Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluating the Impact of Residential Solar Contract Cancellations in the United States

The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.

14 SOLAR ENERGY↗

Utility Energy Service Contract Guide: A Resource for Contracting Officers Working on UESC Projects

A Utility Energy Service Contract (UESC) is a limited-source contract between a federal agency and serving utility for energy management services including energy and water efficiency improvements and demand-reduction services. In a UESC, the Contracting Officer (CO) will lead the acquisition effort, supported by technically knowledgeable staff working closely with the utility, to assess potential, investigate technical and economic feasibility, and ensure a fair and reasonable price for design and implementation of the project. The UESC Guide is a compilation of samples and templates developed as a resource to help COs implement Task Orders (TOs) for UESCs under existing U.S. General Services Administration (GSA) Areawide Contracts (AWC). All samples and templates provided in this guide were derived from actual UESC project contract documents and will be available for download on FEMP’s website at https://www.energy.gov/node/850656. Templates in Microsoft Word can be modified to address each agency’s unique acquisition process.

Federal Energy Management Program↗

Linkages between Policy and Business Innovation in the Development of China’s Energy Performance Contracting Market

China has a large and growing energy performance contracting (EPC) market, which has played a significant role in driving energy efficiency retrofits and improvements This paper evaluates how policies and business innovations have worked synergistically to expand China’s EPC market. We analyze the interconnected roles of four key factors: incentive policies, China’s Five-Year Plans, and business innovations in diversifying contract models and strengthening measurement and verification. We use multiple data sources for the analysis, including detailed information on business choices in 21 pilot projects, industry-wide surveys, and policy information. Our study indicates that supportive policies were important for the initial market development. As the market was established and continued to grow, the private sector started to take initiatives to address the issues that are left out of the policies, which helped overcome certain market barriers and enabled the sustainable growth of the market. Future policies could incorporate the successful innovations from the businesses to ensure long-term development of China’s EPC market. Understanding these policy and business drivers in a holistic way is critical to understanding how China was able to leverage its relatively small policy investments into much larger transformation of its existing buildings and industrial facilities through energy efficiency retrofits. This in turn can be informative for other countries seeking to achieve large-scale energy efficiency improvements.

Zhou, Yuanrong↗

The Design and Implementation of a Secure Datastore Based on Ethereum Smart Contract

In this paper, we present a secure datastore based on an Ethereum smart contract. Our research is guided by three research questions. First, we will explore to what extend a smart-contract-based datastore should resemble a traditional database system. Second, we will investigate how to store the data in a smart-contract-based datastore for maximum flexibility while minimizing the gas consumption. Third, we seek answers regarding whether or not a smart-contract-based datastore should incorporate complex processing such as data encryption and data analytic algorithms. The proposed smart-contract-based datastore aims to strike a good balance between several constraints: (1) smart contracts are publicly visible, which may create a confidentiality concern for the data stored in the datastore; (2) unlike traditional database systems, the Ethereum smart contract programming language (i.e., Solidity) offers very limited data structures for data management; (3) all operations that mutate the blockchain state would incur financial costs and the developers for smart contracts must make sure sufficient gas is provisioned for every smart contract call, and ideally, the gas consumption should be minimized. Our investigation shows that although it is essential for a smart-contract-based datastore to offer some basic data query functionality, it is impractical to offer query flexibility that resembles that of a traditional database system. Furthermore, we propose that data should be structured as tag-value pairs, where the tag serves as a non-unique key that describes the nature of the value. We also conclude that complex processing should not be allowed in the smart contract due to the financial burden and security concerns. The tag-based secure datastore designed this way also defines its applicative perimeter, i.e., only applications that align with our strategy would find the proposed datastore a good fit. Those that would rather incur higher financial cost for more data query flexibility and/or less user burden on data pre- and post-processing would find the proposed database too restrictive.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Causal horizons, geodesic completeness and stability in slow contraction cosmology

We show that cosmological models with a semi-infinite phase of slow contraction (ekpyrosis) possess a combination of properties that can address several fundamental problems in cosmology, otherwise faced in contracting de Sitter phases or standard big bang expansion. In particular, flat or open slow contraction admits a stable past attractor that asymptotes to Minkowski space and is past geodesically complete, as well as a stable, flat, homogeneous, and isotropic future attractor with negligible Weyl curvature (and, therefore, negligible gravitational entropy). In bouncing cosmologies, this contracting attractor is terminated by a smooth, non-singular bounce that transforms the attractor properties at the end of contraction into the initial conditions for the subsequent expanding phase. Cosmologies incorporating a slow contraction phase have no particle horizon and therefore avoid the causal horizon problem. The past Minkowski attractor also generates an initial spectrum of vacuum-like quantum fluctuations on all wavelengths. Moreover, because the averaged expansion rate along past-directed geodesics is non-positive, models incorporating a semi-infinite phase of slow contraction also evade the Borde–Guth–Vilenkin theorem. By contrast, contracting de Sitter space possesses a finite particle horizon and becomes unstable in the presence of scalar fields, matter, or radiation.

