Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Conference planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

ISY Mission to Planet Earth Conference: A planning meeting for the International Space Year

A major theme was the opportunity offered by the International Space Year (ISY) to initiate a long-term program of Earth observation mission coordination and worldwide data standardization. The challenge is immense and extremely time critical. A recommendation was made to inventory the capabilities of Earth observing spacecraft scheduled during the next decade. The ISY effort to strengthen coordination and standardization should emphasize global issues, and also regional initiatives of particular relevance to developing nations. The concepts of a Global Information System Test (GIST) was accepted and applied to specific issues of immediate concern. The importance of ISY Earth observation initiatives extending beyond research to include immediate and direct applications for social and economic development was stressed. Several specific Mission to Planet Earth proposals were developed during the Conference. A mechanism was set up for coordinating participation of the national space agencies or equivalent bodies.

Meyerson, Harvey

Impact of the 1985 Space World Administrative Radio Conference on frequency/orbit planning and use

The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (Consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.

Miller, E. F.

Impact of the 1985 space World Administrative Radio Conference on frequency/orbit planning and use

The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts: (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.

Miller, E. F.

Summer High School Apprenticeship Research Program (SHARP)

The summer of 1997 will not only be noted by NASA for the mission to Mars by the Pathfinder but also for the 179 brilliant apprentices that participated in the SHARP Program. Apprentice participation increased 17% over last year's total of 153 participants. As indicated by the End-of-the-Program Evaluations, 96% of the programs' participants rated the summer experience from very good to excellent. The SHARP Management Team began the year by meeting in Cocoa Beach, Florida for the annual SHARP Planning Conference. Participants strengthened their Education Division Computer Aided Tracking System (EDCATS) skills, toured the world-renowned Kennedy Space Center, and took a journey into space during the Alien Encounter Exercise. The participants returned to their Centers with the same goals and objectives in mind. The 1997 SHARP Program goals were: (1) Utilize NASA's mission, unique facilities and specialized workforce to provide exposure, education, and enrichment experiences to expand participants' career horizons and inspire excellence in formal education and lifelong learning. (2) Develop and implement innovative education reform initiatives which support NASA's Education Strategic Plan and national education goals. (3) Utilize established statistical indicators to measure the effectiveness of SHARP's program goals. (4) Explore new recruiting methods which target the student population for which SHARP was specifically designed. (5) Increase the number of participants in the program. All of the SHARP Coordinators reported that the goals and objectives for the overall program as well as their individual program goals were achieved. Some of the goals and objectives for the Centers were: (1) To increase the students' awareness of science, mathematics, engineering, and computer technology; (2) To provide students with the opportunity to broaden their career objectives; and (3) To expose students to a variety of enrichment activities. Most of the Center goals and objectives were consistent with the overall program goals. Modem Technology Systems, Inc., was able to meet the SHARP Apprentices, Coordinators and Mentors during their site visits to Stennis Space Center, Ames Research Center and Dryden Flight Research Center. All three Centers had very efficient programs and adhered to SHARP's general guidelines and procedures. MTSI was able to meet the apprentices from the other Centers via satellite in July during the SHARP Video-Teleconference(ViTS). The ViTS offered the apprentices and the NASA and SHARP Coordinators the opportunity to introduce themselves. The apprentices from each Center presented topical "Cutting Edge Projects". Some of the accomplishments for the 1997 SHARP Program year included: MTSI hiring apprentices from four of the nine NASA Centers, the full utilization of the EDCATS by apprentices and NASA/SHARP Coordinators, the distribution of the SHARP Apprentice College and Scholarship Directory, a reunion with former apprentices from Langley Research Center and the development of a SHARP Recruitment Poster. MTSI developed another exciting newsletter containing graphics and articles submitted by the apprentices and the SHARP Management Team.

Source record

String Data 2023 (Conference)

The annual String Data conferences have become the flagship annual meeting for the subfield at the interface of formal high energy theory, pure mathematics, and machine learning. String Data 2023 featured invited plenary talks by leading researchers in addition to a parallel session. The funds helped mitigate conference planning and provided support to young researchers.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Utilizing a TDRS satellite for direct broadcast satellite-radio propagation experiments and demonstrations

The NASA/VOA Direct Broadcast Satellite-Radio (DBS-R) Program will be using a NASA Tracking Data Relay Satellite (TDRS) satellite at 62 deg. West longitude to conduct live satellite S-band propagation experiments and demonstrations of satellite sound broadcasting over the next two years (1993-1994). The NASA/VOA DBS-R program has applied intensive effort to garner domestic and international support for the DBS-R concept. An S-band DBS-R allocation was achieved for Region 2 at WARC-92 held in Spain. With this allocation, the DBS-R program now needs to conduct S-band propagation experiments and systems demonstrations that will assist in the development of planning approaches for the use of Broadcast Satellite Service (Sound) frequency bands prior to the planning conference called for by WARC-92. These activities will also support receiver concept development applied to qualities ranging from AM to Monophonic FM, Stereophonic FM, Monophonic CD, and Stereophonic CD quality.

