Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DRILLING RIGS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Chesapeake Bay Impact Crater: An Educational Investigation for Students into the Planetary Impact Process and its Environmental Consequences

Planetary impact craters are a common surface feature of many planetary bodies, including the Earth, the Moon, Mars, Mercury, Venus, and Jupiter s moons, Ganymede and Callisto. The NASA Langley Research Center in Hampton, VA, is located about 5 km inside the outer rim of the Chesapeake Bay Impact Crater. The Chesapeake Bay Impact Crater, with a diameter of 85 km is the sixth largest impact crater on our planet. The U.S. Geological Survey (USGS), in collaboration with the NASA Langley Research Center, the Virginia Department of Environmental Quality (VDEQ), the Hampton Roads Planning District Commission (HRPDC), and the Department of Geology of the College of William and Mary (WM) drilled into and through the crater at the NASA Langley Research Center and obtained a continuous core to a depth of 2075.9 ft (632.73 meters) from the Chesapeake Bay Impact Crater. At the NASA Langley location, the granite basement depth was at 2046 ft (623.87 meters). This collaborative drilling activity provided a unique educational opportunity and ongoing educational partnership between USGS, NASA Langley and the other collaborators. NASA Langley has a decade-long, ongoing educational partnership with the Colonial Coast Council of the Girl Scouts. The core drilling and on site analysis and cataloguing of the core segments provided a unique opportunity for the Girl Scouts to learn how geologists work in the field, their tools for scientific investigation and evaluation, how they perform geological analyses of the cores in an on-site tent and learn about the formation of impact craters and the impact of impacting bodies on the sub-surface, the surface, the oceans and atmosphere of the target body. This was accomplished with a two-part activity. Girl Scout day camps and local Girl Scout troops were invited to Langley Research Center Conference Center, where more than 300 Girl Scouts, their leaders and adult personnel were given briefings by scientists and educators from the USGS, NASA, VDEQ, HRPDC and WM on the principles of geology, the formation of impact craters, the consequences of the impacting body on the atmosphere, ocean, surface and sub-surface, the geological, chemical and biological analyses of the core and the cataloguing and storage of the core segments, etc. After the briefings, the Girl Scouts visited the drilling site where they inspected the core drilling rig, examined the core samples and discussed the drilling procedures, cores and interpretation of the cores with scientists and educators from the organizations conducting the core drilling. Demonstrations at the drilling site included demonstrations of impacting objects hitting multi-colored layered mud targets at different angles of entry. The multi-colored layers of mud were instructive in mapping out the distribution of impact-ejected material around the impact crater. The presentation will include a series of photographs of the Girl Scout participating in activities at the Chesapeake Bay Impact Crater drill site, including retrieving cores from the drilling rig, inspecting the core samples and participating in the impact-crater formation demonstrations.

Levine, Arlene S.↗

Blowout Monitor

C Language Integrated Production System (CLIPS), a NASA-developed software shell for developing expert systems, has been embedded in a PC-based expert system for training oil rig personnel in monitoring oil drilling. Oil drilling rigs if not properly maintained for possible blowouts pose hazards to human life, property and the environment may be destroyed. CLIPS is designed to permit the delivery of artificial intelligence on computer. A collection of rules is set up and, as facts become known, these rules are applied. In the Well Site Advisor, CLIPS provides the capability to accurately process, predict and interpret well data in a real time mode. CLIPS was provided to INTEQ by COSMIC.

Source record↗

Vectorization of a penalty function algorithm for well scheduling

In petroleum engineering, the oil production profiles of a reservoir can be simulated by using a finite gridded model. This profile is affected by the number and choice of wells which in turn is a result of various production limits and constraints including, for example, the economic minimum well spacing, the number of drilling rigs available and the time required to drill and complete a well. After a well is available it may be shut in because of excessive water or gas productions. In order to optimize the field performance a penalty function algorithm was developed for scheduling wells. For an example with some 343 wells and 15 different constraints, the scheduling routine vectorized for the CYBER 205 averaged 560 times faster performance than the scalar version.

Absar, I.↗

Quick-Connect, Self-Alining Latch

Sturdy latch tolerates 10 degrees of angular mismatch in joining structural elements. Hexagonal passive plate nests in active plate, guided by capture plates and alinement keys and grooves. Center hole in both active and passive plates is 1 meter in diameter. Latch has possible uses a pipe joint, connector for parts of portable structures, and fitting for marine risers on offshore drilling rigs.

