Techniques for debris mitigation

Techniques for space debris abatement and removal are discussed. Characteristics of the total debris population and the low Earth orbit population are illustrated. Self disposal options that utilize propulsion maneuvers and drag augmentation devices are described. The active retrieval and disposition of large debris objects by collection with a maneuverable space vehicle are discussed. The removal of small debris by using a solar reflector to melt particles or by destruction with high energy laser devices is discussed.

Loftus, Joseph P., Jr.↗

Management of the orbital environment

Data regarding orbital debris are presented to shed light on the requirements of environmental management in space, and strategies are given for active intervention and operational strategies. Debris are generated by inadvertent explosions of upper stages, intentional military explosions, and collisional breakups. Design and operation practices are set forth for minimizing debris generation and removing useless debris from orbit in the low-earth and geosynchronous orbits. Self-disposal options include propulsive maneuvers, drag-augmentation devices, and tether systems, and the drag devices are described as simple and passive. Active retrieval and disposition are considered, and the difficulty is examined of removing small debris. Active intervention techniques are required since pollution prevention is more effective than remediation for the problems of both earth and space.

Loftus, Joseph P., Jr.↗

Space-based OTV boiloff disposition

The boiloff and chilldown problem associated with a reusable space-based orbital transfer vehicle (OTV) that uses the Space Station as a base of operations is considered. Various boiloff and chilldown gas disposal options are examined, and a recommended approach is defined on the basis of least life-cycle cost. In accordance with this approach, half of the gaseous hydrogen is used to generate 3.87 kW, while the remaining hydrogen and the resulting water are remotely vented using the Orbital Maneuvering Vehicle.

Wilkinson, C. L.↗

A feasibility assessment of installation, operation and disposal options for nuclear reactor power system concepts for a NASA growth space station

A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth space station architecture was conducted to address a variety of installation, operational disposition, and safety issues. A previous NASA sponsored study, which showed the advantages of space station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide the feasibility of each combination.

Bloomfield, Harvey S.↗

Geostationary Operational Environmental Satellite (GOES-N report). Volume 1: Technical

The GOES-N study consisted of five distinct tasks including: determining replication costs of GOES I-M and GOES-7 in the GOES-N time frame; defining and evaluating modifications to GOES I-M to improve efficiency or reduce costs; and defining evolutionary changes to the GOES I-M design to satisfy National Weather Service (NWS) 1983 and NOAA 1989 requirements. The categorization and disposition of NOAA requirements is reported in volume 1 section 4. Results of the GOES I-M efficiency/cost improvement modifications study are described in Section 7.1. The system concept options 1, 2, and 3 that generally represent the results of the Task 2, 3A, and 3B studies are summarized in Section 7.2. Another result of the GOES-N study, the determination of which NWS 1983 and NOAA 1989 requirements can be met with the three options, is contained in volume 1 section 7. Conclusions and recommendations are covered in volume 1 section 8. Imager, sounder, control system, space environment monitor, search and rescue, weather facsimile, data collection system, and products/process/communications recommendations were extracted from sections 9, 10, and 11. Section 8 also contains conclusions pertaining to programmatic operational satellite issues (prerequisite development strategies, the direct procurement of instruments by the government, protoflight mission, etc.). Sections 9, 10, and 11 address instrument, control system, image/navigation/registration, and other system design considerations and surveys. These sections are supported by the appendices in volume 2.

Source record↗

Exploration Medical Capability Clinical Decision Support Use Cases for CDSS Test Bed

