COST-OPTIMIZING MULTISTAGE ROCKETS

Cost-optimization method for the selection of the booster system and its optimum rocket sizes, based on the economics of achieving the mission

MULTISTAGE ROCKET VEHICLE↗

Cost Optimization and Technology Enablement COTSAT-1

Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) is an ongoing spacecraft research and development project at NASA Ames Research Center (ARC). The space industry was a hot bed of innovation and development at its birth. Many new technologies were developed for and first demonstrated in space. In the recent past this trend has reversed with most of the new technology funding and research being driven by the private industry. Most of the recent advances in spaceflight hardware have come from the cell phone industry with a lag of about 10 to 15 years from lab demonstration to in space usage. NASA has started a project designed to address this problem. The prototype spacecraft known as Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) and CheapSat work to reduce these issues. This paper highlights the approach taken by NASA Ames Research center to achieve significant subsystem cost reductions. The COSTAT-1 research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing spacecraft. The COTSAT-1 team demonstrated building a fully functional spacecraft for $500K parts and $2.0M labor. The COTSAT-1 system, including a selected science payload, is described within this paper. Many of the advancements identified in the process of cost reduction can be attributed to the use of a one-atmosphere pressurized structure to house the spacecraft components. By using COTS hardware, the spacecraft program can utilize investments already made by commercial vendors. This ambitious project development philosophy/cycle has yielded the COTSAT-1 flight hardware. This paper highlights the advancements of the COTSAT-1 spacecraft leading to the delivery of the current flight hardware that is now located at NASA Ames Research Center. This paper also addresses the plans for COTSAT-2.

Spremo, Stevan↗

Thermoelectric System Economics - The Apex: New Paradigms in Manufacturing and Interface Performance Relationships Driving System Cost Optimizations

Thermoelectric energy recovery systems require cost-optimized designs with high thermal and thermoelectric (TE) performance to surmount common commercialization barriers controlling the acceptance of thermoelectric generator (TEG) systems. Recent work has addressed this requirement with new analytic tools and paradigms that allow integrated TEG cost-performance analysis and optimization. New work herein has identified the existence of optimized TE element design (i.e., TE element length) for minimizing TEG cost and provides design guidelines associated with critical thermal and electrical contact resistance effects and TE manufacturing sensitivities. Once optimum hot-side heat flux criteria are satisfied, this work highlights the tradeoffs between interface resistance effects and manufacturing cost effects in determining optimum-cost TE element lengths, and then quantifies the increase in optimum-cost TE lengths as manufacturing costs become more sensitive to TE element lengths. Optimized TE element design criteria and key non-dimensional design parameters (i.e., [𝐶′′′LTE/𝐶′′], [TE/con], [con/(TE,aveLTE)]) driving the design are presented and explained showing the interdependencies between manufacturing cost parameters and thermal and electrical interface impacts on integrated TE cost-performance analysis and design. Comprehensive TEG system cost-performance relationships clearly demonstrate the two parameters that most greatly impact the TEG system cost are heat exchanger costs ($/(W/K)) and TE hot side heat flux. Reducing heat exhanger cost from $1/(W/K) to $0.5/(W/K) can decrease TEG system cost by $2/W to $4/W depending on TE hot side heat fluxes from 4-10 W/cm2. The impact of TE hot side heat flux on TEG system cost is larger; reducing TE system cost by factors of 2-4 as TE hot side heat flux increases from 4 W/cm2 to high levels around 18 W/cm2. The levels of thermal contact resistance and electrical contact resistance required to even approach the critical TEG system cost level of $1/W are characterized by con = 1.0 x 10-10 -m2 and r = 0.1, respectively. This not only lowers TEG costs, but it also makes the TEG system costs less sensitive to TE manufacturing dependences on TE element length. New design paradigms and relationships create holistic, integrated TE performance-cost models that enhance understanding of crucial interrelationships between component costs, TE design parameters and material properties, heat exchanger design parameters, interfacial heat flux, and now thermal and electrical interface effects in minimizing TEG system costs.