Burns, G. C.↗

Mars surface science requirements and plan

The requirements for obtaining geological, geochemical, geophysical, and meteorological data on the surface of Mars associated with manned landings were analyzed. Specific instruments were identified and their mass and power requirements estimated. A total of 1 to 5 metric tons, not including masses of drill rigs and surface vehicles, will need to be landed. Power associated only with the scientific instruments is estimated to be 1 to 2 kWe. Requirements for surface rover vehicles were defined and typical exploration traverses during which instruments will be positioned and rock and subsurface core samples obtained were suggested.

Blacic, J. D.↗

Lunar deep drill apparatus

A self contained, mobile drilling and coring system was designed to operate on the Lunar surface and be controlled remotely from earth. The system uses SKITTER (Spatial Kinematic Inertial Translatory Tripod Extremity Robot) as its foundation and produces Lunar core samples two meters long and fifty millimeters in diameter. The drill bit used for this is composed of 30 per carat diamonds in a sintered tungsten carbide matrix. To drill up to 50 m depths, the bit assembly will be attached to a drill string made from 2 m rods which will be carried in racks on SKITTER. Rotary power for drilling will be supplied by a Curvo-Synchronous motor. SKITTER is to support this system through a hexagonal shaped structure which will contain the drill motor and the power supply. A micro-coring drill will be used to remove a preliminary sample 5 mm in diameter and 20 mm long from the side of the core. This whole system is to be controlled from earth. This is carried out by a continuously monitoring PLC onboard the drill rig. A touch screen control console allows the operator on earth to monitor the progress of the operation and intervene if necessary.

Harvey, Jill↗

Internal Wave Study in the South China Sea Using SAR

Recently, the internal wave distribution maps in the China Seas have been compiled from hundreds of ERS-1/2, RADARSAT, and Space Shuttle SAR (Synthetic Aperture Radar) images from 1993 to 1999. Based on internal wave distribution map, most of internal waves in the northeast part of South China Sea were propagating westward. The wave crest can be as long as 200 km with amplitude of 100 m due to strong current from the Kuroshio branching out into the South China Sea. Based on the observations from drilling rigs near DongSha Island by Amoco Production Co., the solitons may be generated in a 4 km wide channel between Batan and Sabtang islands in Luzon Strait. The proposed generation mechanism is similar to the lee wave formation from a shallow topography. Both depression and elevation internal waves have been observed in the same RADARSAT ScanSAR image on May 4, 1998 near DongSha Island. Furthermore, depression and elevation internal waves have also been observed by SAR at the same location on the shelf in April and June, 1993 (in different seasons) respectively. Numerical models have been used to interpret their generation mechanism and evolution processes. Based on the SAR images, near DongSha Island, the westward propagating huge internal solitons are often encountered and diffracted/broken by the coral reefs on the shelf. After passing the island, the diffracted waves will re-merge or interact with each other. It has been observed that after the nonlinear wave-wave interaction, the phase of wave packet is shifted and wavelength is also changed. Examples of mesoscale features observed in SAR images, such as fronts, raincells, bathymetry, ship wakes, and oil spills will be presented. Recent mooring measurements in April 1999 near Dongsha Island, future field test ASIAEX (Asian Seas International Acoustics Experiment) planned for April 2001, and some pretest survey data will be discussed in this paper.

Liu, Antony K.↗

Electronic Nose

Grace Industries, Inc.'s Electronic Nose is a vapor and gas detector, deriving from NASA's electronic circuitry, capable for sensing the presence of accelerants several days after a fire. The device is powered by rechargeable battery and no special training needed to operate. If an accelerant is present, device will emit a beeping sound and trigger a flashing light; the faster the beep rate, the more volatile the accelerant. Its sensitivity can also detect minute traces of accelerants. Unit saves investigators of fire causes time and expense by providing speedy detection of physical evidence for use in court. Device is also useful for detecting hazardous fumes, locating and detecting gas leaks in refineries and on oil drilling rigs.

Source record↗

NASA DEVELOP Students Rev Up Response to Gulf Oil Spill

After the April 20th explosion aboard the Deepwater Horizon drilling rig in the Gulf of Mexico, the world witnessed one of the worst oil spill catastrophes in global history. In an effort to mitigate the disaster, the U.S. government moved quickly to establish a unified command for responding to the spill. Some of the command's most immediate needs were to track the movement of the surface oil slick, establish a baseline measurement of pre-oil coastal ecosystem conditions, and assess potential air quality and water hazards related to the spill. To help address these needs and assist the Federal response to the disaster, NASA deployed several of its airborne and satellite research sensors to collect an unprecedented amount of remotely-sensed data over the Gulf of Mexico region. Although some of these data were shared with the public via the media, much of the NASA data on the disaster was not well known to the Gulf Coast community. The need existed to inform the general public about these datasets and help improve understanding about how NASA's science research was contributing to oil spill response and recovery. With its extensive experience conducting community-oriented remote sensing projects and close ties to organizations around Gulf of Mexico, the NASA DEVELOP National Program stood in a unique position to meet this need.

