Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Coeur d'Alene Basin”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Coeur d'Alene Tribe Fisheries Program : Implementation of Fisheries Enhancement Opportunities on the Coeur d’Alene Reservation : 2007 Annual Report.

Historically, the Coeur d'Alene Indian Tribe depended on runs of anadromous salmon and steelhead along the Spokane River and Hangman Creek, as well as resident and adfluvial forms of trout and char in Coeur d'Alene Lake, for survival. Dams constructed in the early 1900s on the Spokane River in the City of Spokane and at Little Falls (further downstream) were the first dams that initially cut-off the anadromous fish runs from the Coeur d'Alene Tribe. These fisheries were further removed following the construction of Chief Joseph and Grand Coulee Dams on the Columbia River. Together, these actions forced the Tribe to rely solely on the resident fish resources of Coeur d'Alene Lake for their subsistence needs. The Coeur d'Alene Tribe is estimated to have historically harvested around 42,000 westslope cutthroat trout (Oncorhynchus clarki lewisi) per year (Scholz et al. 1985). In 1967, Mallet (1969) reported that 3,329 cutthroat trout were harvested from the St. Joe River, and a catch of 887 was reported from Coeur d'Alene Lake. This catch is far less than the 42,000 fish per year the tribe harvested historically. Today, only limited opportunities exist to harvest cutthroat trout in the Coeur d'Alene Basin. It appears that a suite of factors have contributed to the decline of cutthroat trout stocks within Coeur d'Alene Lake and its tributaries (Mallet 1969; Scholz et al. 1985; Lillengreen et al. 1993). These factors included the construction of Post Falls Dam in 1906, major changes in land cover types, impacts from agricultural activities, and introduction of exotic fish species. The decline in native cutthroat trout populations in the Coeur d'Alene basin has been a primary focus of study by the Coeur d'Alene Tribe's Fisheries and Water Resources programs since 1990. The overarching goals for recovery have been to restore the cutthroat trout populations to levels that allow for subsistence harvest, maintain genetic diversity, and increase the probability of persistence in the face of anthropogenic influences and prospective climate change. This included recovering the lacustrine-adfluvial life history form that was historically prevalent and had served to provide both resilience and resistance to the structure of cutthroat trout populations in the Coeur d'Alene basin. To this end, the Coeur d'Alene Tribe closed Lake Creek and Benewah Creek to fishing in 1993 to initiate recovery of westslope cutthroat trout to historical levels. However, achieving sustainable cutthroat trout populations also required addressing biotic factors and habitat features in the basin that were limiting recovery. Early in the 1990s, BPA-funded surveys and inventories identified limiting factors in Tribal watersheds that would need to be remedied to restore westslope cutthroat trout populations. The limiting factors included: low-quality, low-complexity mainstem stream habitat and riparian zones; high stream temperatures in mainstem habitats; negative interactions with nonnative brook trout in tributaries; and potential survival bottlenecks in Coeur d'Alene Lake. In 1994, the Northwest Power Planning Council adopted the recommendations set forth by the Coeur d'Alene Tribe to improve the Reservation fishery (NWPPC Program Measures 10.8B.20). These recommended actions included: (1) Implement habitat restoration and enhancement measures in Alder, Benewah, Evans, and Lake Creeks; (2) Purchase critical watershed areas for protection of fisheries habitat; (3) Conduct an educational/outreach program for the general public within the Coeur d'Alene Reservation to facilitate a 'holistic' watershed protection process; (4) Develop an interim fishery for tribal and non-tribal members of the reservation through construction, operation and maintenance of five trout ponds; (5) Design, construct, operate and maintain a trout production facility; and (6) Implement a monitoring program to evaluate the effectiveness of the hatchery and habitat improvement projects. These activities provide partial mitigation for the extirpation of anadromous fish resources from usual and accustomed harvest areas and Reservation lands. Since that time, much of the mitigation activities occurring within the Coeur d'Alene sub-basin have had a connection to the BPA project entitled 'Implement of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation' (1990-044-00), which is sponsored and implemented by the Coeur d'Alene Tribe Fisheries Program.

13 HYDRO ENERGY↗

Bunker Hill Sediment Characterization Study

The long history of mineral extraction in the Coeur d’Alene Basin has left a legacy of heavy metal laden mine tailings that have accumulated along the Coeur d’Alene River and its tributaries (U.S. Environmental Protection Agency, 2001; Barton, 2002). Silver, lead and zinc were the primary metals of economic interest in the area, but the ores contained other elements that have become environmental hazards including zinc, cadmium, lead, arsenic, nickel, and copper. The metals have contaminated the water and sediments of Lake Coeur d’Alene, and continue to be transported downstream to Spokane Washington via the Spokane River. In 1983, the EPA listed the Bunker Hill Mining and Metallurgical Complex on the National Priorities List. Since that time, many of the most contaminated areas have been stabilized or isolated, however metal contaminants continue to migrate through the basin. Designation as a Superfund site causes significant problems for the economically depressed communities in the area. Identification of primary sources of contamination can help set priorities for cleanup and cleanup options, which can include source removal, water treatment or no action depending on knowledge about the mobility of contaminants relative to water flow. The mobility of contaminant mobility under natural or engineered conditions depends on multiple factors including the physical and chemical state (or speciation) of metals and the range of processes, some of which can be seasonal, that cause mobilization of metals. As a result, it is particularly important to understand metal speciation (National Research Council, 2005) and the link between speciation and the rates of metal migration and the impact of natural or engineered variations in flow, biological activity or water chemistry.

54 ENVIRONMENTAL SCIENCES↗

Microreactors Electrify the Future of Mining

This presentation is for the Joint Coeur d’Alene and Columbia Basin meeting of the Society for Mining, Metallurgy & Exploration on May 12. The presentation briefly defines microreactor technology, potential markets, provide an example of a remote mining case study in Alaska, describes ways to extend the product value chain, presents a concept for a microreactor powered integrated mining operation, and describes Environmental, Social and Governance (ESG) considerations in mining.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

13 HYDRO ENERGY↗