Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design Reference Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SCIENCE PARAMETRICS FOR MISSIONS TO SEARCH FOR EARTH-LIKE EXOPLANETS BY DIRECT IMAGING

We use N{sub t} , the number of exoplanets observed in time t, as a science metric to study direct-search missions like Terrestrial Planet Finder. In our model, N has 27 parameters, divided into three categories: 2 astronomical, 7 instrumental, and 18 science-operational. For various ''27-vectors'' of those parameters chosen to explore parameter space, we compute design reference missions to estimate N{sub t} . Our treatment includes the recovery of completeness c after a search observation, for revisits, solar and antisolar avoidance, observational overhead, and follow-on spectroscopy. Our baseline 27-vector has aperture D = 16 m, inner working angle IWA = 0.039'', mission time t = 0-5 yr, occurrence probability for Earth-like exoplanets η = 0.2, and typical values for the remaining 23 parameters. For the baseline case, a typical five-year design reference mission has an input catalog of ∼4700 stars with nonzero completeness, ∼1300 unique stars observed in ∼2600 observations, of which ∼1300 are revisits, and it produces N {sub 1} ∼ 50 exoplanets after one year and N {sub 5} ∼ 130 after five years. We explore offsets from the baseline for 10 parameters. We find that N depends strongly on IWA and only weakly on D. It also depends only weakly on zodiacal light for Z < 50 zodis, end-to-end efficiency for h > 0.2, and scattered starlight for ζ < 10{sup –10}. We find that observational overheads, completeness recovery and revisits, solar and antisolar avoidance, and follow-on spectroscopy are all important factors in estimating N.

79 ASTRONOMY AND ASTROPHYSICS↗

TRUE MASSES OF RADIAL-VELOCITY EXOPLANETS

We study the task of estimating the true masses of known radial-velocity (RV) exoplanets by means of direct astrometry on coronagraphic images to measure the apparent separation between exoplanet and host star. Initially, we assume perfect knowledge of the RV orbital parameters and that all errors are due to photon statistics. We construct design reference missions for four missions currently under study at NASA: EXO-S and WFIRST-S, with external star shades for starlight suppression, EXO-C and WFIRST-C, with internal coronagraphs. These DRMs reveal extreme scheduling constraints due to the combination of solar and anti-solar pointing restrictions, photometric and obscurational completeness, image blurring due to orbital motion, and the “nodal effect,” which is the independence of apparent separation and inclination when the planet crosses the plane of the sky through the host star. Next, we address the issue of nonzero uncertainties in RV orbital parameters by investigating their impact on the observations of 21 single-planet systems. Except for two—GJ 676 A b and 16 Cyg B b, which are observable only by the star-shade missions—we find that current uncertainties in orbital parameters generally prevent accurate, unbiased estimation of true planetary mass. For the coronagraphs, WFIRST-C and EXO-C, the most likely number of good estimators of true mass is currently zero. For the star shades, EXO-S and WFIRST-S, the most likely numbers of good estimators are three and four, respectively, including GJ 676 A b and 16 Cyg B b. We expect that uncertain orbital elements currently undermine all potential programs of direct imaging and spectroscopy of RV exoplanets.

79 ASTRONOMY AND ASTROPHYSICS↗

Chromatic effects on the PSF and shear measurement for the Roman Space Telescope High-Latitude Wide Area Survey

