Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

National Rotor Testbed Requirements. Draft

This document serves both as a guide and a record for requirements management associated with design of retrofit rotors for the Sandia SWiFT turbines. The rotors will support a long-term experimental campaign. Data gathered during the campaign will support formal verification and validation of complex flow numerical models for prediction of metrics deemed important for wind energy plant efficiency. These integrated projects involve multiple years of effort, dozens of engineers and collaborators, and dozens of stakeholders in the form of the research community, National Lab staff, and DOE staff. Creating of formal, written requirements will ensure flow-down of activities from high-level goals, aid communication, and enable clear verification of activities. A custom requirements schema is created and described. Commercial requirements management software —IBM Rational DOORS—is used to organize the information and ensure traceability. This document serves as a record of the process as well as a record of the exported, detailed contents of the DOORS database.

17 WIND ENERGY↗

Experiment Liaison Duties

The continuous electron beam accelerator facility (CEBAF) at Jefferson Lab (JLAB) hosts unique and specialized experiments simultaneous with routine experiments in other end-stations. These unique experiments often have specialized beam requirements, new beamline configurations including diagnostic devices, and well defined commissioning periods. Each experiment's needs are different, so the Jefferson Lab Operations Group assigns an Experiment Liaison, a single crew chief or operator who works directly with experiment representatives during planning, commissioning and installation. This poster shows how the Experiment Liaison plays a key role in planning the beam instrumentation requirements, drafting experiment-specific setup procedures, and training Operations staff before the first beam is ever delivered to the experiment.

Aiken, Michael↗

Draft Geologic Disposal Requirements Basis for STAD Specification

This document provides supporting technical rationale in draft form as input for: STAD Performance Specification Requirements Rationale (planned to be issued as FCRD-NFST-2015- 000106). The supporting rationale addresses those parts of the storage, transportation and disposal (STAD) canister performance specification that pertain to geologic disposal. These parts include service lifetime, repository thermal performance, postclosure criticality, and materials selection. Each draft performance specification is presented, and those pertaining to geologic disposal are elaborated with brief sections labeled Rationale. More detail is provided in appendices that address: long-term performance of borated stainless steel, use of borated stainless steel in existing designs, recommendations for additional corrosion studies, stress corrosion cracking of canister shell materials, and a generic postclosure safety case for STAD canisters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Draft Geologic Disposal Requirements Basis for STAD Specification

This document provides the basis for requirements in the current version of Performance Specification for Standardized Transportation, Aging, and Disposal Canister Systems, (FCRD-NFST-2014-0000579) that are driven by storage and geologic disposal considerations. Performance requirements for the Standardized Transportation, Aging, and Disposal (STAD) canister are given in Section 3.1 of that report. Here, the requirements are reviewed and the rationale for each provided. Note that, while FCRD-NFST-2014-0000579 provides performance specifications for other components of the STAD storage system (e.g. storage overpack, transfer and transportation casks, and others), these have no impact on the canister performance during disposal, and are not discussed here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Precision Local Positioning System

The primary goal of the project is to lay the groundwork for a new system design, meaning that at the end of this project’s effort, a traditional LLNL project could begin. For this goal to be met, the overarching needs of potential sponsors and stakeholders must be analyzed and understood, and a clear statement of work should be able to be drafted from the finding in this report. More specifically, the results from this project should immediately feed into the drafting of requirements, an implementation plan, and a budget plan for a future project. In order to accomplish this goal, the team set a broad framework for work to be completed. First, conduct current market research and select reference technologies to decompose. From the decompositions, analyze shortcomings, possible pain-points and form metrics and architectural decisions. Next, analyze the potential market area by interviewing/researching stakeholders and understanding their needs. As an additional project goal, attempt to capture as large a market area and scope as reasonably possible by incorporating more than the traditional LLNL sponsors. From the information gathered, study stakeholder salience and understand the relationships between stakeholders, mission areas, mission critical functions, and system metrics. Further analyze the relationships to focus on critical system aspects and to group stakeholders and mission together in order to reduce system complexity while maintaining wide marketability. Finally, begin brainstorming concepts from the established architectural decision and use the found metrics to create tradespaces to down select the most viable architectures. This document presents the team’s findings as it progressed through the project’s strategy.

