Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSULTANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Challenges to EIA consultants whilst dealing with stakeholders in Punjab, Pakistan

Highlights: • EIA in Punjab is subject to influence by elites as a result of which projects are implemented prior to EIA. • Proponents consider EIA as hindrance to project development • Lack of EPA resources lead to delayed decision making • Consultants tend to compromise the EIA quality in order to profitably run their setup. • EIA implementation is weak because Environmental Protection Agency (EPA) lacks capacity to enforce legislation - Abstract: Consultants play a pivotal role in the Environmental Impact Assessment (EIA) process because they are the ones who carry out assessments, deal with multiple stakeholders and thus face the most pressure. Considering the ineffectiveness of the EIA process, the current study attempts to identify the challenges faced by consultants in Punjab whilst dealing with stakeholders. Participant observation, professional practice and unstructured interviews were employed as data collection methods. Key challenges identified include the lack of equal treatment, insufficient capability of Environmental Protection Agency (EPA) and consultants, and the lack of awareness on the parts of the proponents and the public. Legislations accompanied with procedural controls exist in Punjab regarding EIA but the implementation is weak. A strong political will is necessary for implementation of EIA rules and regulation, awareness of the proponents and the public and capacity building of EPA. Registration and accreditation can help bring competent consultants in the field who can improve the process.

54 ENVIRONMENTAL SCIENCES↗

Insights from an international stakeholder consultation to identify informational needs related to seafood safety

Food safety assessment and communication have a strong importance in reducing human health risks related to food consumption. The research carried out within the ECsafeSEAFOOD project aims to assess seafood safety issues, mainly related to non-regulated priority environmental contaminants, and to evaluate their impact on public health. In order to make the research results accessible and exploitable, and to respond to actual stakeholders' demands, a consultation with international stakeholders was performed by means of a survey. The focus was on policy and decision makers, food producers and processors, and agencies (i.e. EU and National or Regional agencies related to Food Safety or Public Health) and consumer organisations. The survey considered questions related to: seafood safety assessment and mitigation strategies, availability of data, such as the level of information on different contaminants, and communication among different stakeholder groups. Furthermore, stakeholders were asked to give their opinion on how they believe consumers perceive risks associated with environmental contaminants. The survey was distributed to 531 key stakeholders and 91 responses were received from stakeholders from 30 EU and non-EU countries. The main results show that communication between different groups of stakeholders needs to be improved and that there is a deficit of information and data in the field of seafood safety. This pertains mainly to the transfer of contaminants between the environment and seafood, and to the diversity of environmental contaminants such as plastic additives, algal toxins and hormones. On-line tools were perceived to be the most useful communication channel. - Highlights: • We consulted stakeholders to identify their needs about seafood safety. • An on-line survey was prepared and sent to gather stakeholders' opinions. • Communication among stakeholders needs to be improved. • There is a deficit of information and data in the field of seafood safety. • On-line tools are perceived to be the most useful communication channel.

54 ENVIRONMENTAL SCIENCES↗

Chair Report Consultancy Meeting on Nuclear Security Assessment Methodologies (NUSAM) Transport Case Study Working Group

The purpose of the consultancy assignment was to (i) apply the NUSAM assessment methods to hypothetical transport security table top exercise (TTX) analyses and (ii) document its results to working materials of NUSAM case study on transport. A number of working group observations, using the results of TTX methodologies, are noted in the report.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

R-Matrix Codes for Charged-Particle Induced Reactions in the Resolved Resonance Region (3), Summary Report of an IAEA Consultants' Meeting IAEA Headquarters, Vienna, Austria, 28-30 June 2017

A Consultants Meeting was held at the IAEA Headquarters, from 28 to 30 June 2017, to discuss the results of a test exercise that had been defined and assigned to all participants of the previous meeting held in December 2016. Five codes were used in this exercise: AMUR, AZURE2, RAC, SFRESCO and SAMMY. The results obtained from these codes were compared and further actions were proposed. Participants’ presentations and technical discussions, as well as proposed additional actions have been summarized in this report.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consultancy on Large-Scale Submerged Aerobic Cultivation Process Design - Final Technical Report: February 1, 2016 -- June 30, 2016

