Strategy Guideline: Compact Air Distribution Systems

This Strategy Guideline discusses the benefits and challenges of using a compact air distribution system to handle the reduced loads and reduced air volume needed to condition the space within an energy efficient home. Traditional systems sized by 'rule of thumb' (i.e., 1 ton of cooling per 400 ft 2 of floor space) that 'wash' the exterior walls with conditioned air from floor registers cannot provide appropriate air mixing and moisture removal in low-load homes. A compact air distribution system locates the HVAC equipment centrally with shorter ducts run to interior walls, and ceiling supply outlets throw the air toward the exterior walls along the ceiling plane; alternatively, high sidewall supply outlets throw the air toward the exterior walls. Potential drawbacks include resistance from installing contractors or code officials who are unfamiliar with compact air distribution systems, as well as a lack of availability of low-cost high sidewall or ceiling supply outlets to meet the low air volumes with good throw characteristics. The decision criteria for a compact air distribution system must be determined early in the whole-house design process, considering both supply and return air design. However, careful installation of a compact air distribution system can result in lower material costs from smaller equipment, shorter duct runs, and fewer outlets; increased installation efficiencies, including ease of fitting the system into conditioned space; lower loads on a better balanced HVAC system, and overall improved energy efficiency of the home.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Strategy Guideline: Compact Air Distribution Systems

This guideline discusses the benefits and challenges of using a compact air distribution system to handle the reduced loads and reduced air volume needed to condition the space within an energy efficient home. The decision criteria for a compact air distribution system must be determined early in the whole-house design process, considering both supply and return air design. However, careful installation of a compact air distribution system can result in lower material costs from smaller equipment, shorter duct runs, and fewer outlets; increased installation efficiencies, including ease of fitting the system into conditioned space; lower loads on a better balanced HVAC system, and overall improved energy efficiency of the home.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Strategy Guideline: Air Distribution Basics and Duct Design

This report discusses considerations for designing an air distribution system for an energy efficient house that requires less air volume to condition the space. Considering the HVAC system early in the design process will allow adequate space for equipment and ductwork and can result in cost savings. Principles discussed that will maximize occupant comfort include delivery of the proper amountof conditioned air for appropriate temperature mixing and uniformity without drafts, minimization of system noise, the impacts of pressure loss, efficient return air duct design, and supply air outlet placement, as well as duct layout, materials, and sizing.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

Performance Analysis of a Modular Small-Diamter Air Distribution System

This report investigates the feasibility of using a home-run manifold small-diameter duct system to provide space conditioning air to individual thermal zones in a low-load home. This compact layout allows duct systems to be brought easily within conditioned space via interior partition walls. Centrally locating the air handler unit in the house significantly reduces duct lengths. The plenum box is designed so that each connected duct receives an equal amount of airflow, regardless of the duct position on the box. Furthermore, within a reasonable set of length restrictions, each duct continues to receive similar airflow. The design method uses an additive approach to reach the total needed zonal airflow. Once the cubic feet per minute needed to satisfy the thermal load of a zone has been determined, the total number of duct runs to a zone can be calculated by dividing the required airflow by the standard airflow from each duct. The additive approach greatly simplifies the design effort and reduces the potential for duct design mistakes to be made. Measured results indicate that this plenum design can satisfy the heating load. However, the total airflow falls short of satisfying the cooling load in a hypothetical building. Static pressure inside the plenum box of 51.5 Pa limited the total airflow of the attached mini-split heat pump blower, thus limiting the total thermal capacity. Fan energy consumption is kept to 0.16 to 0.22 watt/CFM by using short duct runs and smooth duct material.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Analysis of a Modular Small-Diameter Air Distribution System

This report investigates the feasibility of using a home-run manifold small-diameter duct system to provide space-conditioning air to individual thermal zones in a low-load home. This compact layout allows duct systems to easily be brought within conditioned space via interior partition walls. Centrally locating the air handling unit in the house significantly reduces duct lengths. The plenum box is designed so that each connected duct receives a similar amount of airflow—regardless of its position on the box. Furthermore, within a reasonable set of length restrictions each duct continues to receive similar airflow.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Mockup Small-Diameter Air Distribution System