Weak gravitational lensing (WL) is a key cosmological probe that requires precise measurement of galaxy images to infer shape distortions, or shear, and constrain cosmology. Accurate estimation of the point spread function (PSF) is crucial for shear measurement, but the wavelength dependence of the PSF introduces chromatic biases that can systematically impact shear inference. We focus on biases arising from spectral energy distribution (SED) differences between stars, used for PSF modelling, and galaxies, used for shear measurement. We investigate these effects in Roman’s four design reference mission WL bands (Y106, J129, H158, F184) and wide filter (W146). Using Roman-like image simulations, we quantify the induced shear biases and compare them to requirements on those biases. Multiplicative biases over all galaxies hover around ~0.2 per cent in the WL bands and 2 per cent in the wide filter, exceeding the mission requirement of |m| < 0.032 per cent and relaxed requirement of |m| < 0.1 per cent⁠. In individual redshift bins, biases can reach 0.4–0.9 per cent for the WL bands and 3–6 per cent for the wide filter. Additive biases remain acceptable in the WL bands but exceed systematic limits in the wide filter. We develop and test PSF-level corrections, showing that a first-order correction reduces biases within survey requirements for the WL bands; however, higher-order terms are necessary for the wide filter. Our results highlight the necessity of chromatic corrections for precision WL with Roman and provide a framework for mitigating these biases. Finally, we compare analytical colour-based corrections to self-organizing maps and find that both methods effectively reduce biases.

79 ASTRONOMY AND ASTROPHYSICS↗

Evaluation of Preventative Radiological/Nuclear Detector Archetypes to Validate Repurpose to the Consequence Management Mission

In the event of a radiological or nuclear emergency involving a large-scale release of radioactive material, local responders would be the primary means to perform radiation measurements to assess impacts and issue protective action recommendations for the responders and the public. Over the first 24-36 hours, Federal responders and resources will deploy to augment the local efforts, and if necessary, provide extensive radiation monitoring and assessment capabilities coordinated by the Department of Energy-led Federal Radiological Monitoring and Assessment Center and Federal Emergency Management Agency-led Multiagency Coordination Group. Unless Federal resources happen to be deployed at the moment an incident occurs, such as a preventative radiological/nuclear detection mission for a scheduled special event, the local response to an incident will commence and persist for many hours with no on-scene Federal support. For a catastrophic incident, such as a nuclear detonation or severe reactor accident, the local jurisdictions may not have a full range of adequate supplies of health physics instruments and personnel dosimetry. Therefore early in a crisis, the local responders will inevitably conduct their operations with the radiation detection and dosimetry capabilities that they have available until additional resources and support are requested and arrive. Most of the radiation detection instruments currently fielded at the local level are carried by law enforcement personnel and are designed for interdiction missions - referred to here as preventative radiological/nuclear detection (PRND) instruments. This study investigated how this PRND equipment can be repurposed in consequence management (CM) missions.

61 RADIATION PROTECTION AND DOSIMETRY↗

ADEPT: A Pedagogical Framework for Integrating Agentic AI with Deterministic Scientific Workflows

The integration of Large Language Models (LLMs) into scientific research promises to accelerate discovery, yet a significant gap remains between the dynamic reasoning of Artificial Intelligence (AI) agents and the static, deterministic nature of canonical scientific workflows. This paper introduces ADEPT (Agentic Discovery and Exploration Platform for Tools), a reference architecture and pedagogical framework explicitly designed to bridge this gap. ADEPT's primary mission is to provide a transparent, "glass-box" environment where researchers and engineers can learn to effectively wrap established scientific software (e.g., BLAST, Nextflow pipelines) and compose it into reliable, agent-driven workflows. We describe its modular, multi-server architecture, which leverages the Model Context Protocol (MCP) for tool serving, LangGraph for robust agentic orchestration, and a secure nsjail-based sandbox for safe code execution. By prioritizing architectural clarity, safety, and modularity, ADEPT serves as an extensible blueprint for building trustworthy AI-augmented systems and fosters the collaborative development necessary to responsibly employ agentic AI for science. We provide practical examples of how to adapt and extend this framework, highlighting its utility in workforce development and AI-readiness capabilities across research and development projects.

