Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Computer Backup Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Large File System Backup: NERSC Global File System Experience

NERSC's Global File system (NGF), accessible from all compute systems at NERSC, holds files and data from many scientific projects. A full backup of this file system to our High Performance Storage System (HPSS) is performed periodically. Disk storage usage by projects at NERSC has grown seven fold over a two year period, from ~;;20TB in June 2006 to ~;;140 TB in June 2008. The latest full backup took about 13 days and more than 200 T10k tape cartridges (.5 TB capacity). Petabyte file systems are becoming a reality in the next few years and the existing utilities are already strained in handling backup tasks.

97 MATHEMATICS AND COMPUTING↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

Demonstration of Data Center Energy Use Prediction Software

This report documents a demonstration of a software modeling tool from Romonet that was used to predict energy use and forecast energy use improvements in an operating data center. The demonstration was conducted in a conventional data center with a 15,500 square foot raised floor and an IT equipment load of 332 kilowatts. It was cooled using traditional computer room air handlers and a compressor-based chilled water system. The data center also utilized an uninterruptible power supply system for power conditioning and backup. Electrical energy monitoring was available at a number of locations within the data center. The software modeling tool predicted the energy use of the data center's cooling and electrical power distribution systems, as well as electrical energy use and heat removal for the site. The actual energy used by the computer equipment was recorded from power distribution devices located at each computer equipment row. The model simulated the total energy use in the data center and supporting infrastructure and predicted energy use at energy-consuming points throughout the power distribution system. The initial predicted power levels were compared to actual meter readings and were found to be within approximately 10 percent at a particular measurement point, resulting in a site overall variance of 4.7 percent. Some variances were investigated, and more accurate information was entered into the model. In this case the overall variance was reduced to approximately 1.2 percent. The model was then used to predict energy use for various modification opportunities to the data center in successive iterations. These included increasing the IT equipment load, adding computer room air handler fan speed controls, and adding a water-side economizer. The demonstration showed that the software can be used to simulate data center energy use and create a model that is useful for investigating energy efficiency design changes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling Framework for Data Center

This chapter highlights the critical need for advanced modeling of data centers due to their rapidly increasing energy consumption and impact on grid reliability. Driven by the demand for AI applications, data centers are projected to consume a significant portion of US energy by 2028, putting stress on an already challenged power grid. The chapter emphasizes the importance of "fast" time-scale models to understand the dynamic interactions between data centers and the grid, especially given the rapid power fluctuations of AI workloads. It outlines a modeling framework that includes both offline and real-time EMT domain simulations, detailing the necessary representations for various components like utility interfaces, transformers, IT loads, UPS, cooling loads, Battery Energy Storage Systems (BESS), generators, protection systems, and higher-level control systems. While standard simulation tools like PSCAD offer basic models, custom development is often required to accurately capture the unique and fast-changing behaviors of modern data centers. The chapter also discusses key metrics and test cases for validating these models, focusing on transient load responses, protection relay coordination, and demand flexibility. Finally, it addresses the challenges of modeling large-scale data centers, such as computational complexity and the trade-off between model fidelity and practicality, suggesting hybrid modeling approaches as a solution. The overarching goal is to create a robust framework that helps assess data center impacts on grid stability, identify vulnerabilities, and inform the development of standards for reliable integration of these large loads into the bulk power system.

25 ENERGY STORAGE↗

Scalable Transparent Checkpoint-Restart of Global Address Space Applications on Virtual Machines over Infiniband

Checkpoint-Restart is one of the most used software approaches to achieve fault-tolerance in high-end clusters. While standard techniques typically focus on user-level solutions, the advent of virtualization software has enabled efficient and transparent system-level approaches. In this paper, we present a scalable transparent system-level solution to address fault-tolerance for applications based on global address space (GAS) programming models on Infiniband clusters. In addition to handling communication, the solution addresses transparent checkpoint of user-generated files. We exploit the support for the Infiniband network in the Xen virtual machine environment. We have developed a version of the Aggregate Remote Memory Copy Interface (ARMCI) one-sided communication library capable of suspending and resuming applications. We present efficient and scalable mechanisms to distribute checkpoint requests and to backup virtual machines memory images and file systems. We tested our approach in the context of NWChem, a popular computational chemistry suite. We demonstrated that NWChem can be executed, without any modification to the source code, on a virtualized 8-node cluster with very little overhead (below 3%). We observe that the total checkpoint time is limited by disk I/O. Finally, we measured system-size depended components of the checkpoint time on up to 1024 cores (128 nodes), demonstrating the scalability of our approach in medium/large-scale systems.