This report investigates the feasibility of using a home-run manifold small-diameter duct system to provide space conditioning air to individual thermal zones in a low-load home. This compact layout allows duct systems to be brought easily within conditioned space via interior partition walls. Centrally locating the air hander unit in the house significantly reduces duct lengths. The plenum box is designed so that each connected duct receives an equal amount of airflow, regardless of the duct position on the box. Furthermore, within a reasonable set of length restrictions, each duct continues to receive similar airflow. The design method uses an additive approach to reach the total needed zonal airflow. Once the cubic feet per minute needed to satisfy the thermal load of a zone has been determined, the total number of duct runs to a zone can be calculated by dividing the required airflow by the standard airflow from each duct. The additive approach greatly simplifies the design effort and reduces the potential for duct design mistakes to be made. Measured results indicate that this plenum design can satisfy the heating load. However, the total airflow falls short of satisfying the cooling load in a hypothetical building. Static pressure inside the plenum box of 51.5 Pa limited the total airflow of the attached mini-split heat pump blower, thus limiting the total thermal capacity. Fan energy consumption is kept to 0.16 to 0.22 watt/CFM by using short duct runs and smooth duct material.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mockup Small-Diameter Air Distribution System

This report investigates the feasibility of using a home-run manifold small-diameter duct system to provide space conditioning air to individual thermal zones in a low-load home. This compact layout allows duct systems to be brought easily within conditioned space via interior partition walls. Centrally locating the air hander unit in the house significantly reduces duct lengths. The plenum box is designed so that each connected duct receives an equal amount of airflow, regardless of the duct position on the box. Furthermore, within a reasonable set of length restrictions, each duct continues to receive similar airflow. The design method uses an additive approach to reach the total needed zonal airflow. Once the cubic feet per minute needed to satisfy the thermal load of a zone has been determined, the total number of duct runs to a zone can be calculated by dividing the required airflow by the standard airflow from each duct. The additive approach greatly simplifies the design effort and reduces the potential for duct design mistakes to be made. Measured results indicate that this plenum design can satisfy the heating load. However, the total airflow falls short of satisfying the cooling load in a hypothetical building. Static pressure inside the plenum box of 51.5 Pa limited the total airflow of the attached mini-split heat pump blower, thus limiting the total thermal capacity. Fan energy consumption is kept to 0.16 to 0.22 watt/CFM by using short duct runs and smooth duct material.

air distribution↗

Advanced Control and Protection system Design Methods for Modular HTGRs

The project supported the Nuclear Regulatory Commission (NRC) in identifying and evaluating the regulatory implications concerning the control and protection systems proposed for use in the Department of Energy's (DOE) Next-Generation Nuclear Plant (NGNP). The NGNP, using modular high-temperature gas-cooled reactor (HTGR) technology, is to provide commercial industries with electricity and high-temperature process heat for industrial processes such as hydrogen production. Process heat temperatures range from 700 to 950 C, and for the upper range of these operation temperatures, the modular HTGR is sometimes referred to as the Very High Temperature Reactor or VHTR. Initial NGNP designs are for operation in the lower temperature range. The defining safety characteristic of the modular HTGR is that its primary defense against serious accidents is to be achieved through its inherent properties of the fuel and core. Because of its strong negative temperature coefficient of reactivity and the capability of the fuel to withstand high temperatures, fast-acting active safety systems or prompt operator actions should not be required to prevent significant fuel failure and fission product release. The plant is designed such that its inherent features should provide adequate protection despite operational errors or equipment failure. Figure 1 shows an example modular HTGR layout (prismatic core version), where its inlet coolant enters the reactor vessel at the bottom, traversing up the sides to the top plenum, down-flow through an annular core, and exiting from the lower plenum (hot duct). This research provided NRC staff with (a) insights and knowledge about the control and protection systems for the NGNP and VHTR, (b) information on the technologies/approaches under consideration for use in the reactor and process heat applications, (c) guidelines for the design of highly integrated control rooms, (d) consideration for modeling of control and protection system designs for VHTR, and (e) input for developing the bases for possible new regulatory guidance to assist in the review of an NGNP license application. This NRC project also evaluated reactor and process heat application plant simulation models employed in the protection and control system designs for various plant operational modes and accidents, including providing information about the models themselves, and the appropriateness of the application of the models for control and protection system studies. A companion project for the NRC focused on the potential for new instrumentation that would be unique to modular HTGRs, as compared to light-water reactors (LWRs), due to both the higher temperature ranges and the inherent safety features.

