Semplastics EHC LLC DE-SC0018794 Final Report
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Various alternatives to traditional mechanical compressor systems have been considered, including MHC and EHC. Both MHCs and EHCs are solid-state systems that have no moving parts other than valves. Both are quiet and have low maintenance requirements. However, strength and material issues as well as water and heat management issues have challenged EHCs, especially, when operated at very high pressures. Similarly, low efficiency, especially, when staging is required to attain high, pressure ratios, has challenged MHCs and has made them too complex and expensive. Material degradation, due to hydrogen impurity effects, has also created issues for MHCs. One novel alternative evaluated here is to combine EHC and MHC technologies in a way to maximize their advantages and to minimize each of their challenges to improve the overall systems performance on a path to meet or exceed current DOE targets. A hybrid EH/MH compressor takes advantage of lower maintenance and operating costs as well as increased reliability associated with both the MHC and EHC technologies over traditional mechanical compressors. Neither the MHC nor the EHC have any moving parts other than valves. The hybrid system also takes advantage of the higher efficiency and lower cost of the EHC by operating at lower delivery pressures combined with the robust and simple operation of a single-stage, MH compressor at higher pressures. Both MHC and EHC technologies are scalable and can be used for a variety of hydrogen compression and delivery applications.
PurposeThis study was designed to evaluate the efficacy and safety in performing chemoembolization of extrahepatic collateral arteries (EHC) for hepatocellular carcinoma (HCC) located in the caudate lobe.MethodsBetween January 2006 and November 2013, chemoembolization via EHC was performed in 35 patients with 35 caudate HCCs. Preprocedural and follow-up CT or MR scans, angiographic images, and medical records were reviewed retrospectively in consensus. Chi-square analysis was used to evaluate the relationship between tumor characteristics and type of EHC and that between tumor response and the characteristics of the tumor and chemoembolization.ResultsIn 31 (88.6 %) patients, EHCs supplying the caudate HCC originated from the right inferior phrenic artery (RIPA). The remaining four HCCs were supplied by the gastroduodenal artery, dorsal pancreatic artery, and right and left gastric arteries. Superselective catheterization of tumor-feeding vessels from the EHC was achieved in 27 patients (77.1 %). There were no major complications. Individual tumor response supplied by the EHC at follow-up contrast-enhanced CT were as follows: complete response (n = 18), partial response (n = 9), stable disease (n = 3), and progressive disease (n = 3). Non-RIPA EHCs were significantly more common in patients who had previously received chemoembolization via the RIPA (50 %) than those who had not (6.5 %; P = 0.01). There was no significant predictive factor associated with tumor response.ConclusionsHCC in the caudate lobe can be supplied by several EHCs. Chemoembolization via these arteries can be performed safely and effectively.
Purpose: Extrahepatic cholangiocarcinomas (EHC) are rare tumors of the biliary tree because of their low incidence, large randomized studies examining radiotherapy (RT) for EHC have not been performed. The purpose of this study was to examine the role of adjuvant and palliative RT in the treatment of EHC in a large patient population. Methods and Materials: This was a retrospective analysis of 4,758 patients with EHC collected from the Surveillance, Epidemiology, and End Results database. The primary endpoint was overall survival. Results: Patients underwent surgery (28.8%), RT (10.0%), surgery and RT (14.7%), or no RT or surgery (46.4%). The median age of the patient population was 73 years (range, 23-104), 52.5% were men, and 80.7% were white. The median overall survival time was 16 months (95% confidence interval [CI] 15-17), 9 months (95% CI 9-11), 9 months (95% CI 9-10), and 4 months (95% CI 3-4) for surgery and RT, surgery, RT, and no RT or surgery, respectively. The overall survival was significantly different between the surgery and surgery and RT groups (p < .0001) and RT and no RT or surgery groups (p < .0001) on the log-rank test. The propensity score-adjusted analyses of surgery and RT vs. surgery (hazard ratio, 0.94; 95% CI, 0.84-1.05) were not significantly different, but that for RT vs. no RT or surgery (hazard ratio, 0.61; 95% CI, 0.54-0.70) was significantly different. Conclusion: These results suggest that palliative RT prolongs survival in patients with EHC. The benefit associated with surgery and RT was significant on univariate analysis but not after controlling for potential confounders using the propensity score. Future studies should evaluate the addition of chemotherapy and biologic agents for the treatment of EHC.
Conventional compressors have not been able to meet DOE targets for hydrogen refueling stations. They suffer from high capital cost, poor reliability and pose a risk of fuel contamination from lubricant oils. This project has significantly advanced the development of solid state hydrogen compressor technology for multiple applications. The project has achieved all of its major objectives. It has demonstrated capability of Electrochemical Hydrogen Compression (EHC) technology to potentially meet the DOE targets for small compressors for refueling sites. It has quantified EHC cell performance and durability, including single stage hydrogen compression from near-atmospheric pressure to 12,800 psi and operation of EHC for more than 22,000 hours. Capital cost of EHC was reduced by 60%, enabling a path to meeting the DOE cost targets for hydrogen compression, storage and delivery ($2.00-2.15/gge by 2020).