Hendricks, Terry J.↗

COTSAT Small Spacecraft Cost Optimization for Government and Commercial Use

Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) is an ongoing spacecraft research and development project at NASA Ames Research Center (ARC). The prototype spacecraft, also known as CheapSat, is the first of what could potentially be a series of rapidly produced low-cost spacecraft. The COTSAT-1 team is committed to realizing the challenging goal of building a fully functional spacecraft for $500K parts and $2.0M labor. The project's efforts have resulted in significant accomplishments within the scope of a limited budget and schedule. Completion and delivery of the flight hardware to the Engineering Directorate at NASA Ames occurred in February 2009 and a cost effective qualification program is currently under study. The COTSAT-1 spacecraft is now located at NASA Ames Research Center and is awaiting a cost effective launch opportunity. This paper highlights the advancements of the COTSAT-1 spacecraft cost reduction techniques.

Swank, Aaron J.↗

International standards for cost-optimized space missions and infrastructure

The establishment of international standards is essential for the success of multiagency space missions. Here, two key areas for international standardization are proposed: the development of standards for infrastructure and the development of multiagency standards. Such standards will ultimately enable cost-optimized small missions as well as a cost-optimized superset of space infractructures.

Mckenzie, Merle↗

Messaging with Cost-Optimized Interstellar Beacons

On Earth, how would we build galactic-scale beacons to attract the attention of extraterrestrials, as some have suggested we should do? From the point of view of expense to a builder on Earth, experience shows an optimum trade-off. This emerges by minimizing the cost of producing a desired power density at long range, which determines the maximum range of detectability of a transmitted signal. We derive general relations for cost-optimal aperture and power. For linear dependence of capital cost on transmitter power and antenna area, minimum capital cost occurs when the cost is equally divided between antenna gain and radiated power. For nonlinear power-law dependence, a similar simple division occurs. This is validated in cost data for many systems; industry uses this cost optimum as a rule of thumb. Costs of pulsed cost-efficient transmitters are estimated from these relations by using current cost parameters ($/W, $/sq m) as a basis. We show the scaling and give examples of such beacons. Galactic-scale beacons can be built for a few billion dollars with our present technology. Such beacons have narrow "searchlight" beams and short "dwell times" when the beacon would be seen by an alien observer in their sky. More-powerful beacons are more efficient and have economies of scale: cost scales only linearly with range R, not as R(exp 2), so number of stars radiated to increases as the square of cost. On a cost basis, they will likely transmit at higher microwave frequencies, -10 GHz. The natural corridor to broadcast is along the galactic radius or along the local spiral galactic arm we are in. A companion paper asks "If someone like us were to produce a beacon, how should we look for it?"

Benford, James↗

Cost optimization of spacecraft test levels

Common to all nondestructive type testing of hardware that provides the necessary confidence in the design is the question regarding the proper magnitude of the test level. The objective of this investigation was to study the possibility of establishing cost optimized test levels of a rather general nature. This investigation was based on studying the influence of test level on a cost of error cost model that reflects the adverse effects of 'undertesting' and 'overtesting'. For the assumed conditions of normal distribution for the random variables and a protoflight spacecraft case, the results indicated that the limits for an optimum test factor can range between slightly less than 1.0 to slightly more than 1.5.

Young, J. P.↗

On the determination of optimal costly measurement strategies for linear stochastic systems.

This paper presents the formulation of a class of optimization problems dealing with selecting, at each instant of time, one measurement provided by one out of many sensors. Each measurement has an associated measurement cost. The basic problem is then to select an optimal measurement policy, during a specified observation time interval, so that a weighted combination of prediction accuracy and accumulated observation cost is optimized. The current analysis is limited to the class of linear stochastic dynamic systems and measurement subsystems. The problem of selecting the optimal measurement strategy can be transformed into a deterministic optimal control problem. It is shown that the optimal measurement policy and the associated matched Kalman-type filter can be precomputed.