42 ENGINEERING↗

Development of an Interactive Valuation Model for Distributed Energy Resource Value

The Oklahoma Secretary of Commerce & Tourism (OSCT) seeks to address perceived challenges and barriers to the deployment of distributed energy generation resources (DERs), including solar and other technologies, in the state of Oklahoma. The Scope of Work (SOW) outlines follow-on tasks related to the previous CRADA # CRD-18-762. The first task will finalize the Interactive Valuation Model Requirements Document, the final draft of which was provided in June 2018. The second task includes the building, validation, and finalization of the interactive valuation model for expressing distributed energy resource value based on user inputs to be completed by June 30, 2019. Training for how to prepare the data inputs and use the model will also be provided. To address perceived challenges and barriers to the deployment of distributed energy generation resources (DERs), including solar and other technologies, in the state of Oklahoma, the work under this CRADA will: 1) finalize the draft Interactive Valuation Model Requirements Document delivered in June 2018; 2) finish building and validating the interactive valuation model for expressing DER value based on user inputs, and 3) provide training for use of this model.

14 SOLAR ENERGY↗

Modeling approach for very high efficiency dedicated outdoor air systems in new construction and major renovation

Based on a draft program requirement for very high efficiency dedicated outdoor air systems (VHE DOAS) provided by NEEA, a more detailed report (Hart, Lerond, Goel, & Rosenberg, 2020) proposed sequences of operation and modeling strategies for such equipment. Simulations were carried out to estimate savings potential of these sequences of operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Updated Waste Management System Analysis Tool Requirements and Enhancements

Draft presentation for presentation to Nuclear Waste Technical Review Board Winter/Spring Meeting March 2nd NOTE: FYI this presentation is almost the same as the presentation that will be uploaded soon entitled 'Next Generation System Analysis Model: Recently Added Features and Future Plans' for the Waste Management 2022 conference.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASCR/HEP Exascale Requirements Review Report

This draft report summarizes and details the findings, results, and recommendations derived from the ASCR/HEP Exascale Requirements Review meeting held in June, 2015. The main conclusions are as follows. 1) Larger, more capable computing and data facilities are needed to support HEP science goals in all three frontiers: Energy, Intensity, and Cosmic. The expected scale of the demand at the 2025 timescale is at least two orders of magnitude -- and in some cases greater -- than that available currently. 2) The growth rate of data produced by simulations is overwhelming the current ability, of both facilities and researchers, to store and analyze it. Additional resources and new techniques for data analysis are urgently needed. 3) Data rates and volumes from HEP experimental facilities are also straining the ability to store and analyze large and complex data volumes. Appropriately configured leadership-class facilities can play a transformational role in enabling scientific discovery from these datasets. 4) A close integration of HPC simulation and data analysis will aid greatly in interpreting results from HEP experiments. Such an integration will minimize data movement and facilitate interdependent workflows. 5) Long-range planning between HEP and ASCR will be required to meet HEP's research needs. To best use ASCR HPC resources the experimental HEP program needs a) an established long-term plan for access to ASCR computational and data resources, b) an ability to map workflows onto HPC resources, c) the ability for ASCR facilities to accommodate workflows run by collaborations that can have thousands of individual members, d) to transition codes to the next-generation HPC platforms that will be available at ASCR facilities, e) to build up and train a workforce capable of developing and using simulations and analysis to support HEP scientific research on next-generation systems.