97 MATHEMATICS AND COMPUTING↗

Design Guidelines for Deployable Wind Turbines for Defense and Disaster Response Missions

Access to on-site electrical energy is critical to ensuring a successful military or humanitarian response to conflicts and disasters. These missions typically rely on access to liquid fuel that could be vulnerable to disruption or attack during transport. Generating power on location with wind technology can reduce this risk and enhance mission reach by diversifying energy sources. Common characteristics of these missions are short planning and execution time horizons and a global scope of potential locations. Compared to conventional wind turbine applications, defense and disaster response applications place a premium on rapid shipping and installation, short-duration operation (days to months), and quick teardown upon mission completion. These design drivers depart from features found in conventional distributed wind turbines, thus necessitating unique design guidance. The supporting information for this guidance comes from available relevant references, technical analyses, and input from industry and military stakeholders. This poster serves as a summary of project publications which presents the best currently available design guidance for deployable wind turbines to facilitate the effective development and acquisition of technology solutions to support mission success. This Defense and Disaster Deployable Turbine Project (D3T) is a multi-laboratory effort led by Sandia National Laboratories and funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Wind Energy Technologies Office.

deployable wind↗

Design Guidelines for Deployable Wind Turbines for Defense and Disaster Response Missions

Access to on-site electrical energy is critical to ensuring a successful military or humanitarian response to conflicts and disasters. These missions typically rely on access to liquid fuel that could be vulnerable to disruption or attack during transport. Generating power on location with wind technology—whether at a contingency base or disaster response coordination point—can reduce this risk and enhance mission reach by diversifying energy sources. Common characteristics of these missions are short planning and execution time horizons and a global scope of potential locations. Compared to conventional wind turbine applications, defense and disaster response applications place a premium on rapid shipping and installation, short-duration operation (days to months), and quick teardown upon mission completion. These design drivers depart from features found in conventional distributed wind turbines, thus necessitating unique design guidance. The supporting information for this guidance comes from available relevant references, technical analyses, and input from industry and military stakeholders. This paper serves as a summary of the full report, Design Guidelines for Deployable Wind Turbines for Military Operational Energy Applications (Sandia report SAND2021-14581 R [1]), which presents the best currently available design guidance for deployable wind turbines to facilitate the effective development and acquisition of technology solutions to support mission success.

17 WIND ENERGY↗

Physics and Engineering Assessmetns of the K-DEMO Magnet Configuration

Increased attention is being given now to studies of next-step fusion facilities with nuclear missions. Among these, South Korea's K DEMO is unique in its focus on a high toroidal magnetic field, large major radius, steady-state tokamak design for the core of a facility to test fusion nuclear components in Phase I and, after upgrades, produce 500 MW of electricity in a Phase II. Innovative features of the K DEMO magnet set include the use of two toroidal field (TF) coil winding packs with conductor grading and a machine configuration designed for vertical maintenance. The magnet arrangement features large TF coils and widely spaced poloidal field (PF) coils to accommodate removal of in-vessel components as large modules. Physics and engineering assessments of the pre-conceptual K-DEMO magnet configuration are reported, including: 1) design point and operating space assessment, 2) conductor assessment, and 3) structural assessment. It is found that a reference design point at 6.8 m major radius and 7.4 T toroidal field provides sufficient operating margins for the 500 MWe Phase II mission. Analyses of candidate cable-in-conduit conductors provide predictions of critical current degradation, both in the initial load cycle and an additionally with cyclic loading. A first-pass global analysis of the magnet system found minimal out-of-plane deformations of the TF coil, but an overstress condition in the inner leg of the TF coil. However an analysis taking into account elastic-plastic behavior, frictional sliding, and displacement shows that the structure can safely carry the load. Although the design evolution is still at an early stage, these assessments support the design point choices to date and the expectation that a feasible solution for the high-field K DEMO magnet system can be found.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Addressing Excess Contaminated Facilities and Mercury Cleanup At the Department of Energy's Oak Ridge Reservation - 18408