97 MATHEMATICS AND COMPUTING↗

Remote monitoring of critical reactor parameters

A nuclear reactor instrumentation system monitors a nuclear power system that includes a reactor core within a reactor vessel and one or more sensors for monitoring parameters of the nuclear power system. The nuclear reactor instrumentation system includes a computer having a processor and configured to be powered by a normal power source and a backup power source; a wireless transmitter operable under the control of the processor; and a memory coupled to the processor and containing stored programming instructions. The stored programming instructions are executable by the processor to cause the processor to receive data from the sensors; identify a loss of normal power from the normal power source; and in response to identifying the loss of normal power, cause the wireless transmitter to transmit the received data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Precursor Analysis Report: SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003

The SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003 Precursor Analysis Report leverages publicly available information about Davis-Besse’s 2003 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. On 25 January 2003, the SQL Slammer worm infected more than 90% of vulnerable hosts and crashed the internet in 10 to 15 minutes, making it one of the fastest spreading worms in history. SQL Slammer is a fileless, memory-resident worm that remotely exploits a stack-based buffer overflow vulnerability on local hosts to intensively scan and rapidly self-propagate across the internet. The worm infected approximately 300,000 unpatched hosts running Microsoft Structured Query Language (SQL) Server 2000 or Microsoft Desktop Engine (MSDE) 2000 with SQL Server Resolution Service. The SQL Slammer worm indirectly infected FirstEnergy’s Davis-Besse nuclear power plant by first infecting a consultant’s company network server and then propagating through an external misconfigured connection into Davis-Besse’s site network. The infection caused major network congestion, slow performance, data overloads, and the inability of local hosts to communicate with each other, which eventually caused a loss of availability and a loss of view when the Safety Parameter Display System (SPDS) and Plant Process Computer (PPC) crashed. At the time of the infection, the plant was already offline, the digital monitoring systems had redundant analog backups, and the plant control and safety functions were not affected, so there were no concerns of a safety breach. However, this incident resulted in many lessons learned and spawned important discussions about cybersecurity’s role in nuclear safety and electric power reliability regulation, policy, and guidance. Researchers and analysts identified 10 unique techniques utilized during the attack with a total of 640 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Eight of the identified techniques used during Davis-Besse cyber attack were precursors to the triggering event. Analysis identified 596 observables associated with these precursor techniques, 428 of which were assessed to have an increased likelihood of being perceived in the 331 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Utilization of GIS technology to support development of flow and contaminant fate and transport models at US DOE sites - 15457

