Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

13 HYDRO ENERGY↗

2D Dam-Break Analysis of L Lake and PAR Pond Dams Using HEC-RAS

In 1991 a dam-break study was conducted for the high hazard dams located at L Lake and PAR Pond on the Savannah River Site. Two scenarios were considered, over topping from a Probable Maximum Flood (PMF), and a fair weather dam-break for either or both dams. Unfortunately, no inundation map was developed from the study. The purpose of this project was to redo the original dam-break study with improved data and methodology to generate Inundation maps to assist with emergency response and evacuation plans. The Hydrologic Engineering Center's River Analysis System (HEC-RAS) is a free to download river analysis modeling program developed by the US Army Corps of Engineers capable of 1D and 2D hydraulic calculations. Version 5.0.7 (released March 2019) was used for this project. Digital elevation models for the area were retrieved from the US Geological Survey database and converted to a .hdf file within the program. Then the 2D flood area was identified from the contours. Both L Lake and PAR Pond were inputted as 1D storage areas because DEM data does not contain elevation values under water bodies. An elevation vs volume curve was available for both storage areas. Initial elevations were set for both scenarios. Both dams are earthen dams. The Steel Creek dam at L Lake has 6 ft diameter conduit with an upper and lower sluice gate. PAR pond dam consist of a weir and sluice gate connected to an 8 x 8 ft channel. Both outlets were modeled with a pool elevation vs discharge curve. The steel creek dam sluice gates were assumed to be fully open in all cases. As in the previous study, the dams were set to breach when they were overtopped by 1.5 ft during PMF conditions (Figure 1). A fair weather breach was set to be due to a piping failure (Figure 1). In the dual dam break during fair weather conditions the PAR pond dam fails 3 hours after Steel Creek to achieve maximum flooding in the down stream reaches. Simulation was run 3 days for each case and with a 1 minute computational interval. Maximum flooding occurs under PMF conditions with the failure of both dams. PAR pond dam fails first 16 hours and 32 minutes after the start of the simulation with the Steel creek dam failing 6 minutes later. In all cases, the bridges and roads spanning Steel Creek and Lower Three Runs will be inundated and potentially washed away. The Burtons Ferry Highway south of the storage areas will be partially flooded during PMF failure, dual fair weather failure, and PAR pond failure under fair weather conditions.

54 ENVIRONMENTAL SCIENCES↗

Hydropower Potential at Non-Powered Dams: A Multi-Criteria Decision Analysis Tool based on Grid, Community, Industry, and Environmental Impacts

Non-powered dams (NPDs) are dams that do not include hydraulic turbine (hydropower) equipment. Currently, there are more than 80,000 such dams in the United States, which provide a variety of non-energy benefits, including flood control, water supply, navigation, and recreation. Approximately 500 of these NPDs are identified as having the potential to add hydropower generation (totaling up to a capacity of more than 8200 MW). A large share of investment costs and environmental impacts of dam construction have already been incurred at these NPDs. Hence, adding power to the existing dam structure is hypothesized to be achieved at a lower cost, with less risk, and a shorter timeframe than the development required for new dam construction. The abundance of NPDs, the associated environmental favorability, and cost advantages, combined with the reliability, predictability, and dispatchability of hydropower, make NPDs a strong candidate in the nation’s renewable energy portfolio. To assess the NPD to hydropower conversion potential, in this study, we developed a GIS-based multi-criterial decision analysis tool, which allows users to rank these NPDs based on the grid, community, industry, and environmental impacts (i.e., GCIE impacts). This web-based interactive tool (developed using open-source Python and JavaScript) lets the user choose from a wide range of features to define each of the GCIE impact scores through a user-friendly graphical user interface. These features are related to dam operation, hydropower generation opportunity, power market economy, social vulnerability and risk, proximity to critical infrastructure and energy generating facilities, environmental concerns (air, water, and critical habitat), and exposure to natural hazards. The overall priority score of NPDs is calculated based on user-defined weights for each of the GCIE impact scores. Besides ranking NPDs, the tool can also be used to estimate the energy-storage feasibility (battery, hydrogen, and pump-storage hydropower) at each of the potential sites.

13 HYDRO ENERGY↗

Use of an autonomous sensor to evaluate the biological performance of the advanced turbine at Wanapum Dam

Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973 . Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission to replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Altogether, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.