The U.S. Department of Energy's Oak Ridge Office of Environmental Management (OREM) and its prime cleanup contractor, URS | CH2M Oak Ridge LLC (UCOR) are executing an aggressive program of cleanup and risk reduction in excess contaminated facilities on the Oak Ridge Reservation (ORR). Across the complex, DOE has designated more than 2,300 of its facilities 'excess'. Excess means 'nonoperational' and refers to a facility for which DOE no longer has a mission need. Many of these facilities pose high risk to workers and/or the environment. Delayed cleanup increases risk as well as cost. OREM and UCOR initiated a Working Group on Excess Facilities to identify and prioritize activities that are needed to enhance worker safety, minimize further degradation of the facilities, and reduce the environmental risk. Six Excess Contaminated Facilities projects on the ORR were identified as priorities. Three of the projects are located at ORNL - the Building 7500 Homogenous Reactor Experiment, the Building 3026 Radioisotope Development Laboratory and Buildings 3028/3029 Isotope Facilities. At Y-12, priority excess facilities include the Column Exchange Equipment (COLEX), the Alpha-4 Lithium Enrichment Facility and the Biology Complex Research Facilities. Work on these projects is aimed at stabilization of degraded higher risk facilities, characterization of conditions and hazards, removal of hazardous materials and placement of the facility in the lowest risk condition possible pending demolition. At the same time, DOE and UCOR are preparing to undertake a comprehensive program to remediate the presence of mercury in the water stemming from historical operations at the Y-12 National Security Complex. Over decades of operations, mercury migrated into the environment. Deteriorating conditions of large post-operation mercury-use buildings may be contributing to additional releases. Mercury cleanup is a high priority for Y-12 and the Oak Ridge Reservation. UCOR is completing the final design on a new Mercury Treatment Facility with construction expected to begin in late 2017. When constructed the treatment facility will reduce the amount of mercury in local waters, lower environmental contamination levels and serve as a guard against future releases. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology and Tool for the Physical Security Analysis of Micro and Advanced Reactors

This work proposes a dynamic evaluation methodology to relax the conservatism in physical security evaluation, by leveraging an ongoing work in the Light Water Reactor Sustainability pathway. This methodology is implemented in a dynamic risk assessment tool named Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The work extends EMRALD’s capability to support a sandbox feature where analysts can easily create attack scenarios and modify advanced/small modular reactor (A/SMR) security and safety features using templates. This approach saves time and cost since the analysis does not require creating detailed computer-aided design models, as is commonly required in commercial force-on-force software tools. EMRALD is completely free to use at https://emraldapp.inl.gov. We have developed basic templates including physical barriers, intrusion sensors, physical areas, and safety actions, that can be downloaded from EMRALD’s GitHub site: https://github.com/idaholab/EMRALD. These templates use generic data commonly used for training purposes, which do not reflect any actual operating nuclear reactor. Users may adjust the data in the templates with their own dataset and/or create new templates in EMRALD. The proposed methodology combines security and safety by assessing sabotage effects up to the radiological consequence to the public instead of merely the core damage state. This practice follows the industry standard for advanced non-light-water reactors currently proposed for endorsement by the Nuclear Regulatory Commission. The combination of security and safety is expressed in an achievability-consequence chart. EMRALD can be used to generate data for this chart. A hypothetical case study using a representative sodium-cooled fast reactor (SFR) facility is presented in this report to demonstrate this methodology. This case study does not contain any actual nuclear plant information. This work will benefit A/SMR vendors and utilities to implement security by design during the reactor design iteration phase, such that they do not have to perform upgrades and retrofits to the reactor after it is installed to improve its physical protection system. The tool may also be used to analyze domestic or foreign reactor designs to support the International Nuclear Security Techniques for Advanced Reactors (INSTAR) bilateral missions. Future works are planned to implement the methodology on a reference SFR reactor and a reference high-temperature gas-cooled reactor to obtain insights and lessons-learned for the A/SMR community.