08 HYDROGEN↗

Room Return Path Sensitivity

Standard practice for HVAC return design has evolved from running a dedicated return to each room with a supply, to systems with returns in more centrally located areas of the home with jump ducts, transfer grilles, or simply door undercuts used as return air pathways from isolated rooms. In these latter systems, hallways and stairwells act as large open ducts for conveying air back to a single (or sometimes multiple) central return. When partition doors to an isolated room are closed, the return airflow resistance goes up, significantly impacting airflow balance if an adequate relief pathway is not installed. Airflow imbalances can lead to comfort and building durability issues and increased envelope leakage. To combat this, some jurisdictions have requirements for return air pathways. The supply system topology–or layout–impacts the airflow balance stability in response to adjustments of return pathway resistances. Branching supply topologies typically have reduced static pressure after each split. The static pressure at the final split will be lower than the primary supply plenum. Because of this, if there is a restriction in a room’s return path, supply airflow will tend to redistribute to adjacent ducts at the end of the branch. A properly designed trunk and branch supply system can effectively equalize static pressure by reducing the cross sectional area after each takeoff . Maintaining static pressure within the trunk will reduce the system’s sensitivity to changes in return paths. However, in practice, it is difficult to design and time consuming to install a complex supply plenum. Velocity effects and poor takeoff placement also impact airflow balance. This report considers return systems in three main categories: distributed, with a return duct to each room; multiple central, with one return grille on each floor of a home; and single central, with a single return grille located near the air handling unit. Three supply categories are also considered: radial splitter box, trunk and branch, and home-run with all ducts connecting directly to a central manifold.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Designing for Supply and Return Air System Interaction in Residential Buildings

Standard practice for HVAC return design has evolved from running a dedicated return to each room with a supply, to systems with returns in more centrally located areas of the home with jump ducts, transfer grilles, or simply door undercuts used as return air pathways from isolated rooms . In these latter systems, hallways and stairwells act as large open ducts for conveying air back to a single (or sometimes multiple) central return. When partition doors to an isolated room are closed, the return airflow resistance goes up, significantly impacting airflow balance if an adequate relief pathway is not installed. Airflow imbalances can lead to comfort and building durability issues and increased envelope leakage. To combat this, some jurisdictions have requirements for return air pathways. The supply system topology – or layout - impacts the airflow balance stability in response to adjustments of return pathway resistances. Branching supply topologies typically have reduced static pressure after each split. The static pressure at the final split will be lower than the primary supply plenum. Because of this, if there is a restriction in a room’s return path, supply airflow will tend to redistribute to adjacent ducts at the end of the branch. A properly designed trunk and branch supply system can effectively equalize static pressure by reducing the cross sectional area after each takeoff . Maintaining static pressure within the trunk will reduce the system’s sensitivity to changes in return paths. However, in practice, it is difficult to design and time consuming to install a complex supply plenum. Velocity effects and poor takeoff placement also impact airflow balance. This fact sheet considers return systems in three main categories: distributed, with a return duct to each room; multiple central, with one return grille on each floor of a home; and single central, with a single return grille located near the air handling unit. Three supply categories are also considered: radial splitter box, trunk and branch, and home-run with all ducts connecting directly to a central manifold. A complete description of the modeling work and results can be found in the companion technical report.