Hollansworth, James E.

Direct broadcast satellite-radio, space-segment/receiver tradeoffs

The balance between receiver complexity and the required satellite equivalent isotropically radiated power (EIRP) for Direct Broadcast Satellite-Radio (DBS-R) service is addressed. In general the required receiver complexity and cost can be reduced at the expense of higher space-segment cost by allowing a higher satellite EIRP. The tradeoff outcome is sensitive to the total number of anticipated receivers in a given service area, the number of audio programs, and the required audio quality. An understanding of optimum choice of satellite EIRP for DBS-R under various service requirements is a critical issue at this time when International Radio Consultative Committee (CCIR) is soliciting input in preparation for the International Telecommunications Union (ITU) planning conference for the service.

Golshan, Nasser

Utilizing a TDRS satellite for direct broadcast satellite-radio propagation experiments and demonstrations

The NASA/VOA Direct Broadcast Satellite - Radio (DBS-R) Program will be using a NASA Tracking Data Relay Satellite (TDRS) at 62 deg West longitude to conduct live satellite S-band propagation experiments and demonstrations of satellite sound broadcasting over the next two years (1993-1994). The NASA/VOA DBS-R program has applied intensive effort to garner domestic and international support for the DBS-R concept. An S-band DBS-R allocation was achieved for Region 2 at WARC-92 held in Spain. With this allocation, the DBS-R program now needs to conduct S-band propagation experiments and systems demonstrations that will assist in the development of planning approaches for the use of Broadcast Satellite Service (Sound) frequency bands prior to the planning conference called for by WARC-92. These activities will also support receiver concept development applied to qualities ranging from AM to Monophonic FM, Stereophonic FM, Monophonic CD, and Stereophonic CD quality.

Hollansworth, James E.

Utilizing a TDRS satellite for direct broadcast satellite-radio propagation experiments and demonstrations

The NASA/VOA Direct Broadcast Satellite - Radio (DBS-R) Program will be using a NASA Tracking Data Relay Satellite (TDRS) satellite at 62 deg West longitude to conduct live satellite S-band propagation experiments and demonstrations of satellite sound broadcasting over the next two years (1993-1994). The NASA/VOA DBS-R program has applied intensive effort to garner domestic and international support for the DBS-R concept. An S-band DBS-R allocation was achieved for Region 2 at WARC-92 held in Spain. With this allocation, the DBS-R program now needs to conduct S-band propagation experiments and systems demonstrations that will assist in the development of planning approaches for the use of Broadcast Satellite Service (Sound) frequency bands prior to the planning conference called for by WARC-92. These activities will also support receiver concept development applied to qualities ranging from AM to Monophonic FM, Stereophonic FM, Monophonic CD, and Stereophonic CD quality.

Hollansworth, James E.

ISO Key Project: Exploring the full range of QUASAR/AGN properties

The PIA (PHOT Interactive Analysis) software was upgraded as new releases were made available by VILSPA. We have continued to analyze our data but, given the large number of still outstanding problems with the calibration and analysis (listed below), we remain unable to move forward on our scientific program. We have concentrated on observations with long (256 sec) exposure times to avoid the most extreme detector responsivity drift problems which occur with a change in observed flux level, ie. as one begins to observe a new target. There remain a significant number of problems with analyzing these data including: (1) the default calibration source (FCS) observations early in the mission were too short and affected by strong detector responsivity drifts; (2) the calibration of the FCS sources is not yet well-understood, particularly for chopped observations (which includes most of ours); (3) the detector responsivity drift is not well-understood and models are only now becoming available for fitting chopped data; (4) charged particle hits on the detector cause transient responsivity drifts which need to be corrected; (5) the "flat-field" calibration of the long-wavelength (array) detectors: C1OO, C200 leaves significant residual structure and so needs to be improved;(6) the vignetting correction, which affects detected flux levels in the array detectors, is not yet available; (7) the intra-filter calibrations are not yet available; and (8) the background above 60 microns has a significant gradient which results in spurious positive and negative "detections" in chopped observations. ISO Observation planning, conferences and talks, ground based observing and other grant related activities are also briefly discussed.