97 MATHEMATICS AND COMPUTING↗

SuperCam Calibration Targets: Design and Development

Abstract SuperCam is a highly integrated remote-sensing instrumental suite for NASA’s Mars 2020 mission. It consists of a co-aligned combination of Laser-Induced Breakdown Spectroscopy (LIBS), Time-Resolved Raman and Luminescence (TRR/L), Visible and Infrared Spectroscopy (VISIR), together with sound recording (MIC) and high-magnification imaging techniques (RMI). They provide information on the mineralogy, geochemistry and mineral context around the Perseverance Rover. The calibration of this complex suite is a major challenge. Not only does each technique require its own standards or references, their combination also introduces new requirements to obtain optimal scientific output. Elemental composition, molecular vibrational features, fluorescence, morphology and texture provide a full picture of the sample with spectral information that needs to be co-aligned, correlated, and individually calibrated. The resulting hardware includes different kinds of targets, each one covering different needs of the instrument. Standards for imaging calibration, geological samples for mineral identification and chemometric calculations or spectral references to calibrate and evaluate the health of the instrument, are all included in the SuperCam Calibration Target (SCCT). The system also includes a specifically designed assembly in which the samples are mounted. This hardware allows the targets to survive the harsh environmental conditions of the launch, cruise, landing and operation on Mars during the whole mission. Here we summarize the design, development, integration, verification and functional testing of the SCCT. This work includes some key results obtained to verify the scientific outcome of the SuperCam system.

Manrique, J. A. (ORCID:0000000220532819)↗

Design Guidelines for Deployable Wind Turbines for Military Operational Energy Applications

This document aims to provide guidance on the design and operation of deployable wind systems that provide maximum value to missions in defense and disaster relief. Common characteristics of these missions are shorter planning and execution time horizons and a global scope of potential locations. Compared to conventional wind turbine applications, defense and disaster response applications place a premium on rapid shipping and installation, short-duration operation (days to months), and quick teardown upon mission completion. Furthermore, defense and disaster response applications are less concerned with cost of energy than conventional wind turbine applications. These factors impart design drivers that depart from the features found in conventional distributed wind turbines, thus necessitating unique design guidance. The supporting information for this guidance comes from available relevant references, technical analyses, and input from industry and military stakeholders. This document is not intended to be a comprehensive, prescriptive design specification. This document is intended to serve as a written record of an ongoing discussion of stakeholders about the best currently available design guidance for deployable wind turbines to help facilitate the effective development and acquisition of technology solutions to support mission success. The document is generally organized to provide high-level, focused guidance in the main body, with more extensive supporting details available in the referenced appendices. Section 2 begins with a brief qualitative description of the design guidelines being considered for the deployable wind turbines. Section 3 provides an overview of the characteristics of the mobile power systems commonly used in U.S. military missions. Section 4 covers current military and industry standards and specifications that are relevant to a deployable wind turbine design. Section 5 presents the deployable turbine design guidelines for the application cases.

17 WIND ENERGY↗

The PIP-II Reference Design Report

The Proton Improvement Plan-II (PIP-II) is a high-intensity proton facility being developed to support a world-leading neutrino program over the next two decades at Fermilab. PIP-II is an integral part of the U.S. Intensity Frontier Roadmap as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 [1]. As an immediate goal PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing a beam power in excess of 1 MW on target at the initiation of LBNF [1,2] operations. PIP-II is a part of a longer-term concept for a sustained campaign of upgrades and improvements to achieve multi-MW capabilities at Fermilab. PIP-II is based on three major thrusts. They are (1) the recently completed upgrades to the Recycler and Main Injector (MI) for the NOvA experiment, (2) the Proton Improvement Plan [3] currently underway, and (3) the Project X Reference Design [4]. Note that: The Proton Improvement Plan (PIP) consolidates a set of improvements to the existing Linac, Booster, and Main Injector (MI) aimed at supporting 15 Hz Booster beam operation. In combination, the NOvA upgrades and PIP create a capability of delivering 700 kW beam power from the Main Injector at 120 GeV; The scope of the Project X Reference Design Report was aimed well beyond PIP. It described a complete concept for a multi-MW proton facility that could support a broad particle physics program based on neutrino, kaon, muon, and nucleon experiments [5,6]. The Project X conceptual design has evolved over a number of years, incorporating continuous input on physics research goals and advances in the underlying technology development programs [7,8,9]. PIP-II, to high degree, inherits these goals as the goals for future developments and upgrades. This document (PIP-II Reference Design Report) describes an initial step in the development of the Fermilab accelerating complex. The plan described in this Report balances the far-term goals of the Laboratory's long baseline neutrino mission with the near- and mid-term goals identified at the Snowmass workshop [10] and endorsed by the P5 report [1].