Athans, M.↗

Cost optimization in low volume VLSI circuits

The relationship of integrated circuit (IC) cost to electronic system cost is developed using models for integrated circuit cost which are based on design/fabrication approach. Emphasis is on understanding the relationship between cost and volume for custom circuits suitable for NASA applications. In this report, reliability is a major consideration in the models developed. Results are given for several typical IC designs using off the shelf, full custom, and semicustom IC's with single and double level metallization.

Cook, K. B., Jr.↗

Searching for Cost-Optimized Interstellar Beacons

What would SETI beacon transmitters be like if built by civilizations that had a variety of motives but cared about cost? In a companion paper, we presented how, for fixed power density in the far field, a cost-optimum interstellar beacon system could be built. Here, we consider how we should search for a beacon if it were produced by a civilization similar to ours. High-power transmitters could be built for a wide variety of motives other than the need for two-way communication, this would include beacons built to be seen over thousands of light-years. Extraterrestrial beacon builders would likely have to contend with economic pressures just as their terrestrial counterparts do. Cost, spectral lines near 1GHz, and interstellar scintillation favor radiating frequencies substantially above the classic "water hole." Therefore, the transmission strategy for a distant, cost-conscious beacon would be a rapid scan of the galactic plane with the intent to cover the angular space. Such pulses would be infrequent events for the receiver. Such beacons built by distant, advanced, wealthy societies would have very different characteristics from what SETI researchers seek. Future searches should pay special attention to areas along the galactic disk where SETI searches have seen coherent signals that have not recurred on the limited listening time intervals we have used. We will need to wait for recurring events that may arrive in intermittent bursts. Several new SETI search strategies have emerged from these ideas. We propose a new test for beacons that is based on the Life Plane hypotheses.

Benford, Gregory↗

Structural cost optimization of photovoltaic central power station modules and support structure

The results of a comprehensive study of photovoltaic module structural support concepts for photovoltaic central power stations and their associated costs are presented. The objective of the study has been the identification of structural cost drivers. Parametric structural design and cost analyses of complete array systems consisting of modules, primary support structures, and foundations were performed. Area related module cost was found to be constant with design, size, and loading. A curved glass module concept was evaluated and found to have the potential to significantly reduce panel structural costs. Conclusions of the study are: array costs do not vary greatly among the designs evaluated; panel and array costs are strongly dependent on design loading; and the best support configuration is load dependent

Sutton, P. D.↗

Teleconferencing: Cost optimization of satellite and ground systems for continuing progressional education and medical services

A set of analytical capabilities that are needed to assess the role satellite communications technology will play in public and other services was developed. It is user oriented in that it starts from descriptions of user demand and develops the ability to estimate the cost of satisfying that demand with the lowest cost communications system. To ensure that the analysis could cope with the complexities of the real users, two services were chosen as examples, continuing professional education and medical services. Telecommunications costs are effected greatly by demographic factors, involving distribution of users in urban areas and distances between towns in rural regions. For this reason the analytical tools were exercised on sample locations. San Jose, California and Denver, Colorado were used to represent an urban area and the Rocky Mountain states were used to represent a rural region. In assessing the range of satellite system costs, two example coverage areas were considered, one appropriate to cover the contiguous forty-eight states, a second appropriate to cover about one-third that area.

Dunn, D.↗

Need for Cost Optimization of Space Life Support Systems

As the nation plans manned missions that go far beyond Earth orbit to Mars, there is an urgent need for a robust, disciplined systems engineering methodology that can identify an optimized Environmental Control and Life Support (ECLSS) architecture for long duration deep space missions. But unlike the previously used Equivalent System Mass (ESM), the method must be inclusive of all driving parameters and emphasize the economic analysis of life support system design. The key parameter for this analysis is Life Cycle Cost (LCC). LCC takes into account the cost for development and qualification of the system, launch costs, operational costs, maintenance costs and all other relevant and associated costs. Additionally, an effective methodology must consider system technical performance, safety, reliability, maintainability, crew time, and other factors that could affect the overall merit of the life support system.

Costs↗