications for GEOS C mission altimeters
This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, and potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI, and PET/CT Understand the process of budget request, equipment justification, comparisons of technical specifications, site visits, vendor selection, and contract development.
Systems design analysis of unified S-band system for Apollo network - operations room equipment, performance evaluations, and equipment specifications
The work performed under this agreement before the No/Go decision amounted to the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5.Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability); 7. Go / No-Go, Purchase Orders, Equipment build & commissioning next All other future task were not completed because during the Go /No-Go decision it was confirmed this project was a "No-Go" and did not proceed past BP1; these included the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5. Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability) In final preparation of the termination of the Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly, Cummins has purchased no equipment with government funds, and there is no government-owned property in Cummins possession related to this project. Minimal labor and travel were completed and paid. This acts as the Final technical report and concludes our business with DOE on this grant.
A specification catalog to define the equipment to be used for conducting life sciences experiments in a space laboratory is presented. The specification sheets list the purpose of the equipment item, and any specific technical requirements which can be identified. The status of similar hardware for ground use is stated with comments regarding modifications required to achieve spaceflight qualified hardware. Pertinent sketches, commercial catalog sheets, or drawings of the applicable equipment are included.
Working data on the equipment items within the Life Sciences Laboratory Common Equipment Inventory are presented. For Vol. 1, see N76-15765.
The equipment specifications for the thematic mapper and high resolution pointable imager for use on the Earth Observatory Satellite (EOS) are presented. The interface requirements of the systems are defined. The interface requirements are extracted from the equipment specifications and are intended as a summary to be used by the system and spacecraft designer. The appropriate documentation from which the specifications of the equipment are established are identified.
All general purpose equipment items contained in the final carry-on laboratory (COL) design concepts are described in terms of specific requirements identified for COL use, hardware status, and technical parameters such as weight, volume, power, range, and precision. Estimated costs for each item are given, along with projected development times.
This document specifies parts, materials, and processes used in the fabrication, maintenance, repair, and procurement of electrical and electronic control and monitoring equipment associated with ground support equipment (GSE) at the Kennedy Space Center (KSC).
This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.
Brayton cycle compressor research package for testing aerodynamic performance of Brayton cycle compressors, with equipment specifications
Biorefineries are subject to environmental laws, including complex air quality regulations that aim to protect and improve the quality of the air. These regulations govern the amount of certain types of air pollutants that can be emitted from different types of emission sources. To determine which federal air emission regulations potentially apply to the fast pyrolysis biorefinery, we first identified the types of regulated air pollutants emitted to the ambient environment by the biorefinery or from specific equipment. Once the regulated air pollutants are identified, we review the applicability criteria of each federal air regulation to determine whether the fast pyrolysis biorefinery or specific equipment is subject to it. We then estimate the potential-to-emit of pollutants likely to be emitted from the fast pyrolysis biorefinery to understand the air permitting requirements.
Biorefineries are subject to environmental laws, including complex air quality regulations that aim to protect and improve the quality of the air. These regulations govern the amount of certain types of air pollutants that can be emitted from different types of emission sources. To determine which federal air emission regulations potentially apply to the sugars-to-hydrocarbon (HC) biorefinery, we first identified the types of regulated air pollutants emitted to the ambient environment by the biorefinery or from specific equipment. Once the regulated air pollutants are identified, we review the applicability criteria of each federal air regulation to determine whether the sugars-to-HC biorefinery or specific equipment is subject to it. We then estimate the potential-to-emit of pollutants likely to be emitted from the sugars-to-HC biorefinery to understand the air permitting requirements.
This paper addresses issues related to the integration of principal investigators (PIs) and payload-element developers (PEDs) for conducting effective microgravity experiments. The Crystal Growth Furnace (CGF) is used as an example to demonstrate the key issues related to the integration of a PI's sample into a facility run by a different organization. Attention is given to the typical preflight timeline, documentation required for experimental implementation, and hardware deliverables. A flow chart delineates the payload-integration process flow, and PI inputs required for an experiment include equipment and procedure definitions, detailed design and fabrication of the experiment-specific equipment, and specifications of the contract-end item. The present analysis is of interest to the coordination of effective microgravity experiments on the Space Station Freedom that incorporate PIs and PEDs from different organizations.
Equipment specifications for Lunar Sounder Antenna Assembly
This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.
Interfaces between Algol ID Mod 2 propulsion system and Little Joe II launch vehicle, with equipment specifications
The International Space Station Environment Simulator (ISSES) is a virtual reality application that uses high-performance computing, graphics, and audio rendering to simulate the radiation and acoustic environments of the International Space Station (ISS). This CAVE application allows the user to maneuver to different locations inside or outside of the ISS and interactively compute and display the radiation dose at a point. The directional dose data is displayed as a color-mapped sphere that indicates the relative levels of radiation from all directions about the center of the sphere. The noise environment is rendered in real time over headphones or speakers and includes non-spatial background noise, such as air-handling equipment, and spatial sounds associated with specific equipment racks, such as compressors or fans. Changes can be made to equipment rack locations that produce changes in both the radiation shielding and system noise. The ISSES application allows for interactive investigation and collaborative trade studies between radiation shielding and noise for crew safety and comfort.