Long-duration, deep-space exploration missions present significant challenges to crew health and performance. These challenges include the individual and combined effects of microgravity, radiation exposure, isolation, limited resources (mass, volume, power, data, and crew time), limited options for evacuation, and those associated with delayed or constrained communications. Each of these challenges necessitates greater degrees of crew autonomy as our distance from Earth increases. Specifically, as communication delays intensify - and evacuation capability diminishes the further we explore space - the unqualified need for Earth-independent medical operations focused on autonomous diagnosis, treatment and prevention will become key to mission continuation and success. This need will be especially true should a crewmember become ill or injured wherein treatment and disposition “in-situ” ultimately falls to the crew itself to determine. To augment the requisite knowledge, skills, and abilities (KSAs) of a time-constrained exploration mission crew operating under stressful conditions, combatting fatigue, and facing a potential medical crisis, a robust clinical decision support system (CDSS) is a probable solution. A CDSS would facilitate, guide, and inform Earth-independent medical operations while assisting crewmembers through various clinical presentations. The CDSS would allow crewmembers to take advantage of pre-mission training tied to the in-flight/in-mission use of pre-planned protocols that offer both a range of diagnostic options and “just-in-time” (refamiliarization) training and assistance. CDSS will expand such capabilities by improving the utility and effectiveness of various available diagnostic, treatment, and health maintenance tools, techniques, and measures.

ExMC↗

Design of a 2-Hour Prebreathe Protocol for Space Walks (EVAs) from the International Space Station (ISS)

The majority of extravehicular activities (EVAs) performed from the shuttle use a 10.2 psi staged decompression. The International Space Station (ISS) will operate at 14.7 psi, requiring crews to "campout" in the airlock at 10.2 psi. The constraints associated with campout (crew isolation, oxygen usage, and waste management), provided the rationale to develop a 2-hour prebreathe protocol from 14.7 psi. Previous studies on the affect of microgravity and exercise during prebreathe suggested the feasibility of this approach. Various combinations of adynamia (nonwalking subjects), prebreathe exercise doses, and space suit donning options (10.2 vs. 14.7 psi) were analyzed against timeline and consumable constraints. Prospective decompression sickness (DCS) and venous gas emboli (VGE) accept/reject criteria were defined from statistical analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept / reject limits were adjusted for greater safety (including Grade IV VGE criteria) based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center laboratory trial, including the capability of rejecting the primary protocol and testing at least one alternate exercise dose, within the 2-hour prebreathe. The 2-hour protocol incorporates 0, breathing for 5 0 min at 14.7 psi, including 10 min dual cycle ergometry at 75%VO(2max). It requires an additional 30 minO2breathing during depress from 14.7 to 10.2 psi, followed by a 30-60 min suit donning break at 10.2 psi/26.5% O2. It concludes with a 40 min in-suit O2 prebreathe. The protocol would be accepted for operations, if the incidence of DCS was less than 15% and Grade IV VGE less than 20%, both at 95% confidence. The above protocol and accept/reject limits were implemented in a multi-center study.

Gernhardt, M. L.↗

Design and Testing of a 2-Hour Oxygen Prebreathe Protocol for Space Walks from the International Space Station

To develop and test a 2-hour prebreathe protocol for performing extravehicular activities (EVAs) from the International Space Station (ISS). Combinations of adynamia (non-walking), prebreathe exercise, and space suit donning options (10.2 vs. 14.7 psi) were evaluated, against timeline and consumable contraints to develop an operational 2- hour prebreathe protocol. Prospective accept/reject criteria were defined for decompression sickness (DCS) and venous gas emboli (VGE) from analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew-members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept/reject limits were adjusted for greater safety based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center human trial. Protocols were tested with 4 different prebreathe exercises (Phases I-IV), prior to exposure to 4.3 psi for 4 hrs. Subject selection, Doppler monitoring for VGE, test termination criteria, and DCS definitions were standardized. Phase I: upper and lower body exercises using dual-cycle ergometry (75% VO2 max for 10 min). Phase II: ergometry plus 24 min of light exercise (simulating space-suit preparations). Phase III: same 24 min of light exercise but no ergometry, and Phase IV: 56 min of light exercise without ergometry. A prebreathe procedure was accepted if, at 95% confidence, the incidence of DCS was less than 15% (with no Type II DCS), and Grade IV VGE was less than 20%.