13 HYDRO ENERGY↗

Contextualizing Non-Powered Dam Site Selection for Archimedes Screw Turbines: A Methodology for Responsible Archimedes Screw Turbine Conversion at Existing Dams

Non-powered dams represent 97% of dams in the United States and their energy generation potential has not been fully realized. The use of an Archimedes screw turbine to generate power at non-powered dams offers a dual benefit; producing electricity, and acting as downstream fish passage, helping to reconnect previously separated ecosystems. In this study, we assess the technical, environmental, social, and economic feasibility of generating power at non-powered U.S. dam sites using Archimedes screw turbines by integrating mechanical constraints, social impact metrics, proximity to infrastructure, and environmental sensitivity data. Results account for future precipitation predictions and show, between 2024 and 2050, the number of sites where Archimedes screw turbines are viable decreases by one site, but overall generation capacity increases due to increased flow rates across persisting locations. Our analysis identified 82 non-powered dam sites with a mean generation capacity of 49 kW that meet the mechanical requirements for Archimedes screw turbine technology in 2024. Our analysis presents a framework for considering social, environmental, and economic impacts of specific turbine technologies to convert non-powered dams to generate power.

Archimedes screw turbine↗

HydroFish: freshwater fish co-occurrence with hydropower plants and non-powered dams in conterminous United States sub-basins

The HydroFish dataset lists all existing hydropower plants (EHAs) and non-powered dams (NPDs; ≥ 0.001 MW potential nominal capacity), delineates the hydrologic sub-basins in which they are situated, and then lists all freshwater fish species reported to occur in those sub-basins. This dataset was compiled using the HydroBio dataset (https://hydrosource.ornl.gov/data/datasets/hydrobio/) and contains 24 total variables that describe hydrologic sub-basins, each unique EHA (plant ID and name, geographic coordinates, permit type, capacity, etc.) and NPD (ID value, known names, geographic coordinates, and estimated potential nominal capacity), and freshwater fish species in the sub-basin (common and scientific name, origin, and migratory and threat status). The HydroBio dataset was built using Oak Ridge National Laboratory’s Existing Hydropower Assets Dataset (2024 version) and Non-powered Dam Technical Potential Dataset (2024 version), and NatureServe’s fish species distribution dataset (2023 version). The dataset also contains summary variables that report the unique number of EHAs, NPDs, and freshwater fish species per sub-basin. The HydroFish dataset contains two unique data files: 1) a .csv metadata file describing the dataset variables, and 2) a .csv data file containing the actual dataset. Note that there may be many rows per unique existing hydropower plant or non-powered dam given that distinct species are listed per existing plant or NPD per sub-basin. The dataset is downloadable as a zip file containing the metadata and dataset files.

Bozeman, Bryan [Oak Ridge National Laboratory (ORN↗

VotE-Dams: a compilation of global dams' locations and attributes (v1)

This dataset represents a compilation of two global and three USA-specific datasets of dam locations and their attributes. The major hurdle toward developing this compilation was the identification of duplicates within the source datasets, especially given the variable precision of dam location coordinates. The most immediately-useful product in this dataset is a spreadsheet (VotE-Dams_v1.csv) that documents the unique dams found across the datasets, their coordinates, and their ids within the respective source datasets. We do not reproduce the source datasets (GRaND, GOODD, GeoDAR, NID, and EHA) here, but their download locations are provided in the README files ('Overview' tab). Some of the source datasets are provided as shapefiles, which require geospatial data software to open (e.g. QGIS/ArcGIS for graphical display, geopandas for Python, rgdal for R, many others freely available). The provided README documents metadata of the source datasets and provides attribute-linking information (i.e. matches attributes among various source datasets that contain the same, or similar, information but have different names). Note that the README is provided as both .xslx and a collection of .csvs (one per tab in the .xslx file). We suggest using the .xlsx version that preserves images, formatting, and sheets. .xlsx files can be viewed using (free) Google Docs or Microsoft Excel.Finally, we provide Technical Documentation.pdf that describes the procedures used to identify unique and duplicate dams.The title of this dataset refers to our 'Veins of the Earth' (VotE) project, which seeks to provide a flexible, scale-free representation of the Earth's river networks. Dams are a critical component of VotE as they heavily influence flows throughout river networks.