Cosmology and Nongalactic Astrophysics (astro-ph.C↗

Sign Problem in Tensor-Network Contraction

We investigate how the computational difficulty of contracting tensor networks depends on the sign structure of the tensor entries. Using results from computational complexity, we observe that the approximate contraction of tensor networks with only positive entries has lower computational complexity as compared to tensor networks with general real or complex entries. This raises the question of how this transition in computational complexity manifests itself in the hardness of different tensor-network-contraction schemes. We pursue this question by studying random tensor networks with varying bias toward positive entries. First, we consider contraction via Monte Carlo sampling and find that the transition from hard to easy occurs when the tensor entries become predominantly positive; this can be understood as a tensor-network manifestation of the well-known negative-sign problem in quantum Monte Carlo. Second, we analyze the commonly used contraction based on boundary tensor networks. The performance of this scheme is governed by the number of correlations in contiguous parts of the tensor network (which by analogy can be thought of as entanglement). Remarkably, we find that the transition from hard to easy—i.e., from a volume-law to a boundary-law scaling of entanglement—already occurs for a slight bias of the tensor entries toward a positive mean, scaling inversely with the bond dimension D , and thus the problem becomes easy the earlier the larger D occurs. This is in contrast both to expectations and to the behavior found in Monte Carlo contraction, where the hardness at fixed bias increases with the bond dimension. To provide insight into this early breakdown of computational hardness and the accompanying entanglement transition, we construct an effective classical statistical-mechanical model that predicts a transition at a bias of the tensor entries of 1 / D , confirming our observations. We conclude by investigating the computational difficulty of computing expectation values of tensor-network wave functions (projected entangled-pair states, PEPSs) and find that in this setting, the complexity of entanglement-based contraction always remains low. We explain this by providing a local transformation that maps PEPS expectation values to a positive-valued tensor network. This not only provides insight into the origin of the observed boundary-law entanglement scaling but also suggests new approaches toward PEPS contraction based on positive decompositions. Published by the American Physical Society 2025

Chen, Jielun (ORCID:0000000178411545)↗

ESPC ESA Webinar Series: ESPC IDIQ Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contract (ESPC) vehicle. The DOE IDIQ ESPC contract vehicle uses a streamlined master contract that allows federal agencies to work with 21 energy service companies holding the current DOE IDIQ ESPC. Topics covered in the webinar include: An overview of the DOE IDIQ contract vehicle; ESA-specific considerations for IDIQ contracts; and Specific use cases. The webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as IDIQ tools and templates. This webinar is the fifth in a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ESPC ESA Webinar Series: ESPC ENABLE Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy's (DOE) ESPC ENABLE contract vehicle. The ESPC ENABLE contract vehicle is a streamlined procurement process that uses a standard investment grade audit tool and standard contract templates. Topics covered in the webinar include: An overview of the ESPC ENABLE contract vehicle; ESA-specific considerations for ENABLE contracts; and Case studies. This webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as ESPC ENABLE templates. This webinar is the fourth of a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Total Power Factor Smart Contract with Cyber Grid Guard Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Wind Farm

In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Graph Contractions for Calculating Correlation Functions in Lattice QCD

Computing correlation functions for many-particle systems in Lattice QCD is vital to extract nuclear physics observables like the energy spectrum of hadrons such as protons. However, this type of calculation has long been considered to be very challenging and computing-resource intensive because of the complex nature of a hadron composed of quarks with many degrees of freedom. In particular, a correlation function can be calculated through a sum of all possible pairs of quark contractions, each of which is a batched tensor contraction, dictated by Wick's theorem. Because the number of terms of this sum can be very large for any hadronic system of interest, fast evaluation of the sum faces several challenges: an extremely large number of contractions, a huge memory footprint at runtime, and the speed of tensor contractions. In this paper, we present a Lattice QCD analysis software suite, Redstar, which addresses these challenges by utilizing novel algorithmic and software engineering methods targeting modern computing platforms such as many-core CPUs and GPUs. In particular, Redstar represents every term in the sum of a correlation function by a graph, applies efficient graph algorithms to reduce the number of contractions to lower the cost of computations, and minimizes the total memory footprint. Moreover, Redstar carries out the contractions on either CPUs or GPUs utilizing an internal and highly efficient Hadron contraction library. Specifically, we illustrate some important algorithmic optimizations of Redstar, show various key design features of Hadron library, and present the speedup values due to the optimizations along with performance figures for calculating six correlations functions on four computing platforms.