U.S. Department of Energy (DOE) sites have accumulated years of data and millions of spatial and temporal records related to the hydrological cycle, contaminant transport, and parameters of remediation technologies. In addition, numerical models which use field monitoring data to help understand flow and transport produce gigabytes of computed spatial and temporal data for each computation node. There is a need therefore for an advanced spatial data structure that can be used to address the management, processing, and analysis of spatial and temporal numerical modeling data derived from multiple sources. This can be accomplished using a geo-database. The development of an ArcSDE geo-database facilitates the centralized storage, backup, accessibility, organization, and management of model configuration and computed simulation data, putting it into a structured, coherent, and logical computer-supported system. GIS data processing and automation would enable faster and hence more complex analyses of field test data. The Applied Research Center (ARC) at Florida International University (FIU) has provided analysis of flow and transport for several watersheds at DOE's Oak Ridge Reservation (ORR), including East Fork Poplar Creek (EFPC), Upper EFPC in the Y-12 National Security Complex area (Y-12 NSC) and White Oak Creek (WOC). Integrated surface and subsurface flow, fate and transport models were developed to provide analysis of contaminant patterns within each watershed. In addition, digital monitoring data available from the Oak Ridge Environmental Information System (OREIS) related to mercury (Hg) contamination and remediation within these watersheds was used for calibration and verification of the model. Experimental studies were also carried out which provided kinetic and equilibrium data about important parameters related to Hg transport, speciation and methylation/demethylation kinetics within the watershed. Geographic Information Systems (GIS) technology was employed to support the modeling work through storage and geo-processing of spatial and temporal data required by the models and to produce hydrogeological maps for visualization. An ArcGIS geo-database was developed for centralized storage and management of experimental and computed model data and its capabilities were extended over the years using tools such as ModelBuilder combined with Python scripting to automate repetitive tasks, perform statistical analyses and generate maps and reports. The hydrologic geo-database model developed possesses a structure that enables linkage with scalable hydrologic modeling tools/applications to model hydrologic systems, and in this case, enables the testing of the potential impacts of various remediation scenarios on the ORR watersheds. The ArcSDE geo-database can also be used to automate and simplify the process of calling stored GIS and time series data. This geo-database can serve as a tool for contaminant flow and transport analyses which require large amounts of high-quality spatial and temporal data in order to ensure reliability and validity of modeling results. The existing geo-database structure developed for the hydrological modeling at ORR was designed to be replicable for application at other DOE sites. An investigation of downloadable free/open source GIS software along with required security protocols to facilitate online querying of the database was also conducted to determine methods by which project-derived data can be more easily shared with other project stakeholders such as DOE personnel and site contractors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Next Step in Deployment of Computer Based Procedures For Field Workers: Insights And Results From Field Evaluations at Nuclear Power Plants

The paper-based procedures currently used for nearly all activities in the commercial nuclear power industry have a long history of ensuring safe operation of the plants. However, there is potential to greatly increase efficiency and safety by improving how the human operator interacts with the procedures. One way to achieve these improvements is through the use of computer-based procedures (CBPs). A CBP system offers a vast variety of improvements, such as context driven job aids, integrated human performance tools (e.g., placekeeping, correct component verification, etc.), and dynamic step presentation. The latter means that the CBP system could only display relevant steps based on operating mode, plant status, and the task at hand. A dynamic presentation of the procedure (also known as context-sensitive procedures) will guide the operator down the path of relevant steps based on the current conditions. This feature will reduce the operator’s workload and inherently reduce the risk of incorrectly marking a step as not applicable and the risk of incorrectly performing a step that should be marked as not applicable. The research team at the Idaho National Laboratory has developed a prototype CBP system for field workers, which has been evaluated from a human factors and usability perspective in four laboratory studies. Based on the results from each study revisions were made to the CBP system. However, a crucial step to get the end users' (e.g., auxiliary operators, maintenance technicians, etc.) acceptance is to put the system in their hands and let them use it as a part of their everyday work activities. In the spring 2014 the first field evaluation of the INL CBP system was conducted at a nuclear power plant. Auxiliary operators conduct a functional test of one out of three backup air compressors each week. During the field evaluation activity, one auxiliary operator conducted the test with the paper-based procedure while a second auxiliary operator followed along with the computer-based procedure. After each conducted functional test the operators were asked a series of questions designed to provide feedback on the feasibility to use a CBP system in the plant and the general user experience of the CBP system. This paper will describe the field evaluation and its results in detail. For example, the result shows that the context driven job aids and the incorporated human performance tools are much liked by the auxiliary operators. The paper will describe and present initial findings from a second field evaluation conducted at second nuclear utility. For this field evaluation a preventive maintenance work order for the HVAC system was used. In addition, there will be a description of the method and objective of two field evaluations planned to be conducted late 2014 or early 2015.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