43 PARTICLE ACCELERATORS↗

FCRD Advanced Reactor (Transmutation) Fuels Handbook

Transmutation of minor actinides such as Np, Am, and Cm in spent nuclear fuel is of international interest because of its potential for reducing the long-term health and safety hazards caused by the radioactivity of the spent fuel. One important approach to transmutation (currently being pursued by the DOE Fuel Cycle Research & Development Advanced Fuels Campaign) involves incorporating the minor actinides into U-Pu-Zr alloys, which can be used as fuel in fast reactors. U-Pu-Zr alloys are well suited for electrolytic refining, which leads to incorporation rare-earth fission products such as La, Ce, Pr, and Nd. It is, therefore, important to understand not only the properties of U-Pu-Zr alloys but also those of U-Pu-Zr alloys with concentrations of minor actinides (Np, Am) and rare-earth elements (La, Ce, Pr, and Nd) similar to those in reprocessed fuel. In addition to requiring extensive safety precautions, alloys containing U, Pu, and minor actinides (Np and Am) are difficult to study for numerous reasons, including their complex phase transformations, characteristically sluggish phasetransformation kinetics, tendency to produce experimental results that vary depending on the histories of individual samples, rapid oxidation, and sensitivity to contaminants such as oxygen in concentrations below a hundred parts per million. Although less toxic, rare-earth elements such as La, Ce, Pr, and Nd are also difficult to study for similar reasons. Many of the experimental measurements were made before 1980, and the level of documentation for experimental methods and results varies widely. It is, therefore, not surprising that little is known with certainty about U-Pu-Zr alloys, particularly those that also contain minor actinides and rare-earth elements. General acceptance of results commonly indicates that there is only a single measurement for a particular property. This handbook summarizes currently available information about U, Pu, Zr, Np, Am, La, Ce, Pr, and Nd and alloys of two or three of these elements. It contains information about phase diagrams and related information (including phases and phase transformations); heat capacity, entropy, and enthalpy; thermal expansion; and thermal conductivity and diffusivity. In addition to presenting information about materials properties, the handbook attempts to provide information about how well the property is known and how much variation exists between measurements. Although it includes some results from models, its primary focus is experimental data. The Handbook is organized in two sections: one with information about the U-Pu-Zr ternary and one with information about other elements and binary and vi ternary alloys in the U-Np-Pu-Am-La-Ce-Pr-Nd-Zr system. Within each section, information about elements is presented first, followed by information about binary alloys, then information about ternary alloys. The order in which the elements in each alloy are mentioned follows the order in the first sentence of this paragraph. Much of the information on the U-Pu-Zr system repeats information from the FCRD Transmutation Fuels Handbook 2015. Most of the other data has been published elsewhere (although scattered throughout numerous references, some quite obscure); however, some data from Idaho National Laboratory is presented here for the first time. As the FCRD programmatic mission evolves, future editions of this handbook will begin to include other advanced reactor fuel designs and compositions. Hence, the title of the handbook will transition to the Advanced Reactor Fuels Handbook.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Feasibility of Power Ramp Testing in the Advanced Test Reactor