Chen, Jie↗

Graph Contractions for Calculating Correlation Functions in Lattice QCD

Computing correlation functions for many-particle systems in Lattice QCD is vital to extract nuclear physics observables like the energy spectrum of hadrons such as protons. However, this type of calculation has long been considered to be very challenging and computing-resource intensive because of the complex nature of a hadron composed of quarks with many degrees of freedom. In particular, a correlation function can be calculated through a sum of all possible pairs of quark contractions, each of which is a batched tensor contraction, dictated by Wick's theorem. Because the number of terms of this sum can be very large for any hadronic system of interest, fast evaluation of the sum faces several challenges: an extremely large number of contractions, a huge memory footprint at runtime, and the speed of tensor contractions. In this paper, we present a Lattice QCD analysis software suite, Redstar, which addresses these challenges by utilizing novel algorithmic and software engineering methods targeting modern computing platforms such as many-core CPUs and GPUs. In particular, Redstar represents every term in the sum of a correlation function by a graph, applies efficient graph algorithms to reduce the number of contractions to lower the cost of computations, and minimizes the total memory footprint. Moreover, Redstar carries out the contractions on either CPUs or GPUs utilizing an internal and highly efficient Hadron contraction library. Specifically, we illustrate some important algorithmic optimizations of Redstar, show various key design features of Hadron library, and present the speedup values due to the optimizations along with performance figures for calculating six correlations functions on four computing platforms.

Chen, Jie↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Pressure drop in a prototypical 3D magnetohydrodynamic flow across contraction of a fusion blanket manifold

Predicting 3D magnetohydrodynamic (MHD) pressure losses associated with liquid metal flows in complex geometry ducts is required to design breeding blankets for fusion reactors. Of such components, manifolds exhibit major pressure losses. Recent correlations [T. Rhodeset al. Magnetohydrodynamic pressure drop and flow balancing of liquid metal flow in a prototypic fusion blanket manifold. Phys. Fluids. 2018; 30: 057101.] demonstrate promise for predicting pressure drops in electrically insulated inlet manifolds. In the present work, the extend to which these correlations can be applied to outlet manifolds, which feature sudden contractions, is investigated in both viscous-electromagnetic (VE) and inertial-electromagnetic (IE) regimes for Reynolds numbers 50 < Re < 1500, Hartmann numbers 2500 < Ha < 5475, and expansion/contraction ratio 10. Numerical computations have shown that the MHD pressure drops in the eutectic lead-lithium (PbLi) flows in contractions are almost identical to those in the flows featuring expansion with slightly higher magnitudes in the contraction cases. The small discripancy in the MHD pressure drop between contractions and expansions (<8%) suggests that the earlier obtained correlations for the 3D MHD pressure drop in a duct flow with a sudden expansion can also be applied to flows with a sudden contraction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intrinsic activation energies for ring contraction of allylic cations in zeolites

Cyclic carbocations are important intermediates in zeolite-catalyzed chemistries such as methanol-to-hydrocarbons conversion, naphthenes ring opening, or coke formation. While information about their thermodynamic stability exists, little is known about the kinetics of formation and transformation of cyclic carbocations in zeolites. To fill this knowledge gap, ring contraction of the 1,3,5,5-tetramethylcyclohexenyl cation (C 10 H 17 + ), a representative of 6-membered ring allylic cations, was investigated by in situ UV–vis and IR spectroscopy. Protonic forms of zeolites served as catalysts, at temperatures from 80 °C to 135 °C. Significant oligomerization and hydride transfer in BEA and FAU hampered kinetics analysis, whereas ring contraction dominated in the channels of MOR. The reactant cation, characterized by an electronic absorption at 314 nm and an allylic stretch at 1549 cm −1 , contracted to both a 1,3-alkyl-substituted cyclopentenyl cation (287 nm and 1506 cm −1 ) and a 1,2,3-alkyl-substituted cyclopentenyl cation (297 nm and 1489 cm −1 ). Collection of time-resolved IR spectra and fitting of the intensities with various kinetic models revealed a third transformation, which is expected from thermodynamics: the 1,3-alkyl-substituted cyclopentenyl cation isomerizes to the 1,2,3-alkyl-substituted cyclopentenyl cation. Series of IR spectra recorded at different temperatures delivered intrinsic activation enthalpies (entropies) in MOR of 67 ± 2 kJ mol −1 (−130 ± 6 J mol −1 K −1 ) and 90 ± 3 kJ mol −1 (−70 ± 8 J mol −1 K −1 ) for the contraction to 1,3- and 1,2,3-substituted species, and of 88 ± 5 kJ mol −1 (−84 ± 12 J mol −1 K −1 ) for the isomerization. The findings characterize one path – via contraction of larger rings – to different cyclopentenyl species in zeolites; and the associated, moderate activation energies suggest such transformations contribute to many complex hydrocarbon reaction networks.

Acid catalysis↗

A new computational framework for spinor-based relativistic exact two-component calculations using contracted basis functions

Here, a new computational framework for spinor-based relativistic exact two-component (X2C) calculations is developed using contracted basis sets with a spin–orbit contraction scheme. Generally contracted, j-adapted basis sets of p-block elements using primitive functions in the correlation-consistent basis sets are constructed for the X2C Hamiltonian with atomic mean-field spin–orbit integrals (the X2CAMF scheme). The contraction coefficients are taken from atomic X2CAMF Hartree–Fock spinors, thereby following the simple concept of a linear combination of atomic orbitals. Benchmark calculations of spin–orbit splittings, equilibrium bond lengths, and harmonic vibrational frequencies demonstrate the accuracy and efficacy of the j-adapted spin–orbit contraction scheme.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