Electrochemical compression has the possibility to outcompete mechanical compression for hydrogen end- use applications. While HyET has a compressor that can output JO kilograms (kg)/day (fully scalable from home-to-industrial application) at up to 700 bar, the energy demand and reliability require top-quality electrochemical hydrogen compression (EHC) membrane electrode assemblies (MEAs), preferably prepared by cost-effective high-capacity manufacturing. High pressure requires a special MEA design, deviating from typical proton exchange membrane fuel cell (PEMFC) MEAs with adapted catalyst layer substrates, asking for a modified coating process. The National Renewable Energy Laboratory (NREL) will help HyET by developing an automated catalyst coating process fit for EHC MEA manufacturing. In addition, inline quality inspection methods will be developed/selected to improve the MBA quality as it is used for EHC stack assembly. In a joint effort, NREL and HyET will even design an automated manufacturing process for the EHC MEA and approach potential United States (US) suppliers of manufacturing equipment.
In October, 2007, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented the document Interim Measure Conceptual Design (Argonne 2007a) to the Kansas Department of Health and Environment, Bureau of Environmental Remediation (KDHE/BER), for a proposed non-emergency Interim Measure (IM) at the site of the former CCC/USDA grain storage facility in Centralia, Kansas (Figure 1.1). The IM was recommended to mitigate existing levels of carbon tetrachloride contamination identified in the vadose zone soils beneath the former facility and in the groundwater beneath and in the vicinity of the former facility, as well as to moderate or decrease the potential future concentrations of carbon tetrachloride in the groundwater. The Interim Measure Conceptual Design (Argonne 2007a) was developed in accordance with the KDHE/BER Policy No.BERRS-029, Policy and Scope of Work: Interim Measures (KDHE 1996). The hydrogeologic, geochemical, and contaminant distribution characteristics of the Centralia site, as identified by the CCC/USDA, factored into the development of the nonemergency IM proposal. These characteristics were summarized in the Interim Measure Conceptual Design (Argonne 2007a) and were discussed in detail in previous Argonne reports (Argonne 2002a, 2003, 2004, 2005a,b,c, 2006a,b, 2007b). The identified remedial goals of the proposed IM were as follows: (1) To reduce the existing concentrations of carbon tetrachloride in groundwater in three 'hot spot' areas identified at the site (at SB01, SB05, and SB12-MW02; Figure 1.2) to levels acceptable to the KDHE. (2) To reduce carbon tetrachloride concentrations in the soils near the location of former soil boring SB12 and existing monitoring well MW02 (Figure 1.2) to levels below the KDHE Tier 2 Risk-Based Screening Level (RBSL) of 200 {micro}g/kg for this contaminant. To address these goals, the potential application of an in situ chemical reduction (ISCR) treatment technology, employing the use of the EHC{reg_sign} treatment materials marketed by Adventus Americas, Inc. (Freeport, Illinois), was recommended. The EHC materials are proprietary mixtures of food-grade organic carbon and zero-valent iron that are injected into the subsurface as a slurry (EHC) or in dissolved form (EHC-A) and subsequently released slowly into the formation. The materials are designed to create highly reducing geochemical conditions in the vadose and saturated zones that foster both thermodynamic and biological reductive dechlorination of carbon tetrachloride.
Outstanding research potential of electron-hadron colliders (EHC) was clearly demonstrated by first - and the only - electron-proton collider HERA (DESY, Germany). Physics data from HERA revealed new previously unknown facets of Quantum Chromo-Dynamics (QCD). EHC is an ultimate microscope probing QCD in its natural environment, i.e. inside the hadrons. In contrast with hadrons, electrons are elementary particles with known initial state. Hence, scattering electrons from hadrons provides a clearest pass to their secrets. It turns EHC into an ultimate machine for high precision QCD studies and opens access to rich physics with a great discovery potential: solving proton spin puzzle, observing gluon saturation or physics beyond standard model. Access to this physics requires high-energy high-luminosity EHCs and a wide reach in the center-of-mass (CM) energies. This paper gives a brief overview of four proposed electron-hadron colliders: ENC at GSI (Darmstadt, Germany), ELIC/MEIC at TJNAF (Newport News, VA, USA), eRHIC at BNL (Upton, NY, USA) and LHeC at CERN (Geneva, Switzerland). Future electron-hadron colliders promise to deliver very rich physics not only in the quantity but also in the precision. They are aiming at very high luminosity two-to-four orders of magnitude beyond the luminosity demonstrated by the very successful HERA. While ENC and LHeC are on opposite side of the energy spectrum, eRHIC and ELIC are competing for becoming an electron-ion collider (EIC) in the U.S. Administrations of BNL and Jlab, in concert with US DoE office of Nuclear Physics, work on the strategy for down-selecting between eRHIC and ELIC. The ENC, EIC and LHeC QCD physics programs to a large degree are complimentary to each other and to the LHC physics. In last decade, an Electron Ion Collider (EIC) collaboration held about 25 collaboration meetings to develop physics program for EIC with CM energy {approx}100 GeV. One of these meetings was held at GSI, where ENC topic was in the center of discussions. First dedicated LHeC workshop was held in 2008, with a number of dedicated workshops following it. Intense accelerator R&D program is needed to address the challenges posed by the EIC.