54 ENVIRONMENTAL SCIENCES↗

Patterns, drivers, and a predictive model of dam removal cost in the United States

Given the burgeoning dam removal movement and the large number of dams approaching obsolescence in the United States, cost estimating data and tools are needed for dam removal prioritization, planning, and execution. We used the list of removed dams compiled by American Rivers to search for publicly available reported costs for dam removal projects. Total cost information could include component costs related to project planning, dam deconstruction, monitoring, and several categories of mitigation activities. We compiled reported costs from 455 unique sources for 668 dams removed in the United States from 1965 to 2020. The dam removals occurred within 571 unique projects involving 1–18 dams. When adjusted for inflation into 2020 USD, cost of these projects totaled $\$1.522$ billion, with per-dam costs ranging from $\$1$ thousand (k) to $\$268.8$ million (M). The median cost for dam removals was $\$157$k, $\$823$k, and $\$6.2$M for dams that were< 5 m, between 5–10 m, and > 10 m in height, respectively. Geographic differences in total costs showed that northern states in general, and the Pacific Northwest in particular, spent the most on dam removal. The Midwest and the Northeast spent proportionally more on removal of dams less than 5 m in height, whereas the Northwest and Southwest spent the most on larger dam removals > 10 m tall. We used stochastic gradient boosting with quantile regression to model dam removal cost against potential predictor variables including dam characteristics (dam height and material), hydrography (average annual discharge and drainage area), project complexity (inferred from construction and sediment management, mitigation, and post-removal cost drivers), and geographic region. Dam height, annual average discharge at the dam site, and project complexity were the predominant drivers of removal cost. The final model had an R 2 of 57% and when applied to a test dataset model predictions had a root mean squared error of $\$5.09$M and a mean absolute error of $\$1.45$M, indicating its potential utility to predict estimated costs of dam removal. We developed a R shiny application for estimating dam removal costs using customized model inputs for exploratory analyses and potential dam removal planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MORPHODYNAMIC MODELING OF FLOW AND SEDIMENT TRANSPORT OVER LOW-HEAD, RUN-OF-RIVER DAMS

Low-head or Run-of-River (RoR) dams exist on all types of rivers throughout the United States, yet the exact mechanisms of how sediment moves around the structures have not been well researched. Due to the increasing use of RoR dams in small hydroelectric projects, there is a need to better understand the controlling factors of how sediment passes over these dams. A one-dimensional morphodynamic model was developed to investigate the effects of RoR dams on channel morphology over long time scales. The model solves the gradually varied flow equations to compute the flow field in the vicinity of the dam, computes grain-size-specific sediment transport rates, and uses sediment mass conservation and vertical storage bookkeeping to calculate the evolution of bed elevation, the bed surface grain-size distribution, and the vertical pattern of stratigraphy. The model’s hydraulic calculations were calibrated using data collected from a series of flume experiments performed with a model RoR dam to better capture the non-hydrostatic flow over a dam. Numerical experiments designed to investigate how the grain-size distribution of the sediment supply rate, flow rate (steady and unsteady), and dam height act as controls on sediment passage over RoR dams were conducted using parameters reported in the literature for a RoR dam in northern Delaware.These one-dimensional simulations were complemented with a few simulations using, a two-dimensional morphodynamic model, Nays2DH. The 1D simulation results show that the stored sediment upstream of RoR dams does depend on the sediment supply, dam height, grain-size and flow discharge. Once sedimentation in the reservoir has reached equilibrium, high flow events will reduce or scour the sediment while lower flows will typically increase the amount of sediment behind the dam. Finally, a dam that stores more sediment will have greater downstream effects in terms of changes to grain-sizes and bed elevation due to the increased time it ii takes to pass sediment over the dam and reach an equilibrium condition on the upstream side of the dam.

13 HYDRO ENERGY↗

Vulnerability of Karangkates dams area by means of zero crossing analysis of data magnetic

Study with entitled Vulnerability Karangkates Dam Area By Means of Zero Crossing Analysis of Data Magnetic has been done. The study was aimed to obtain information on the vulnerability of two parts area of Karangkates dams, i.e. Lahor dam which was inaugurated in 1977 and Sutami dam inaugurated in 1981. Three important things reasons for this study are: 1). The dam age was 36 years old for Lahor dam and 32 years old for Sutami dam, 2). Geologically, the location of the dams are closed together to the Pohgajih local shear fault, Selorejo local fault, and Selorejo limestone-andesite rocks contact plane, and 3). Karangkates dams is one of the important Hydro Power Plant PLTA with the generating power of about 400 million KWH per year from a total of about 29.373MW installed in Indonesia. Geographically, the magnetic data acquisition was conducted at coordinates (112.4149oE;-8.2028oS) to (112.4839oE;-8.0989oS) by using Proton Precession Magnetometer G-856. Magnetic Data acquisition was conducted in the radial direction from the dams with diameter of about 10 km and the distance between the measurements about 500m. The magnetic data acquisition obtained the distribution of total magnetic field value in the range of 45800 nT to 44450 nT. Residual anomalies obtained by doing some corrections, including diurnal correction, International Geomagnetic Reference Field (IGRF) correction, and reductions so carried out the distribution of the total magnetic field value in the range of -650 nT to 700 nT. Based on the residual anomalies, indicate the presence of 2 zones of closed closures dipole pairs at located in the west of the Sutami dam and the northwest of the Lahor dam from 5 total zones. Overlapping on the local geological map indicated the lineament of zero crossing patterns in the contour of residual anomaly contour with the Pohgajih shear fault where located at about 4 km to the west of the Sutami dam approximately and andesite-limestone rocks contact where located at about 6 km to the west of the Lahor dam approximately. These shown a possible of vulnerability on geohazards at the west zone of the Karangkates (Lahor-Sutami) dams area if there are triggers by the vibration (earthquake) on the Pohgajih shear fault, andesite-limestone contact plane, and instability rocks on two zones of closed closure dipole pairs area. Reality, on the location of the study shown some local landslide at the several locations and the main road that need considering for disaster mitigation.