Jones, Jason B.↗

Stand Alone Electrical Equipment PRL 227a (Formerly PRL 227 LOC3) Confirmatory Sampling Report Addendum

HydroGeoLogic, Inc. (HGL) prepared this Confirmatory Sampling Report Addendum (CSRA) for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida. PRL 227a Location of Concern (LOC) 3 is located on 10th Street, west of the former Vertical Processing Facility (M7-1469), SWMU 077. The Load Break Switches (LBS) were installed in 1986 and are suspected to have formerly contained dielectric fluid that contained polychlorinated biphenyls (PCBs). The LBS were replaced in 1993 with new LBSs that do not contain PCBs. The LBS are located on a concrete pad surrounded by grass that is mowed and maintained. A total of 330 soil samples were collected between June 2020 and December 2022 from 88 locations at depths ranging from 0-0.5 to 19-20 ft bls. In general, soil samples collected from depths less than 5 ft were collected via hand auger and samples collected beyond 5 ft bls were collected using a direct-push technology drill rig. Soil samples collected from greater than 5 ft bls to 20 ft bls were collected to confirm PCBs were not present at depth in the aquifer matrix. Delineation samples were collected using an approximately 20 ft horizontal spacing. PCB impacted soil has been completely delineated to the State of Florida residential soil cleanup target level (SCTL) at PRL 227a horizontally and vertically. PCB concentrations have been identified above the residential and industrial SCTL as well as concentrations greater than or equal to 50 ppm requiring coordination with EPA and disposal at a facility authorized under TSCA. Based upon the CSRA sampling, an interim measure is recommended to remove PCB impacted soil above the residential SCTL. The total volume of PCB impacted soil to be removed is 591.6 cubic yards. This includes approximately 9.3 cubic yards of soil with PCB concentrations greater than or equal to 50 ppm. An interim measure work plan is included as an attachment to this report.

electrical equipment↗

Estimating Tropical Cyclone Threats to Floating Rigs in the Gulf of Mexico

Offshore drilling operations in the Gulf of Mexico are particularly vulnerable during hurricane season. When a weather threat arises, a decision to evacuate the rig and/or move to a safe location may need to be made. Securing the well, evacuating, and/or moving to a safe location can take a considerable amount of time. This transition time is called T-time. T-time is not only rig dependent, but also depends on the activity being performed at the time of the threat. For these reasons, it is important to assess tropical cyclone threats and the estimated time it will take the storm to reach the rig location from the time it is first detected. The objective of this study is to use 50 years of cyclone history from a National Oceanic and Atmospheric Administration’s (NOAA) database, the International Best Track Archive for Climate Stewardship (IBTrACS) to estimate cyclone threats at any location in the Gulf of Mexico. The cyclone threat is estimated based on the rig location as well as the start date and duration of the offshore activity. By threat, it is meant the likelihood that a specific location with an associated offshore activity lies within the forecasted track cone and storm size of the upcoming cyclone. Three representative rig locations in the Gulf of Mexico were selected as assessment sites to evaluate the threat of incoming cyclones for different T-times. To conduct this tropical cyclone study, an Excel spreadsheet tool was developed to automate the analysis of the tropical cyclone data. The spreadsheet tool allows the user to input any location (i.e., longitude and latitude) in the Gulf of Mexico and displays a list of historical cyclones that have passed within 150 nautical miles of that location during the activity period selected by the user. In addition, the tool allows the user to input any T-time to assess the threat of cyclones that would not provide adequate time to secure the well, evacuate, and/or move to a safe location.