buildings↗

Initial Core Physics and Safety Analyses Supporting the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a proposed integrated facility for investigations into the behavior of fuels and materials subjected to high, fast neutron fluxes prototypical of fast reactor environments. Detailed design of the reactor is currently being performed by a group of U.S. National Laboratories, including Argonne National Laboratory. The current design of the reactor is a 300 MW sodium-cooled pool-type fast reactor fueled with ternary U-20Pu-10Zr metallic fuel. This report documents reactor core physics and preliminary safety analyses that have been performed. The reference VTR core has 313 assembly positions, 66 of which contain fuel assemblies. The remaining assembly positions are loaded with reflector, shield, control rod duct, and test assemblies. Ten positions are available in the reference design for experimental or test assemblies, however the VTR will support test assemblies in any position in the core for alternate core loadings. The performance of the reference VTR core has been assessed for an assumed equilibrium cycle. The core power distribution and reactivity feedback coefficients have been calculated. Preliminary assessments of the reactivity coefficients have shown that each of them results in a negative reactivity change for increasing temperatures. Safety analysis of a VTR layout has been performed using the SAS4A/SASSYS-1 fast reactor safety analysis code. A model has been developed to represent the current core design and a reference heat transport system design. The model has been used to simulate and perform analysis of protected and unprotected loss of heat sink, station blackout, and transient overpower accident scenarios. These scenarios represent the three main ways to perturb the reactor core, through changes to the core inlet temperature, mass flow rate, or reactivity insertions and are credible bounding scenarios for the evaluated transient categories. The results of these simulations have been assessed against simplified criteria for Anticipated Operational Occurrences for the protected transients and for Beyond Design Basis Events for the unprotected transients. Because the primary heat transport system is able to transition quickly and effectively to natural circulation and because the shutdown heat removal system provides sufficient heat rejection capability, large margins for all criteria were predicted for all protected transients. Large margins were also predicted for the unprotected loss of heat sink and station blackout transients due to the strong negative reactivity feedbacks generated by the core. Because of the high power density in the reactor, smaller fuel melting margins are predicted for the unprotected transient overpower accident.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Benchmark Exercise for the Control Rod Swelling Evaluation

The VTR core has six reactivity control assemblies and three safety assemblies. The control assemblies or primary control rods are adjusted during the normal operation to balance the core reactivity and to control the reactor power. A typical control assembly radial layout is presented in Figure 1. The figure shows the swelled absorber (B 4 C) rod. Initially, helium gas fills the gap between the pin and the cladding before irradiation swelling takes place. For VTR, HT9 steel was selected as the cladding and duct material. The main neutron absorbing material used in the VTR is B 4 C. When residing in the core, the neutronics, thermophysical, and mechanical properties of the materials used in a control assembly will degrade due to accumulated neutron damage. Material degradation limits how long a control assembly can reside in the core. Many phenomena affect the control assembly lifetime, such as the loss of reactivity worth due to B 4 C depletion, the mechanical interaction of the absorber rod and the cladding due to B 4 C swelling, the helium gas buildup in the pin due to B-10 capture, etc. B 4 C swelling, which causes closure of the gap between the absorber rod and the cladding, is usually considered as the main limiting factor from past experience. An initial study was conducted at PNNL to evaluate the irradiation behavior of a VTR control assembly. The evaluation was performed using the CNRD2 code that was initially developed for the FFTF. The study also included an assessment of the VTR control assembly and focused on a 61-pin control assembly design, which is different from that used (37-pin design) in the core design study. The study conducted by PNNL was reviewed independently by ANL. A Python script referred to as the Control Assembly Evaluation Script (CAES) was developed for the independent review and additional assessment of 37-pin control assembly design. The script has focused on the assessment of the absorber rod swelling for its importance in determining the control assembly lifetime. CAES uses geometry, neutronics, materials data as input to predict the swelling of the absorber rod during its residence in the reactor core. The results from CAES showed some non-negligible differences against the PNNL results. Some of the differences can be attributed to the different interpretation of the control rod assembly dimensions. To resolve this issue, a benchmark exercise was proposed. The benchmark specification was developed by PNNL. The benchmark exercise was performed independently at PNNL and ANL using different codes/scripts (CRND2 and CAES). This memo documents the results calculated using the different codes. However, this report is limited to presenting the results obtained. Further investigation of the cause of the observed difference will be performed as part of future activities, pending continuation of the VTR program.