Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.

Uncertainties that flight crews and dispatchers must consider when calculating the fuel needed for a flight

In 1993, fuel accounted for approximately 15 percent of an airline's expenses. Fuel consumption increases as fuel reserves increase because of the added weight to the aircraft. Calculating fuel reserves is a function of Federal Aviation Regulations, airline company policy, and factors that impact or are impacted by fuel usage enroute. This research studied how pilots and dispatchers determined the fuel needed for a flight and identified areas where improvements in methods may yield measurable fuel savings by (1) listing the uncertainties that contribute to adding contingency fuel, (2) obtaining the pilots' and dispatchers' perspective on how often each uncertainty occurred, and (3) obtaining pilots' and dispatchers' perspective on the fuel used for each occurrence. This study found that for the majority of the time, pilots felt that dispatchers included enough fuel. As for the uncertainties that flight crews and dispatchers account for, air traffic control accounts for 28% and weather uncertainties account for 58 percent. If improvements can be made in these two areas, a great potential exists to decrease the reserve required, and therefore, fuel usage without jeopardizing safety.

Trujillo, Anna C.

A microeconomic scheduler for parallel computers

We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

Stoica, Ion

SCDM in a Distributed Environment

The Software Configuration Management (SCM) of the Space Launch Initiative (SLI) Advanced Engineering Environment (AEE) products is performed in a distributed environment-meaning the activities performed during the project lifecycle are across numerous NASA Centers, facilities, organizations, colleges and industry. SCM is the glue that holds the project and products together-especially in a distributed environment. It identifies, controls, accounts, and verified the details of the products; the schedule of activities; the assigned responsibilities; and the required resources, including staff, tools, and computer facilities. Data/document management (DM) captures and conveys the SCM and project efforts. SCM and DM are integrally linked; hence, Software Configuration and Data Management (SCDM). This paper discusses one team's challenges in implementing SCDM in a distributed environment. The distributed nature of the project introduces new opportunities for moving SCDM to the next level of usefulness in today's high-tech development arena. The lessons learned from the implementation of distributed SCDM in support of the SLI AEE Project provide valuable information for future implementations of SCM and DM.

Crowley, Sandra L.

NASA/Navy Benchmarking Exchange (NNBE). Volume 1. Interim Report. Navy Submarine Program Safety Assurance

The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.

SUBSAFE PROGRAM

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

IBR

Storage Information Management System (SIMS) Spaceflight Hardware Warehousing at Goddard Space Flight Center

Goddard Space Flight Center (GSFC) on site and leased warehouses contain thousands of items of ground support equipment (GSE) and flight hardware including spacecraft, scaffolding, computer racks, stands, holding fixtures, test equipment, spares, etc. The control of these warehouses, and the management, accountability, and control of the items within them, is accomplished by the Logistics Management Division. To facilitate this management and tracking effort, the Logistics and Transportation Management Branch, is developing a system to provide warehouse personnel, property owners, and managers with storage and inventory information. This paper will describe that PC-based system and address how it will improve GSFC warehouse and storage management.

Kubicko, Richard M.

Data acquisition and processing history for the Explorer 33 (AIMP-D) satellite

The quality control monitoring system, using accounting and quality control data bases, made it possible to perform an in-depth analysis. Results show that the percentage of useable data files for experimenter analysis was 97.7%; only 0.4% of the data sequences supplied to the experimenter exhibited missing data. The 50 percentile probability delay values (referenced to station record data) indicate that the analog tapes arrived within 11 days, the data were digitized within 4.2 weeks, and the experimenter tapes were delivered in 8.95 weeks or less.

Karras, T. J.

A modified approach to controller partitioning

The idea of computing a decentralized control law for the integrated flight/propulsion control of an aircraft by partitioning a given centralized controller is investigated. An existing controller partitioning methodology is described, and a modified approach is proposed with the objective of simplifying the associated controller approximation problem. Under the existing approach, the decentralized control structure is a variable in the partitioning process; by contrast, the modified approach assumes that the structure is fixed a priori. Hence, the centralized controller design may take the decentralized control structure into account. Specifically, the centralized controller may be designed to include all the same inputs and outputs as the decentralized controller; then, the two controllers may be compared directly, simplifying the partitioning process considerably. Following the modified approach, a centralized controller is designed for an example aircraft mode. The design includes all the inputs and outputs to be used in a specified decentralized control structure. However, it is shown that the resulting centralized controller is not well suited for approximation by a decentralized controller of the given structure. The results indicate that it is not practical in general to cast the controller partitioning problem as a direct controller approximation problem.