Offshore Oil Drilling↗

Estimating Tropical Cyclone Threats to Floating Rigs in the Gulf of Mexico

Offshore drilling operations in the Gulf of Mexico are particularly vulnerable during hurricane season. When a weather threat arises, a decision to evacuate the rig and/or move to a safe location may need to be made. Depending on the activities in progress at the time of the threat, securing the well, evacuating, and/or moving to a safe location can take a considerable amount of time. This transition time is called T-time. T-time is not only rig dependent, but also depends on the activity being performed at the time of the threat. For these reasons it is important to assess tropical cyclone threats and the time it takes for them to reach the rig location. The objective of this study is to use the available 50 years of past cyclone history to estimate cyclone threats at any location in the Gulf of Mexico. The cyclone threat is estimated based on the rig location as well as the start date and duration of the offshore activity. By threat, it is meant the likelihood that a specific location with an associated offshore activity would be exposed to an upcoming cyclone whose forecasted track cone and storm size lies within that location. Three representative rig locations in the Gulf of Mexico were selected as assessment sites to evaluate the threat of incoming cyclones for different T-times. To conduct this tropical cyclone study, an Excel spreadsheet tool was developed to automate the analysis of the tropical cyclone data from the Best Track Archive for Climate Stewardship (IBTrACS) Version 4. The spreadsheet tool allows the user to input any location (i.e., longitude and latitude) in the Gulf of Mexico and displays a list of historical cyclones that have passed within 150 nautical miles of that location during the activity period selected by the user. Also, the tool allows the user to input a T-time to assess the threat of cyclones that would not provide adequate time to secure the well, evacuate, and/or move to a safe location.

Risk↗

Risk Management at NASA and Its Applicability to the Oil and Gas Industry

NASA has a world-class capability for quantitatively assessing the risk of highly-complex, isolated engineering structures operated in extremely hostile environments. In particular, the International Space Station (ISS) represents a reasonable risk analog for High Pressure, High Temperature drilling and production operations on deepwater rigs. Through a long-term U.S. Government Interagency Agreement, BSEE has partnered with NASA to modify NASA's Probabilistic Risk Assessment (PRA) capabilities for application to deepwater drilling and production operations. The immediate focus of the activity will be to modify NASA PRA Procedure Guides and Methodology Documents to make them applicable to the Oil &Gas Industry. The next step will be for NASA to produce a PRA for a critical drilling system component, such as a Blowout Preventer (BOP). Subsequent activities will be for NASA and industry partners to jointly develop increasingly complex PRA's that analyze other critical drilling and production system components, including both hardware and human reliability. In the presentation, NASA will provide the objectives, schedule, and current status of its PRA activities for BSEE. Additionally, NASA has a Space Act Agreement with Anadarko Petroleum Corporation to develop a PRA for a generic 20K BOP. NASA will summarize some of the preliminary insights gained to date from that 20K BOP PRA as an example of the distinction between quantitative versus qualitative risk assessment.

PRA↗

Engagement of Metal Debris into a Gear Mesh

A series of bench top experiments was conducted to determine the effects of metallic debris being dragged through meshing gear teeth. A test rig that is typically used to conduct contact fatigue experiments was used for these tests. Several sizes of drill material, shim stock, and pieces of gear teeth were introduced and then driven through the meshing region. The level of torque required to drive the "chip" through the gear mesh was measured. From the data gathered, chip size sufficient to jam the mechanism can be determined. INTRODUCTION In some space mechanisms the loading can be so high that there is some possibility that a gear chip might be liberated while in operation of the mechanism [1-5]. Also, due to the closely packed nature of some space mechanisms and the fact that a space grease is used for lubrication, chips that are released can then be introduced to other gear meshes within this mechanism. In this instance, it is desirable to know the consequences of a gear chip entering in between meshing gear teeth. To help provide some understanding, a series of bench-top experiments was conducted to engage chips of simulated and gear material fragments into a meshing gear pair. One purpose of the experiments was to determine the relationship of chip size to the torque required to rotate the gear set through the mesh cycle. The second purpose was to determine the condition of the gear chip material after engagement by the meshing gears, primarily to determine if the chip would break into pieces and to observe the motion of the chip as the engagement was completed. This document also presents preliminary testing done with metal debris other than chips from gears, namely steel shim stock and drill bits of various sizes and diameters.

Handschuh, Robert F.↗

Engagement of Metal Debris into a Gear Mesh

A series of bench top experiments was conducted to determine the effects of metallic debris being dragged through meshing gear teeth. A test rig that is typically used to conduct contact fatigue experiments was used for these tests. Several sizes of drill material, shim stock, and pieces of gear teeth were introduced and then driven through the meshing region. The level of torque required to drive the "chip" through the gear mesh was measured. From the data gathered, chip size sufficient to jam the mechanism can be determined.

Handschuh, Robert F.↗

Engagement of Metal Debris into Gear Mesh

A series of bench-top experiments was conducted to determine the effects of metallic debris being dragged through meshing gear teeth. A test rig that is typically used to conduct contact fatigue experiments was used for these tests. Several sizes of drill material, shim stock and pieces of gear teeth were introduced and then driven through the meshing region. The level of torque required to drive the "chip" through the gear mesh was measured. From the data gathered, chip size sufficient to jam the mechanism can be determined.

handschuh, Robert F.↗