Gernhardt, Michael L.↗

Systems Maintenance Automated Repair Tasks (SMART)

SMART is a uniform automated discrepancy analysis and repair-authoring platform that improves technical accuracy and timely delivery of repair procedures for a given discrepancy (see figure a). SMART will minimize data errors, create uniform repair processes, and enhance the existing knowledge base of engineering repair processes. This innovation is the first tool developed that links the hardware specification requirements with the actual repair methods, sequences, and required equipment. SMART is flexibly designed to be useable by multiple engineering groups requiring decision analysis, and by any work authorization and disposition platform (see figure b). The organizational logic creates the link between specification requirements of the hardware, and specific procedures required to repair discrepancies. The first segment in the SMART process uses a decision analysis tree to define all the permutations between component/ subcomponent/discrepancy/repair on the hardware. The second segment uses a repair matrix to define what the steps and sequences are for any repair defined in the decision tree. This segment also allows for the selection of specific steps from multivariable steps. SMART will also be able to interface with outside databases and to store information from them to be inserted into the repair-procedure document. Some of the steps will be identified as optional, and would only be used based on the location and the current configuration of the hardware. The output from this analysis would be sent to a work authoring system in the form of a predefined sequence of steps containing required actions, tools, parts, materials, certifications, and specific requirements controlling quality, functional requirements, and limitations.

Schuh, Joseph↗

A Crew and Logistics Lander for the Common Habitat Architecture

The Common Habitat Architecture is a conceptual study that explores the use of a large habitat derived from the Space Launch System (SLS) liquid oxygen tank as a core habitation element that can be used for crew missions or training in 0g, 1/6g, 3/8g, and 1g. This is not part of current NASA Artemis mission planning, but instead represents an architecture that could potentially follow after the Artemis missions and initial human Mars landings. This architecture leverages Starship-derived vehicles for crew landing on and ascent from the Moon and Mars in support of long-duration surface missions with pressurized crew transfer baselined as a nominal capability. This is not the Human Landing System variant of Starship but represents a number of modifications to enable long-duration surface missions with an eight-person crew size. A rapid brainstorming study was conducted in February of 2021, using only public data, to identify options to deliver the 90-ton Common Habitat to the surface and emplace it at the intended habitation site. This study compared three lunar lander concepts and three Mars lander concepts before ultimately selecting the SpaceX Starship as the most viable lander. The Common Habitat Architecture assumes that this Starship variant can further be modified for crew and cargo delivery, assuming that the use of a common system will lead to cost benefits. It is assumed that the Starship will expend too much propellant in landing crew and logistics to be able to launch, given the assumed absence of surface propellant production. Consequently, a separable ascent stage is used for crew ascent. The pressurized elements of this modified Starship are discussed: Starship Ascent Module, Airlock, Transfer Tunnel, Pressurized Crew Transfer Module, and Logistics Modules. For each element, a description, dimensions, rough mass estimates, core capabilities, and design features are presented. Key mechanisms and internal structures of the starship are also discussed. This will include flame diverters for the ascend module, the orbital docking hatch, Pressurized Crew Transfer Module Garage door, Starship Ascent Module fairing, flame diverter blow-out panels, Pressurized Crew Transfer Module lift system, logistics module lift system, contingency crew ascent via the logistics module lift system, internal catwalks, and structural interfaces. Concept of Operations will be discussed for both Moon and Mars. This will include in-space crew rendezvous and transfer, crewed landing, shirtsleeve crew transfer, crew departure, contingency surface operations, and final element disposition. Key differences for Mars will be discussed, such as the Martian atmosphere, dust storms, the absence of crew handover, and Deep Space Exploration Vehicle rendezvous. Contingency microgravity maintenance access will also be discussed. This work will demonstrate viable pressurized crew transfer with a Starship-based lander architecture. Forward work includes Garage lighting and camera systems, Starship Ascent Module propulsion system and docking port trades, contingency habitation trades, and mass/power equipment estimation. Finally, forward work includes developing a heavy cargo return system derived from the Crew and Logistics Starship. The goal of this system is the return of at least 10,000 kg payloads from the surfaces of the Moon and Mars.

Lunar Lander↗