97 MATHEMATICS AND COMPUTING↗

ASCR/HEP Exascale Requirements Review Report

This draft report summarizes and details the findings, results, and recommendations derived from the ASCR/HEP Exascale Requirements Review meeting held in June, 2015. The main conclusions are as follows. 1) Larger, more capable computing and data facilities are needed to support HEP science goals in all three frontiers: Energy, Intensity, and Cosmic. The expected scale of the demand at the 2025 timescale is at least two orders of magnitude -- and in some cases greater -- than that available currently. 2) The growth rate of data produced by simulations is overwhelming the current ability, of both facilities and researchers, to store and analyze it. Additional resources and new techniques for data analysis are urgently needed. 3) Data rates and volumes from HEP experimental facilities are also straining the ability to store and analyze large and complex data volumes. Appropriately configured leadership-class facilities can play a transformational role in enabling scientific discovery from these datasets. 4) A close integration of HPC simulation and data analysis will aid greatly in interpreting results from HEP experiments. Such an integration will minimize data movement and facilitate interdependent workflows. 5) Long-range planning between HEP and ASCR will be required to meet HEP's research needs. To best use ASCR HPC resources the experimental HEP program needs a) an established long-term plan for access to ASCR computational and data resources, b) an ability to map workflows onto HPC resources, c) the ability for ASCR facilities to accommodate workflows run by collaborations that can have thousands of individual members, d) to transition codes to the next-generation HPC platforms that will be available at ASCR facilities, e) to build up and train a workforce capable of developing and using simulations and analysis to support HEP scientific research on next-generation systems.

Habib, Salman↗

Advanced Grid Support Functionality Testing for Florida Power and Light

This report describes the results of laboratory testing of advanced photovoltaic (PV) inverter testing undertaken by the National Renewable Energy Laboratory (NREL) on behalf of the Florida Power and Light Company (FPL). FPL recently commissioned a 1.1 MW-AC PV installation on a solar carport at the Daytona International Speedway in Daytona Beach, Florida. In addition to providing a source of clean energy production, the site serves as a live test bed with 36 different PV inverters from eight different manufacturers. Each inverter type has varied support for advanced grid support functions (GSFs) that are becoming increasingly commonplace, and are being required through revised interconnection standards such as UL1741, IEEE1547, and California (CA) Rule 21. FPL is interested in evaluating the trade-offs between different GSFs, their compliance to emerging standards, and their effects on efficiency and reliability. NREL has provided a controlled laboratory environment to undertake such a study. This work covered nine different classes of tests to compare inverter capabilities and performance for four different inverters that were selected by FPL. The test inverters were all three-phase models rated between 24-36 kW, and containing multiple PV input power point trackers. Advanced grid support functions were tested for functional behavior, and included fixed power factor operation, voltage-ride through, frequency ride-through, volt-var control, and frequency-Watt control. Response to abnormal grid conditions with GSFs enabled was studied through anti-islanding, fault, and load rejection overvoltage tests. Finally, efficiency was evaluated across a range of operating conditions that included power factor, output power, and input voltage variations. Test procedures were derived from requirements of a draft revision of UL741, CA Rule 21, and/or previous studies at NREL. This reports summarizes the results of each test case, providing a comparative performance analysis between the four test inverters. Inverters were mostly able to meet the requirements of their stated GSF capabilities, with deviations from expected results discussed throughout the report. There were mixed results across the range of abnormal tests, and results were often dependent on the capability of each test inverter to deploy the GSFs of interest. Detailed test data has been provided to FPL to support future decision making with respect to inverter selection and GSF deployment in the field.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Radioactive Waste Management in Central Asia - 12034

After the collapse of the Soviet Union the newly independent states in Central Asia (CA) whose regulatory bodies were set up recently are facing problems with the proper management of radioactive waste and so called 'nuclear legacy' inherited from the past activities. During the former Soviet Union (SU) period, various aspects of nuclear energy use took place in CA republics of Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan. Activities range from peaceful use of energy to nuclear testing for example at the former Semipalatinsk Nuclear Test Site (SNTS) in Kazakhstan, and uranium mining and milling industries in all four countries. Large amounts of radioactive waste (RW) have been accumulated in Central Asia and are waiting for its safe disposal. In 2008 the Norwegian Radiation Protection Authority (NRPA), with the support of the Norwegian Ministry of Foreign Affairs, has developed bilateral projects that aim to assist the regulatory bodies in Kazakhstan, Kyrgyzstan Tajikistan, and Uzbekistan (from 2010) to identify and draft relevant regulatory requirements to ensure the protection of the personnel, population and environment during the planning and execution of remedial actions for past practices and radioactive waste management in the CA countries. The participating regulatory authorities included: Kazakhstan Atomic Energy Agency, Kyrgyzstan State Agency on Environmental Protection and Forestry, Nuclear Safety Agency of Tajikistan, and State Inspectorate on Safety in Industry and Mining of Uzbekistan. The scope of the projects is to ensure that activities related to radioactive waste management in both planned and existing exposure situations in CA will be carried out in accordance with the international guidance and recommendations, taking into account the relevant regulatory practice from other countries in this area. In order to understand the problems in the field of radioactive waste management we have analysed the existing regulations through the so called 'Threat assessment' in each CA country which revealed additional problems in the existing regulatory documents beyond those described at the start of our ongoing bilateral projects in Kazakhstan, Kirgizistan Tajikistan and Uzbekistan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dampers for Natural Draft Heaters: Technical Report