The contributions due to the point defects or disorder and anharmonicities which play deterministic role in the understanding of electronic heat capacity (EHC) of high temperature superconductors (HTS) have been investigated via electron density of states (EDOS) approach on the basis of quantum dynamical many body theory. The evaluation of EDOS has been carried out with the help of most versatile method of double time temperature dependent electron Green’s functions (GF) via a Hamiltonian (non BCS type) which includes the effects of electrons, phonons, defects, anharmonicity, and electron-phonon interactions which enables to account the effects of cubic anharmonicity besides with both the force constant changes and mass difference caused by the impurities in developing the results for EDOS and EHC. The new results reveal some striking features of EHC of HTS.
The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) is conducting an environmental investigation at the former CCC/USDA grain storage facility on the county fairgrounds in Montgomery City, Missouri, to evaluate contamination associated with the former use of grain fumigants containing carbon tetrachloride at the site. The CCC/USDA studies have identified carbon tetrachloride in the soils (primarily unconsolidated glacial tills) at concentrations that exceed the U.S. Environmental Protection Agency (EPA) regional screening level (RSL) values for this compound in residential soils (610 μg/kg) but are below the corresponding RSL for industrial soils (3,000 μg/kg). Concentrations of carbon tetrachloride greater than the EPA maximum contaminant level (MCL; 5.0 μg/L) for this contaminant in drinking water were also identified in the shallow groundwater (Argonne 2012). On the basis of these findings, remedial actions are considered necessary to mitigate the present and potential future impacts of the contamination. In cooperation with the Missouri Department of Natural Resources (MDNR), the CCC/USDA has initiated a field-scale pilot test to evaluate an in situ technology for treatment of the carbon tetrachloride contamination. In this approach, a chemical amendment consisting primarily of slow-release organic matter and zero-valent iron is employed to induce oxygen-depleted, chemically reducing conditions in the subsurface. These conditions foster the in situ chemical reduction (ISCR) of carbon tetrachloride and its degradation products (chloroform, methylene chloride, and chloromethane) via both inorganic and biologically mediated processes. The chemical amendment being used, EHC™, was developed by the Adventus Group, Freeport, Illinois, and is now manufactured and distributed by FMC Environmental Solutions, Philadelphia, Pennsylvania. With the approval of the MDNR (2012), the ISCR technology is being tested in two target areas interpreted to represent contaminant source areas. The pilot test is being implemented on behalf of the CCC/USDA by Argonne National Laboratory. Approximately 80,000 lb of the EHC material was injected by using direct-push techniques at 99 locations in the target areas, from November 9 to December 15, 2012 (Argonne 2012). To determine the geochemical effects of the pilot injections and their impact on the levels of contamination in the test areas, an extended monitoring program (Argonne 2012) is being implemented. The program includes an initial “baseline” sampling event to document pre-treatment conditions and periodic post-injection monitoring events, approximately 1, 2, 4, 6, 9, and 12 months after the completion of the injection program (Argonne 2012). This report provides a brief summary of the specific activities conducted, with a compilation of the monitoring data obtained, during the baseline sampling event (October 2012) and the first, second, and third post-injection monitoring events (in January, February, and April 2013).
HyET Hydrogen, a Dutch developer of hydrogen compression and purification equipment, and the National Renewable Energy Laboratory (NREL) are collaborating to develop membrane electrode assembly (MEA) manufacturing automation technology for electrochemical hydrogen compression (EHC). EHC has the potential to outcompete mechanical compression for hydrogen end-use applications.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.