November 2021 Operational Highlights

Completed: 1. the initial tests of document workflows for Titan on the Red, which included standing up a software encryption capability to test data ingestion; 2. a software encryption capability in order to ingest the first data source by the end of the month; 3. a stand-alone computer for classified ontology data entry. Titan on the Red is an artificial intelligence/machine learning system to make digitizing, cataloging, and searching NSRC collections easier and more efficient. Created Online Vault backups, with one copy stored at LANL and one shipped to Lawrence Livermore National Laboratory. The Online Vault is a classified, searchable library of LANL’s nuclear weapons design and test history. Imported new Laboratory Directed Research and Development (LDRD) documents based on revised access categories. Bulk ingested nearly 10,000 documents via java-based PowerLoader. This application ingests metadata and content into the Online Vault to meet the requirements for the NSRC collections. Rehoused 300 linear feet of weapons physics documents in archival, acid-free storage folders and boxes.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

US-VISIT Independent Verification and Validation Project: Test Bed Establishment Report

This document describes the computational and data systems available at the Lawrence Livermore National Laboratory for use on the US-VISIT Independent Verification and Validation (IV&V) project. This system - composed of data, software and hardware - is designed to be as close as a representation of the operational ADIS system as is required to verify and validate US-VISIT methodologies. It is not required to reproduce the computational capabilities of the enterprise-class operational system. During FY10, the test bed was simplified from the FY09 version by reducing the number of database host computers from three to one, significantly reducing the maintenance and overhead while simultaneously increasing system throughput. During the current performance period, a database transfer was performed as a set of Data Pump Export files. The previous RMAN backup from 2007 required the availability of an AIX system which is not required when using data pump. Due to efficiencies in the new system and process, loading of the database refresh was able to be accomplished in a much shorter time frame than was previously required. The FY10 Oracle Test Bed now consists of a single Linux platform hosting two Oracle databases including the 2007 copy as well as the October 2010 refresh.

42 ENGINEERING↗

Development of an ADC radiation tolerance characterization system for the upgrade of the ATLAS LAr calorimeter

ATLAS LAr calorimeter will undergo its Phase-I upgrade during the long shutdown (LS2) in 2018, and a new LAr Trigger Digitizer Board (LTDB) will be designed and installed. Several commercial-off-the-shelf (COTS) multi-channel high-speed ADCs have been selected as possible backups of the radiation tolerant ADC ASICs for the LTDB. Here, to evaluate the radiation tolerance of these backup commercial ADCs, we developed an ADC radiation tolerance characterization system, which includes the ADC boards, data acquisition (DAQ) board, signal generator, external power supplies and a host computer. The ADC board is custom designed for different ADCs, with ADC drivers and clock distribution circuits integrated on board. The Xilinx ZC706 FPGA development board is used as a DAQ board. The data from the ADC are routed to the FPGA through the FMC (FPGA Mezzanine Card) connector, de-serialized and monitored by the FPGA, and then transmitted to the host computer through the Gigabit Ethernet. A software program has been developed with Python, and all the commands are sent to the DAQ board through Gigabit Ethernet by this program. Two ADC boards have been designed for the ADC, ADS52J90 from Texas Instruments and AD9249 from Analog Devices respectively. TID tests for both ADCs have been performed at BNL, and an SEE test for the ADS52J90 has been performed at Massachusetts General Hospital (MGH). Test results have been analyzed and presented. The test results demonstrate that this test system is very versatile, and works well for the radiation tolerance characterization of commercial multi-channel high-speed ADCs for the upgrade of the ATLAS LAr calorimeter. It is applicable to other collider physics experiments where radiation tolerance is required as well.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Microgrid design and multi-year dispatch optimization under climate-informed load and renewable resource uncertainty

Microgrids are an increasingly popular solution to provide energy resilience in response to increasing grid dependency and the growing impacts of climate change on grid operations. However, existing microgrid models do not currently consider the uncertain and long-term impacts of climate change when determining a set of design and operational decisions to minimize long-term costs or meet a resilience threshold. In this paper, we develop a novel scenario generation method that accounts for the uncertain effects of (i) climate change on variable renewable energy availability, (ii) extreme heat events on site load, and (iii) population and electrification trends on load growth. Additionally, we develop a two-stage stochastic programming extension of an existing microgrid design and dispatch optimization model to obtain uncertainty-informed and climate-resilient energy system decisions that minimizes long-term costs. Use of sample average approximation to validate our two case studies illustrates that the proposed methodology produces high-quality solutions that add resilience to systems with existing backup generation while reducing expected long-term costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY 2021 High Performance Computing Overall Systems Availability