Garg, Sanjay

A Second Law Based Unstructured Finite Volume Procedure for Generalized Flow Simulation

An unstructured finite volume procedure has been developed for steady and transient thermo-fluid dynamic analysis of fluid systems and components. The procedure is applicable for a flow network consisting of pipes and various fittings where flow is assumed to be one dimensional. It can also be used to simulate flow in a component by modeling a multi-dimensional flow using the same numerical scheme. The flow domain is discretized into a number of interconnected control volumes located arbitrarily in space. The conservation equations for each control volume account for the transport of mass, momentum and entropy from the neighboring control volumes. In addition, they also include the sources of each conserved variable and time dependent terms. The source term of entropy equation contains entropy generation due to heat transfer and fluid friction. Thermodynamic properties are computed from the equation of state of a real fluid. The system of equations is solved by a hybrid numerical method which is a combination of simultaneous Newton-Raphson and successive substitution schemes. The paper also describes the application and verification of the procedure by comparing its predictions with the analytical and numerical solution of several benchmark problems.

Majumdar, Alok

Flight Validation of a Metrics Driven L(sub 1) Adaptive Control

The paper addresses initial steps involved in the development and flight implementation of new metrics driven L1 adaptive flight control system. The work concentrates on (i) definition of appropriate control driven metrics that account for the control surface failures; (ii) tailoring recently developed L1 adaptive controller to the design of adaptive flight control systems that explicitly address these metrics in the presence of control surface failures and dynamic changes under adverse flight conditions; (iii) development of a flight control system for implementation of the resulting algorithms onboard of small UAV; and (iv) conducting a comprehensive flight test program that demonstrates performance of the developed adaptive control algorithms in the presence of failures. As the initial milestone the paper concentrates on the adaptive flight system setup and initial efforts addressing the ability of a commercial off-the-shelf AP with and without adaptive augmentation to recover from control surface failures.

Dobrokhodov, Vladimir

Method for neural network control of motion using real-time environmental feedback

A method of motion control for robotics and other automatically controlled machinery using a neural network controller with real-time environmental feedback. The method is illustrated with a two-finger robotic hand having proximity sensors and force sensors that provide environmental feedback signals. The neural network controller is taught to control the robotic hand through training sets using back- propagation methods. The training sets are created by recording the control signals and the feedback signal as the robotic hand or a simulation of the robotic hand is moved through a representative grasping motion. The data recorded is divided into discrete increments of time and the feedback data is shifted out of phase with the control signal data so that the feedback signal data lag one time increment behind the control signal data. The modified data is presented to the neural network controller as a training set. The time lag introduced into the data allows the neural network controller to account for the temporal component of the robotic motion. Thus trained, the neural network controlled robotic hand is able to grasp a wide variety of different objects by generalizing from the training sets.

Buckley, Theresa M.

Effects of Hypergravity Rearing on Growth Hormone (GH) Secretion In Preweanling Rats

We previously reported that rat pups reared at 1.5-g, 1.75 or 2.0-g hypergravity weigh 6-15% less than 1.0-g controls. To account for these findings. we measured the lactational hormones, prolaction (Prl) and oxytocin (OT), in the pups' mothers. Gravity related differences in Prl were not observed whereas OT of lactating dams was significantly reduced relative to controls. Milk transfer from dam to pup was not impaired in hypergravity-reared litters tested at 1-g. Together, these findings suggest that impaired lactation and milk transfer do not account for reduced body masses of postnatal rats reared in hypergravity. In the present study, we analyzed growth hormone (GH) secretion and maternal licking in pups reared in hypergravity and in 1.0-g controls. Recent reports using dwarfing phenotypes in mouse mutants have provided evidence for postnatal dependence on GH and insulin-like growth factors (IGFs). Beginning on Gestational day (G)11 of the rats' 22 day pregnancy, rat dams and their litters were exposed to either 1.5-g, 1.75-g or 2.0-g. On Postnatal day (P)10, we measured plasma GH using enzyme immunoassay (EIA). Contrary to our hypothesis, GH was significantly elevated in pups reared at 2.0-g relative to 1.0-g controls. Pup-oriented behaviors of the hypergravity dams were also changed, possibly accounting for the increase in pup GH. GH alone does not appear to play a role in reduced body weights of hypergravity-reared pups.

Baer, L. A.

Symmetric linear systems

Employment as a means of transportation in the civilian construction trades represents one of the many applications of the helicopter. However, a major limitation to its use in heavy construction has been that the mass which can be effectively and safely transported is severely restricted. The construction of the so-called 'heavy lift' helicopter provided one solution to this problem. But it has been found that there are physical and economic limitations to the payload which can be transported. The proposal has been made to overcome these limitations by making use of multiple helicopters to move a single mass. A study of the feasibility of this proposal showed that automatic control would be needed to make the concept successful. The present investigation is concerned with some initial models in regard to the twinlift problem, taking into account the control theoretic problems.

Lewis, J.