Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

GridSweep Processing and Graphing Software v1.0

This software is used to process the raw data from the GridSweep instrument, a device developed under subcontract by McEachern Laboroatories for a DOE GMLC project. The software scrubbs, demodulates, and transforms point on wave voltage timeseries data into frequency/voltage amplitude/time data. It also has a GUI that allows for user selection of processed experimental data and graphing in heatmaps or 3-D plots. It was created alongside the GridSweep instrument as a part of the same project and is required to be open-source.

McEachern, Alex↗

Interoperability Maturity Roadmap Methodology, V1.3

The Interoperability Roadmap Methodology document supports the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) Interoperability Project’s efforts to advance interoperability as an essential component for the successful and more seamless integration of intelligent, communicating technologies into the electric power system. This proposed methodology supports the strategic approach to advance interoperability described in the GMLC Interoperability Project’s Interoperability Strategic Vision: Enabling an Interactive Grid. That document proposes engaging an ecosystem of businesses interested in integrating smart technology with the electric power system to develop an interoperability roadmap using a methodical approach. This roadmap methodology is to be applied to technology integration ecosystems (e.g., electric vehicles, photovoltaic inverters, or automated buildings), using tools that measure the state of interoperability today, to identify the gaps and challenges that can be overcome to improve interoperability, and thereby, simplify the integration process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing Resilient Communities: Hardware demonstration of resilience nodes concept

As part of the project “Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment,” funded by the United States (US) Department of Energy’s (DOE) Grid Modernization Laboratory Consortium (GMLC), Sandia National Laboratories (Sandia) is partnering with a variety of government, industry, and university participants to develop and test a framework for community resilience planning focused on modernization of the electric grid. This report provides a summary of the section of the project focused on hardware demonstration of “resilience nodes” concept.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing Resilient Communities: A Consequence-Based Approach for Grid Investment Report Series (Final Report)

As part of the project “Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment,” funded by the United States (US) Department of Energy’s (DOE) Grid Modernization Laboratory Consortium (GMLC), Sandia National Laboratories (Sandia) partnered with a variety of government, industry, and university participants to develop and test a framework for community resilience planning focused on modernization of the electric grid. This report provides a summary of the development, description, and demonstration of the resulting Resilient Community Design Framework.

14 SOLAR ENERGY↗

RADIANCE Executive Summary

Microgrids are gaining attention from organizations and cities because of their potential reliability and resilience benefits, especially in remote geographic areas: Microgrids can provide local power during emergencies, and they can reduce the costs of imported fuel by reducing overall fuel use. But the complexities and novelties of microgrid technologies are often barriers to deployment that require testing and validation to overcome. This report describes the testing, validation, and deployment of microgrid technologies in Cordova, Alaska, completed through the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) project Resilient Alaskan Distribution system Improvements using Automation, Network analysis, Control, and Energy storage (RADIANCE).

ARIES↗

Energy Services Interface: Requirements Document

This energy services interface (ESI) requirements document represents a process step in the path for creating an ESI specification, which will describe the technical characteristics of an ESI. This document outlines the concepts that need to be covered in the ESI specification, such as principal functions of the ESI, grid services communicated through the ESI, and the ESI lifecycle. It provides context for the Department of Energy’s (DOE’s) Grid Modernization Laboratory Consortium (GMLC) to engage industry participants in the development of the ESI specification. To do this, it describes the desired contents of the ESI specification and provides examples of the type of material that needs to be included in it. The purpose of the ESI specification is to define the requirements that are to be addressed in information and communications technology (ICT) interface standards for enabling the integration of a facility containing responsive distributed energy resources (DER facility) to an electric system consistent with the fundamental ESI principles. In this context, a DER facility may consist of a single DER with a communicating controller or may be as complex as a microgrid campus with several buildings and many DERs. The ESI specification is not a technical interface standard, but the requirements in the specification can be used to check that existing, augmented, or new interface standards meet the interoperability requirements of the ESI concept, which is explained further in this document. In this way, the ESI specification can be used to guide standards advancement work in multiple standards development organizations. To explain the scope of the ESI specification, this ESI requirements document provides examples of situations (or illustrative applications) for using an ESI to coordinate DER flexibility for grid operations. These examples originate from foundational work for describing common grid-DER service agreements that are anticipated to be supported using this interface.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sensitivity of Infrastructure Sectors to the Disruption of Commercial Electric Power

Electric power is crucial to the function of other infrastructures, as well as to the stability of the economy and the social order. Disruption of commercial electric power service, even for brief periods of time, can create significant consequences to the function of other sectors, and make living in some environments untenable. This analysis, conducted in 2017 for the United States Department of Energy (DOE) as part of the Grid Modernization Laboratory Consortium (GMLC) Initiative, focuses on describing the function of each of the other infrastructure sectors and subsectors, with an eye towards those elements of these sectors that depend on primary electric power service through the commercial electric power grid. It leverages the experience of Sandia analysts in analyzing historical disruptive events, and from the development of capabilities designed to identify the physical, logical, and geographic connectivity between infrastructures. The analysis goes on to identify alternatives for the provision of primary electric power service, and the redundancy of said alternatives, to provide a picture of the sector’s ability to withstand an extended disruption.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RADIANCE Cybersecurity Plan: Generic Version

Under its Grid Modernization Initiative, the U.S. Department of Energy (DOE), in collaboration with energy industry stakeholders developed a multi-year research plan to support modernizing the electric grid. One of the foundational projects for accelerating modernization efforts is information and communications technology interoperability. A key element of this project has been the development of a methodology for engaging ecosystems related to grid integration to create roadmaps that advance the ease of integration of related smart technology. This document is the product of activities undertaken in 2017 through 2019. It provides a Cybersecurity Plan describing the technology to be adopted in the project with details as per the GMLC Call document.

24 POWER TRANSMISSION AND DISTRIBUTION↗