INL HPC capabilities were utilized by individuals at universities, industry, and government laboratories for a wide range of research and engineering activities between October 1, 2020 and September 30, 2021. The HPC systems themselves experienced minimal downtime over the course of the fiscal year. Most downtime was planned to apply critical security patches to system software. The most serious of the unplanned downtime events occurred due to maintenance on the Kohler backup generator in July. Users were kept notified of all events, both planned and unplanned, via 36 total email notifications in FY-21. The INL HPC systems continue to provide high availability for collaboration and innovation in nuclear energy systems research.

99 GENERAL AND MISCELLANEOUS↗

Real-Time Hardware-in-The-Loop Implementation of Protection and Self-Healing of Microgrids

The design of a reliable protection scheme for microgrids often requires communication between protective devices and microgrid controllers. The authors have developed such a communication assisted scalable protection scheme with a self healing feature to protect a microgrid with 100% Inverter Based Resources (IBRs). The communication assisted scheme must be validated in real time with cyber physical co-simulation for successful demonstration. In this regard, the paper presents a co-simulation platform between a simulated power system model using RTDS and physical protective devices. The primary protection of the scheme is programmed in SEL 421-7 relay and backup protection is programmed in MATLAB on a generic computer acting as a microgrid controller. The IEC 61850 models are used to communicate between SEL-421-7 relay and RTDS, whereas TCP/IP communication connects the microgrid controller to RTDS. The paper’s focus is to demonstrate the co- simulation platform with communication links established using both protocols and validate the proposed scheme in real-time on the IEEE 123 node distribution feeder. The paper explains the configuration of the IEC 61850 and TCP/IP communications as the interface requires proper hardware and software setup. Furthermore, the real time performance indicates the Hardware In the Loop (HIL) framework as a competent testing environment for the developed protection scheme for microgrids.

42 ENGINEERING↗

FY 18 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Inventory of Software used for Process Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016), and Hadgu et al. (2017). The TSPA computing hardware (2014 server cluster -CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of Gold Sim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The FY18 task included developing an inventory of software used for the Yucca Mountain Project process models and preliminary assessment of status of the software; enhancing security of the cluster and setting a backup system. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dosimetric Comparison of Helical Tomotherapy and Linac-IMRT Treatment Plans for Head and Neck Cancer Patients

The rapid development and clinical implementation of external beam radiation treatment technologies continues. The existence of various commercially available technologies for intensity-modulated radiation therapy (IMRT) has stimulated interest in exploring the differential potential advantage one may have compared with another. Two such technologies, Hi-Art Helical Tomotherapy (HT) and conventional medical linear accelerator-based IMRT (LIMRT) have been shown to be particularly suitable for the treatment of head and neck cancers. In this study, 23 patients who were diagnosed with stages 3 or 4 head and neck cancers, without evidence of distance metastatic disease, were treated in our clinic. Treatment plans were developed for all patients simultaneously on the HT planning station and on the Pinnacle treatment planning system for step-and-shoot IMRT. Patients were treated only on the HT unit, with the LIMRT plan serving as a backup in case the HT system might not be available. All plans were approved for clinical use by a physician. The prescription was that patients receive at least 95% of the planning target volume (PTV), which is 66 Gy at 2.2 Gy per fraction. Several dosimetric parameters were computed: PTV dose coverage; PTV volume conformity index; the normalized total dose (NTD), where doses were converted to 2 Gy per fraction to organs at risk (OAR); and PTV dose homogeneity. Both planning systems satisfied our clinic's PTV prescription requirements. The results suggest that HT plans had, in general, slightly better dosimetric characteristics, especially regarding PTV dose homogeneity and normal tissue sparing. However, for both techniques, doses to OAR were well below the currently accepted normal tissue tolerances. Consequently, factors other than the dosimetric parameters studied here may have to be considered when making a choice between IMRT techniques.

61 RADIATION PROTECTION AND DOSIMETRY↗