Global conversion to sustainable energy is likely to result in a hydrogen-based economy that supports U.S. energy security objectives while simultaneously avoiding harmful carbon emissions. A key hurdle to successful implementation of a hydrogen economy is the low-cost generation, storage, and distribution of hydrogen. One of the most difficult requirements of this transformation is achieving economical, high density hydrogen storage in passenger vehicles. Transportation applications may require compression and storage of high purity hydrogen up to 12,000 psi. Hydrogen production choices range from centralized low-pressure generation of relatively impure gas in large quantities from steam-methane reformer plants to distributed generation of hydrogen under moderate pressure using water electrolysis. The Electrochemical Hydrogen Separator + Compressor (EHS+C) technology separates hydrogen from impurities and then compresses it to high pressure without any moving parts. The Phase I effort resulted in the construction and demonstration of a laboratory-scale hardware that can separate and compress hydrogen from reformate streams. The completion of Phase I has demonstrated at the laboratory scale the efficient separation and compression of hydrogen in a cost effective manner. This was achieved by optimizing the design of the Electrochemical Hydrogen Compression (EHC) cell hardware and verified by parametric testing in single cell hardware. A broad range of commercial applications exist for reclamation of hydrogen. One use this technology would be in combination with commercial fuel cells resulting in a source of clean power, heat, and compressed hydrogen. Other applications include the reclamation of hydrogen from power plants and other industrial equipment where it is used for cooling, recovery of process hydrogen from heat treating processes, and semiconductor fabrication lines. Hydrogen can also be recovered from reformate streams and cryogenic boil-offs using this technology.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) requested that sitewide monitoring continue until a final remedy is selected (as part of a Corrective Action Study [CAS] evaluation) and implemented. In response to this request, the established sampling across the site and additional sampling in the IM pilot test area continued in 2008 (Argonne 2008b, 2009a,b). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program for both the wider site and the IM pilot test area (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve monitoring points across the site (Figure 1.1) and five outlying IM pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.2); and (2) Twice yearly sampling of five IM pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.2). With the approval of the KDHE (2009), the initial groundwater sampling for VOCs and geochemical analyses under the interim monitoring plan outlined above was conducted in 2009 (Argonne 2010). The present report documents the findings of the 2010 monitoring events, conducted on April 5 and September 19-21, 2010.
Periodic sampling is performed at Centralia, Kansas, on behalf of the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) by Argonne National Laboratory, in accord with the current interim monitoring program approved by the Kansas Department of Health and Environment (KDHE 2009). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater sitewide (Argonne 2003, 2004, 2005a), as well as the response to the interim measure (IM) pilot test that is in progress (Argonne 2007b). An earlier monitoring plan (Argonne 2005b) was also approved by the KDHE (2005). Under this earlier plan, the groundwater was sampled twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 µg/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. After two years of monitoring under the earlier plan, the CCC/USDA developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed IM was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a).
Electrochemical compression and purification is a high potential technology that is likely to outcompete mechanical compression for hydrogen end use applications. However, testing and understanding what is occurring within the cell is difficult as it is not readily accessible through experimentation. Thus, the main target is to increase performance and reduce cost of electrochemical hydrogen compression (EHC) and purification (EHP) cells and stacks using multiscale mathematical modeling informed by experiment. The models can provide physical insight into limiting processes and develop mitigation methods, which can be proven out through rapid sub-scale testing of the devices.
U.S. automakers have invested significant resources in the research and development of hydrogen fuel cell electric vehicles (FCEVs). However, to enable the widespread deployment of FCEVs, an additional major investment is required to achieve an infrastructure for compressing hydrogen in hydrogen fueling stations. In order to dispense hydrogen to FCEV tanks quickly, the hydrogen must be compressed above a pressure of 875 bar (12,687 psi) at the fueling station. Mechanical compressors currently in use have high maintenance costs, poor reliability, and are noisy. To eliminate the need for mechanical compressors, Plug Power is extending its extensive experience in high-pressure proton-exchange-membrane (PEM), to develop an electrochemical hydrogen compressor (EHC) system for refueling applications that can deliver hydrogen at pressures greater than 875 bar. The work performed during this project was a collaboration between the Nation Renewable Energy Laboratory (NREL), Rensselaer Polytechnic Institute (RPI), and Gaia Energy Research Institute LLC (GAIA).
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under a KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly (for a recommended period of two years) for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling in September 2007 represented the fifth and final monitoring event performed under the two-year twice yearly monitoring program (Argonne 2006a,b, 2007a, 2008a). The results from the two-year monitoring program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 Risk-Based Screening Level of 5 {micro}g/L for this compound in a broad groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC in situ chemical reduction technology, that was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the proposed interim measure occurred in December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009). The KDHE has requested that sitewide monitoring continue at Centralia until a final remedy has been implemented and a comprehensive program of performance and compliance monitoring has been established for this site (KDHE 2008a). The groundwater sampling events at Centralia in March 2008 (Argonne 2008b) and September 2008 were performed in response to this request. The present report documents the results of groundwater sampling conducted in September 2008, in the network of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for extended monitoring of the groundwater contamination at Centralia (KDHE 2005a,b). Sampling of additional piezometers specifically installed to monitor the progress of the interim measure pilot test (PMP1-PMP9; Figure 1.2) was also performed in September 2008; the results of these analyses are reported and discussed separately (Argonne 2009).