NREL is developing an advanced aerobic bubble column model using Aspen Custom Modeler (ACM). The objective of this work is to integrate the new fermentor model with existing techno-economic models in Aspen Plus and Excel to establish a new methodology for guiding process design. To assist this effort, NREL has contracted Genomatica to critique and make recommendations for improving NREL's bioreactor model and large scale aerobic bioreactor design for biologically producing lipids at commercial scale. Genomatica has highlighted a few areas for improving the functionality and effectiveness of the model. Genomatica recommends using a compartment model approach with an integrated black-box kinetic model of the production microbe. We also suggest including calculations for stirred tank reactors to extend the models functionality and adaptability for future process designs. Genomatica also suggests making several modifications to NREL's large-scale lipid production process design. The recommended process modifications are based on Genomatica's internal techno-economic assessment experience and are focused primarily on minimizing capital and operating costs. These recommendations include selecting/engineering a thermotolerant yeast strain with lipid excretion; using bubble column fermentors; increasing the size of production fermentors; reducing the number of vessels; employing semi-continuous operation; and recycling cell mass.

09 BIOMASS FUELS↗

Final report on the MAGARC software consulting support contract (WFO No. 15904) for ITER magnet safety assessment

he ITER (not an acronym but Latin for "the Way”) International Organization (IO) is building a large-scale scientific experiment that is now under construction in Cadarache, France. The ITER Tokamak fusion reactor aims to demonstrate that it is possible to produce energy from fusion. The ITER’s power output goal is to deliver ten times the power it consumes. During its operational lifetime, ITER will test key technologies necessary for the next step: the demonstration fusion power plant that will prove that it is possible to capture fusion energy for commercial use. General information on the ITER project can be found at http://www.iter.org. The ITER reactor’s superconducting magnet systems create ~41GJ of stored magnetic field energy when fully energized. The consequences of such energy dissipating via electrical arcs under faulted conditions gives rise to safety concerns even though these fault events are extremely unlikely. As part of the ITER licensing procedure, and as a result of such safety concerns, this contract was established to benchmark a developing magnet safety analysis tool at Culham Centre for Fusion Energy against the MAGARC computer code. MAGARC was developed by the U.S. Idaho National Laboratory (INL) under the ITER Engineering Design Activity (EDA) Project and was applied to produce previous analyses, in order to support magnet fault and safety assessment for the ITER design description document. This contract report documents the completion of requested modifications to the MAGARC code by the ITER IO, a time-step size sensitivity analysis with MAGARC during an unmitigated quench event, a comparison of the modeling approaches taken in developing MAGARC and the CCFE analysis package, and the data required for the benchmarking activity for these codes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Transmittal of Draft Consultation Letter to the New Mexico State Historic Preservation Officer Regarding the Proposed Loading Dock to Conference Room Conversion Building 303 at Technical Area 16

The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Los Alamos Field Office (NA-LA) proposes to enclose the existing loading dock to create a conference room at building 303, located within Technical Area (TA) 16, Los Alamos National Laboratory (LANL). TA-16-303 has been determined eligible for listing in the National Register of Historic Places in correspondence with the New Mexico State Historic Preservation Division dated June 22, 2003. Eligibility status is based on its historical significance during the Cold War at Los Alamos and its representative architectural style, which is associated with high explosives research and development in support of the nation’s nuclear weapons program. As shown in the enclosed photograph, key architectural elements include a flat roof with overhangs, unpainted reinforced-concrete construction, green painted doors and trim.

99 GENERAL AND MISCELLANEOUS↗

Consulting on HTGR Design and Analysis Methods - Lommers

The Advanced Reactor Technologies – Gas Cooled Reactor (ART-GCR) program has undertaken an effort to develop point designs of a gas-cooled, graphite moderated irradiation test reactor (TR) and a larger demonstration reactor (DR). The Department of Energy (DOE) is specifying requirements and performance metrics for these two systems. Both designs pose challenges, and their development will benefit from interaction with a potential vendor. The work defined in this subcontract supports the effort to generate point designs for gas-cooled test and demonstration reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