For decades, the Halden Boiling Water Reactor (HBWR) in Norway was an international resource for assessing nuclear fuels and materials behavior and its unexpected shutdown in 2018 represented a significant loss in experimental capability for prototypical irradiation testing. In the aftermath of the closure, a study was performed to assess capability gaps related to the Accident Tolerant Fuels (ATF) program. It was concluded that the primary capability gaps left by the closure of the HBWR were the loss of prototypic in-pile Light Water Reactor (LWR) loops that provide operational transient testing and in-pile Loss-of-Coolant Accident (LOCA) testing capabilities. The study also concluded that the Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) likely have the necessary key capabilities to absorb the breadth of the HBWR mission gaps related to the ATF program, but additional investments in experimental infrastructure were needed. One such investment is the design and installation of additional pressurized water loops in the medium-I positions of the ATR, hereafter referred to as I-Loops, to support power ramp testing and testing in Boiling Water Reactor (BWR) conditions. This paper gives an overview of the planned ATR I-Loops and assesses the feasibility of performing power ramp testing inside such a loop.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iodine Standard Materials: Preparation and Inter-Laboratory Comparisons

The Idaho National Laboratory is preparing to enter the community of AMS practioners who analyze for 129Iodine. We expect to take delivery of a 0.5 MV compact accelerator mass spectrometry system, built by NEC, in the early summer of 2014. The primary mission for this instrument is iodine; it is designed to analyze iodine in the +3 charge state. As part of the acceptance testing for this instrument, both at NEC and on-site in our laboratory, some sort of standard or reference material is needed to verify performance. Appropriate standard materials are not readily available in the commercial marketplace. Small quantities can sometimes be acquired from other laboratories already engaged in iodine analyses. In the longer-term, meaningful quantities of standard materials are needed for routine use in analyses, and for quality control functions1. We have prepared some standard materials, starting with elemental Woodward iodine and NIST SRM 3231 [Iodine-129 Isotopic Standard (high level)] 10-6 solution. The goal was to make mixtures at the 5x10-10, 5x10-11, 5x10-12 ratio levels, along with some unmodified Woodward, in the chemical form of silver iodide. Approximately twenty grams of each of these mixtures were prepared. The elemental Woodward iodine was dissolved in chloroform, then reduced to iodide using sodium bisulfite in water. At this point the NIST spike material was added, in the form of sodium iodide. The mixed iodides were oxidized back to iodine in chloroform using hydrogen peroxide. This oxidation step was essential for isotopic equilibration of the 127 and 129 atoms. The iodine was reduced to iodide using sodium bisulfite as before. Excess sulfites and sulfates were precipitated with barium nitrate. After decanting, silver nitrate was used to precipitate the desired silver iodide. Once the silver iodide was produced, the material was kept in darkness as much as possible to minimize photo-oxidation. The various mixtures were synthesized independently of each other; there were no serial dilutions involved. Aliquots of these four materials have been submitted to five established AMS laboratories where iodine analyses are routinely performed: ETH (Zurich), CNA (Seville), PRIME (Purdue), LLNL (California), and Isotrace (Toronto.) Results from four of these laboratories have been received; in general they indicate that the desired 129/127 ratios have been achieved. We will discuss the results of this informal round-robin exercise. If the installation of the instrument in Idaho goes well, we may have some very preliminary results from the new system. An integral part of data reporting is the approach to data reduction. Accordingly, there will also be some discussion of various philosophies of data handling in regard to the use of standards to adjust data, and background subtraction.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Thermal Analysis of the Sirius-3 Nuclear Propulsion Fuel Experiments

To support long space missions, NASA is designing and testing different fuels for nuclear thermal propulsion. These designs include a number ceramic metallic fuels which are to be irradiated in the Tranisent Test Reactor to test the fuel’s performance at protypical conditions. The irradiation campaign of these fuels is referred to as the Sirius experiments, and includes single and stacked experiment samples. In this paper we present the thermal analysis of the Sirius-3 experiment. For this analysis, temperatures from a Bison finite element model are compared to the temperatures obtained from an experiment thermocouple where good agreement between the two are found. Because agreement of the thermocouple and Bison finite element model, insight into the heat flow is provided to experimenters as they design future experiments. As an example of this insight, the rods through the fuel specimen as shown in Sirius A and B [1] were removed and replaced with hold down rings for the Sirius-2C

33 ADVANCED PROPULSION SYSTEMS↗