58 GEOSCIENCES↗

An Assessment of Energy Potential at Non-Powered Dams in the United States

The United States has produced clean, renewable electricity from hydropower for more than 100 years, but hydropower-producing facilities represent only a fraction of the infrastructure development that has taken place on the nation’s waterways. In contrast to the roughly 2,500 dams that provide 78 gigawatts (GW) 1 of conventional and 22 GW of pumped-storage hydropower, the United States has more than 80,000 non-powered dams (NPDs)—dams that do not produce electricity—providing a variety of services ranging from water supply to inland navigation. Importantly, many of the monetary costs and environmental impacts of dam construction have already been incurred at NPDs, so adding power to the existing dam structure can often be achieved at lower cost, with less risk, and in a shorter timeframe than development requiring new dam construction. The abundance, cost, and environmental favorability of NPDs, combined with the reliability and predictability of hydropower, make these dams a highly attractive source for expanding the nation’s renewable energy supply. To better characterize this unique national resource, the U.S. Department of Energy (DOE) Wind and Water Power Program has undertaken a national-scale analysis of U.S. dams to determine the ability of NPDs to provide hydroelectric power. DOE’s Oak Ridge National Laboratory (ORNL), with input from DOE’s Idaho National Laboratory, quantified the potential capacity and generation available from adding power production capability to U.S. NPDs. Of the more than 80,000 NPDs throughout the U.S., 54,391 dams were analyzed, with remaining dams eliminated from consideration due to erroneous geographic information, or erroneous flow or drainage area attributes that could not be resolved and corrected through independent investigation of maps and records. Anecdotal information suggests that these dams with missing or erroneous information are likely to be relatively small or have low potential to produce hydroelectric energy. Dams with a reported height of less than five feet were also excluded from analysis. A thorough quality control and review process ensured that the 54,391 remaining NPDs were analyzed and characterized as accurately as possible. Figure ES-1 demonstrates the spatial and capacity potential distribution of the nation’s NPDs. Electric generating capacities included in the report were calculated using the assumption that all water passing a facility would be available for conversion into electrical energy and that hydraulic head at the facility would remain constant. The analysis did not consider the economic feasibility of developing each unpowered facility. The assessment provides preliminary information for stakeholders (such as developers, municipal planners, and policymakers), who can further evaluate the potential to increase hydropower production at NPD sites. Developers could use the information provided in this assessment to focus on more detailed analysis of sites that demonstrate a reasonable potential for being developed. Adding power to U.S. NPDs has the potential to add up to 12 GW (12,000 megawatts or MW) of new renewable capacity—a potential equivalent to increasing the size of the existing conventional hydropower fleet by 15%. A majority of this potential is concentrated in just 100 NPDs, which could contribute approximately 8 GW of clean, reliable hydropower; the top 10 facilities alone could add up to 3 GW of new hydropower. Eighty-one of the 100 top NPDs are U.S. Army Corps of Engineers (USACE) facilities, many of which, including all of the top 10, are navigation locks on the Ohio River, Mississippi River, Alabama River, and Arkansas River, as well as their major tributaries. This study also shows that dams owned by the U.S. Bureau of Reclamation hold the potential to add approximately 260 MW of capacity; the Bureau has also engaged in an effort to conduct a more detailed evaluation of its own facilities.

13 HYDRO ENERGY↗

Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012

The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two spill conditions were to be systematically performed in alternating 2-day test intervals over the course of the spring outmigration. High flow conditions in 2012 interrupted the spill study. Dam passage survival was therefore estimated season-wide regardless of spill conditions.

Skalski, J. R.↗

Evaluation of the Biological Effects of the Northwest Power Conservation Council's Mainstem Amendment on the Fisheries Upstream and Downstream of Libby Dam, Montana, 2007-2008 Annual Report.

A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidly discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.

13 HYDRO ENERGY↗