Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cryogenic Propulsion Stage (CPS) Configuration in Support of NASA's Multiple Design Reference Missions (DRMs)

In support of the National Aeronautics and Space Administration's (NASA) Human Exploration and Operations Mission Directorate (HEOMD), the Space Launch System (SLS) is being designed for safe, affordable, and sustainable human and scientific exploration missions beyond Earth's or-bit (BEO). The SLS Team is tasked with developing a system capable of safely and repeatedly lofting a new fleet of spaceflight vehicles beyond Earth orbit. The Cryogenic Propulsion Stage (CPS) is a key enabler for evolving the SLS capability for BEO missions. This paper reports on the methodology and initial recommendations relative to the CPS, giving a brief retrospective of early studies on this promising propulsion hardware. This paper provides an overview of the requirements development and CPS configuration in support of NASA's multiple Design Reference Missions (DRMs).

Hanna, Stephen G.↗

Time-to-failure analysis for NiCd batteries in a CPS orbit

Cells operating at five degrees Celsius or less, and going to 60 to 65 percent depth of discharge, were studied as to whether they could achieve a useful working life of 7.5 years in a GPS orbit. The characteristics of various orbits were compared and it is noted that the GPS orbit experiences only 220 cycles a year and must be treated as a geosynchronous rather than a low Earth orbit. Cell degradation is considered to be the result of both trickle-charge degradation and degradation due to cycling. Time-to-failure values are presented for selected temperatures and depth of discharges.

Sense, K. A.↗

Cyber Physical Security (CPS) Extension to Air Traffic Management (ATM) Testbed

The Air Traffic Management (ATM) Testbed is being developed at NASA to enable benefit, impact, safety and cost assessments for accelerating the deployment of Concept and Technologies (C&T) in the National Airspace System (NAS). Today, C&T introduction into the NAS takes decades. The primary reason for this is an inability to assess the operational impact of the interaction between the proposed C&T and operationally deployed systems (Realistic Technologies) in terms of NAS-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airline fleet operations. Transition of C&T to operations requires mathematical modeling and simulation, Human-in-the-Loop (HITL) testing and shadow-mode evaluation driven by operational data. Whereas interaction with the operational system during testing and stages of deployment is not permissible due to safety concerns, it is certainly possible to create a simulation environment that closely mimics the NAS using the same operational systems/hardware for enabling such assessments. This presentation focuses on a proposed Cyber Physical Security extension to the ATM Testbed for creating a modeling and simulation architecture to study how well the Air Traffic Management system will perform and analyze effectiveness of mitigating security measures against particular cyber-attack scenarios.

Datta, Koushik↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