Energy required for water heating accounts for approximately 40percent of national residential natural gas consumption in California. With water heating contributing such a substantial portion of natural gas consumption, it is important to pay attention to water heater efficiencies. This paper reports on an investigation of a patented, buoyancy-operated flue damper. It is an add-on design to a standard atmospherically vented natural-draft gas-fired storage water heater. The flue damper was expected to reduce off-cycle standby losses, which would lead to improvements in the efficiency of the water heater. The test results showed that the Energy Factor of the baseline water heater was 0.576. The recovery efficiency was 0.768. The standby heat loss coefficient was 10.619 (BTU/hr-oF). After the damper was installed, the test results show an Energy Factor for the baseline water heater of 0.605. The recovery efficiency was 0.786. The standby heat loss coefficient was 9.135 (BTU/hr-oF). The recovery efficiency increased 2.3percent and the standby heat loss coefficient decreased 14percent. When the burner was on, the baseline water heater caused 28.0 CFM of air to flow from the room. During standby, the flow was 12.4 CFM. The addition of the damper reduced the flow when the burner was on to 23.5 CFM. During standby, flow with the damper was reduced to 11.1 CFM. The flue damper reduced off-cycle standby losses, and improved the efficiency of the water heater. The flue damper also improved the recovery efficiency of the water heater by restricting on-cycle air flows through the flue.With or without the flue damper, off-cycle air flow upthe stack is nearly half the air flow rate as when the burner is firing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AREVA Team Enhanced Accident Tolerant Fuels Concepts (Phase 1A Final Report)