Wilkes, B.

Habitability Considerations for a Notional Five-Day Small Pressurized Rover Excursion

Within the Artemis program, the Pressurized Rover (PR) is intended to support two-person mobile habitation up to roughly thirty days in duration. Lunar surface use of the PR, however, assumes a crew swap approximately halfway through a 33-day surface mission. Within that shorter duration, a rover crew may perform one or more excursions to remote sites in support of specific mission science or operational objectives. An important consideration in rover design is ensuring that the habitation accommodations in the vehicle support these types of missions. No pressurized rovers have ever been used in human spaceflight, but several have been proposed. The current NASA pressurized rover reference configuration is based on the third generation of the prototype small pressurized rover initially developed under Constellation. Using the NASA reference configuration, habitability considerations are discussed in the context of a notional five-day science excursion. The primary focus will be on the time the crew spends in the cabin, as opposed to time spent outside the vehicle on science-based EVAs. On each day of the excursion, the specific crew activities will be detailed. Crew activities that will be assessed include post sleep, EVA preparation, daily planning conference, private medical conference, traverse driving, EVA cabin egress, EVA cabin ingress, post-EVA activity, crew meals, pre-egress site observation and analysis, crew exercise, pre-sleep, and sleep. Considerations for crew fatigue will be discussed, including lessons learned from field testing. Finally, the assessment will identify hypotheses to assess in future analog missions and suitable test campaigns to evaluate them.

Pressurized Rover

Inverse Text Normalization of Air Traffic Control System Command Center Planning Telecon Transcriptions

We present a hybrid neural network and rule-based Inverse Text Normalization (ITN) method for domains containing unique technical phraseology, specifically ATCSCC planning telecon audio transcriptions. The Air Traffic Control System Command Center (ATCSCC) hosts bihourly planning telephone conferences (or planning telecons) to ensure smooth operations within the National Airspace (NAS). Access to both live and post meeting transcripts of this speech audio would enable quick review of meetings. ITN is the process of converting un-formatted "raw'' speech-to-text transcripts into a human (expert) readable written form. Our hybrid ITN framework utilizes a neural network to format conversational English, and rule-based methods to format domain-specific aviation text. With a preliminary overall Word Error Rate with Punctuation and Capitalization (WER PC) of 8.26, we show that this method has vast potential in being applied to ATCSCC planning telecon audio and other audio/text based data available in ATM.

Air Traffic Management

Inverse Text Normalization of Air Traffic Control System Command Center Planning Telecon Transcriptions

We present a hybrid neural network and rule-based Inverse Text Normalization (ITN) method for domains containing unique technical phraseology, specifically Air Traffic Control System Command Center (ATCSCC) planning telecon audio transcriptions. The ATCSCC hosts bi-hourly planning telephone conferences (or planning telecons) to ensure smooth operations within the National Airspace (NAS). Access to both live and post meeting transcripts of this speech audio would enable quick review of meetings. Provided speech transcripts, ITN is the process of converting unformatted raw Automated Speaker Recognition (ASR) model transcripts into a human (expert) readable written form. Our hybrid ITN framework utilizes a fine-tuned Bidirectional Encoder Representations from Transformers neural network to format conversational English, and rule-based methods to format domain-specific aviation text. With an overall Punctuation Error Rate (PER) of 25.56 and Word Error Rate with Punctuation and Capitalization (WER PC) of 5.47, we show that this method has vast potential in being applied to ATCSCC planning telecon audio and other audio/text based data available in ATM.

ATM

Inverse Text Normalization of Air Traffic Control System Command Center Planning Telecon Transcriptions

We present a hybrid neural network and rule-based Inverse Text Normalization (ITN) method for domains containing unique technical phraseology, specifically Air Traffic Control System Command Center (ATCSCC) planning telecon audio transcriptions. The ATCSCC hosts bi-hourly planning telephone conferences (or planning telecons) to ensure smooth operations within the National Airspace (NAS). Access to both live and post meeting transcripts of this speech audio would enable quick review of meetings. Provided speech transcripts, ITN is the process of converting unformatted raw Automated Speaker Recognition (ASR) model transcripts into a human (expert) readable written form. Our hybrid ITN framework utilizes a fine-tuned Bidirectional Encoder Representations from Transformers neural network to format conversational English, and rule-based methods to format domain-specific aviation text. With an overall Punctuation Error Rate (PER) of 25.56 and Word Error Rate with Punctuation and Capitalization (WER PC) of 5.47, we show that this method has vast potential in being applied to ATCSCC planning telecon audio and other audio/text based data available in ATM.

ATM