In response to the Department of Energy (DOE) funded initiative to develop and deploy lead fuel assemblies (LFAs) of Enhanced Accident Tolerant Fuel (EATF) into a US reactor within 10 years, AREVA put together a team to develop promising technologies for improved fuel performance during off normal operations. This team consisted of the University of Florida (UF) and the University of Wisconsin (UW), Savannah River National Laboratory (SRNL), Duke Energy and Tennessee Valley Authority (TVA). This team brought broad experience and expertise to bear on EATF development. AREVA has been designing; manufacturing and testing nuclear fuel for over 50 years and is one of the 3 large international companies supplying fuel to the nuclear industry. The university and National Laboratory team members brought expertise in nuclear fuel concepts and materials development. Duke and TVA brought practical utility operating experience. This report documents the results from the initial “discovery phase” where the team explored options for EATF concepts that provide enhanced accident tolerance for both Design Basis (DB) and Beyond Design Basis Events (BDB). The main driver for the concepts under development were that they could be implemented in a 10 year time frame and be economically viable and acceptable to the nuclear fuel marketplace. The economics of fuel design make this DOE funded project very important to the nuclear industry. Even incremental changes to an existing fuel design can cost in the range of $100M to implement through to LFAs. If this money is invested evenly over 10 years then it can take the fuel vendor several decades after the start of the project to recover their initial investment and reach a breakeven point on the initial investment. Step or radical changes to a fuel assembly design can cost upwards of $500M and will take even longer for the fuel vendor to recover their investment. With the projected lifetimes of the current generation of nuclear power plants large scale investment by the fuel vendors is difficult to justify. Specific EATF enhancements considered by the AREVA team were; Improved performance in DB and BDB conditions; Reduced release to the environment in a catastrophic accident; Improved performance during normal operating conditions; Improved performance if US reactors start to load follow; Equal or improved economics of the fuel; and Improvements to the fuel behavior to support future transportation and storage of the used nuclear fuel (UNF). In pursuit of the above enhancements, EATF technology concepts that our team considered were; Additives to the fuel pellets which included; Chromia doping to increase fission gas retention. Chromia doping has the potential to improve load following characteristics, improve performance of the fuel pellet during clad failure, and potentially lock up cesium into the fuel matrix; Silicon Carbide (SiC) Fibers to improve thermal heat transfer in normal operating conditions which also improves margin in accident conditions and the potential to lock up iodine into the fuel matrix; Nano-diamond particles to enhance thermal conductivity; Coatings on the fuel cladding; and Nine coatings on the existing Zircaloy cladding to increase coping time and reduce clad oxidation and hydrogen generation during accident conditions, as well as reduce hydrogen pickup and mitigate hydride reorientation in the cladding. To facilitate the development process AREVA adopted a formal “Gate Review Process” (GR) that was used to review results and focus resources onto promising technologies to reduce costs and identify the technologies that would potentially be carried forward to LFAs within a 10 year period. During the initial discovery phase of the project AREVA took the decision to be relatively hands off and allow our university and National Laboratory partners to be free thinking and consider options that would not be constrained by preconceived ideas from the fuel vendor. To counter this and to keep the partners focused, the GR process was utilized. During this GR process each of the team members presented their findings to a board made up of technical experts from utilities, fuel manufacturing experts, fuel technical experts, and fuel research and development (R&D) experts. During the initial 2 years of the project there were several major accomplishments. These accomplishments, along with the implications for successfully implementing EATF, are; The experimental spark plasma sintering process (SPS) process was successfully used to produce fuel pellets containing either 10% SiC whiskers or nano-diamond particles. The ability to use this process enables the thermal margin enhancements of the fuel additives to be realized. Without the SPS process, the conventional process cannot support adding pellet additives in the required quantities; Coatings of Ti2AlC were successfully applied to Zircaloy-4 cladding. Testing of Ti2AlC coatings at Loss of Cooling Accident (LOCA) conditions showed reduced cladding oxidation compared to present un-coated Zircaloy-4 cladding. This achievement allows the presently used cladding system to be retained so that the 10 year schedule can be met. Having to implement a new cladding material will extend the development schedule beyond 10 years; Several documents were produced to support future development, testing, and licensing of EATF, including a design requirements traceability matrix, a draft business plan, a draft test plan, a draft regulatory plan, and the acceptance criteria for lead fuel assembly insertion into a commercial reactor. This preparatory work lays the foundation for ensuring the future development plans address all the areas required to test, license, and manufacture the new EATF; and In addition, the high velocity oxy-fuel and electrophoretic deposition (EPD) coating application processes were dropped from further consideration due to their inability to meet manufacturing criteria. This allows the resources to be focused on the most promising EATF concepts identified. Future development opportunities that were identified during this work include; The use of SiC or diamond requires that a new pellet production technique (Spark Plasma Sintering), be developed. This entails investment in developing, proving and implementing a new commercial pellet production process. Development of the process to apply thinner coatings is required; Coatings cannot be too “thick” or they will displace a significant volume of water in the core resulting in reduced thermal hydraulic characteristics; Application of the coating at high temperature can affect the Zircaloy substrate. This will require the development and implementation of a new cladding coating manufacturing process; and Replace the Cold Spray (CS) cladding coating application with the Physical Vapor Deposition (PVD) process to eliminate duplication of work and provide greater control over coating thicknesses. This can result in a reduction in the final cycle economic penalty of coatings.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Transuranic Waste Processing Center (TWPC) Legacy Tank RH-TRU Sludge Processing and Compliance Strategy - 13255

The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sites and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Validation Package September 2016 Groundwater and Surface Water Sampling at the Slick Rock, Colorado, Processing Sites January 2017

The Slick Rock, Colorado, Processing Sites are referred to as the Slick Rock West Processing Site (SRK05) and the Slick Rock East Processing Site (SRK06). This annual event involved sampling both sites for a total of 16 monitoring wells and 6 surface water locations as required by the 2006 Draft Final Ground Water Compliance Action Plan for the Slick Rock, Colorado, Processing Sites (GCAP). A domestic well was also sampled at a property adjacent to the Slick Rock East site at the request of the landowner.

54 ENVIRONMENTAL SCIENCES↗