SEARCH · Engineering Papers
Results for “CASH FLOW”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Infrastructure Analysis Tools: A Focus on Cash Flow Analysis (Presentation)
NREL has developed and maintains a variety of infrastructure analysis models for the U.S. Department of Energy. Business case analysis has recently been added to this tool set. This presentation focuses on cash flow analysis. Cash flows depend upon infrastructure costs, optimized spatially and temporally, and assumptions about financing and revenue. NREL has incorporated detailed metrics onfinancing and incentives into the models. Next steps in modeling include continuing to collect feedback on regional/local infrastructure development activities and 'roadmap' dynamics, and incorporating consumer preference assumptions on infrastructure to provide direct feedback between vehicles and station rollout.
A cash flow model of an integrated industrial CCS-EOR project in a petrochemical corridor: A case study in Louisiana
Petroleum refineries and petrochemical plants are major CO 2 sources, however, they are also significant capital and employment assets that are unlikely to be replaced in the near term. As a result, nations and states that are interested in reducing the carbon intensity of their economies will need to find ways to reduce the emissions of their existing industrial capacity. Industrial carbon capture provides one potential mechanism for reducing the carbon intensity of existing industrial facilities, however, an economically feasible capture system requires that the captured CO 2 be integrated into a system of transport and storage with income generated either through tax credits, enhanced oil recovery (EOR), or both. Here, we present a cash-flow model of an integrated system with industrial capture, pipeline transport, and EOR, and we parameterize the model with data from Louisiana. Given a 50/bbl oil price, an integrated capture, transport and EOR system that uses ethylene oxide production, ammonia production, or natural gas processing as sources is predicted to have a net present value of about $500 million; hydrogen-based capture has a cash flow of -214 given the same assumptions. Further, we find that the recent 45Q Tax Credit expansion has a positive impact on the cash flow of the system but does not change the overall profitability of the systems under the specified assumptions such that without the tax credits natural gas processing, ammonia production and ethylene oxide production-based capture systems remain cost-effective, while hydrogen-based capture remains unprofitable with or without the tax credit.
Evaluating Investments in Natural Gas Vehicles and Infrastructure for Your Fleet: Vehicle Infrastructure Cash-Flow Estimation -- VICE 2.0; Clean Cities, Energy Efficiency & Renewable Energy (EERE)
Presentation by Senior Engineer John Gonzales on Evaluating Investments in Natural Gas Vehicles and Infrastructure for Your Fleet using the Vehicle Infrastructure Cash-flow Estimation (VICE) 2.0 model.
Vehicle Infrastructure Cash-Flow Estimation--VICE 2.0; Clean Cities, Energy Efficiency & Renewable Energy (EERE)
This presentation discusses the differences between the original Vehicle and Infrastructure Cash-Flow Evaluation (VICE) Model and the revamped version, VICE 2.0. The enhanced tool can now help assess projects to acquire vehicles and infrastructure, or to acquire vehicles only.
ESPC Overview: Cash Flows, Scenarios, and Associated Diagrams for Energy Savings Performance Contracts
This document is meant to inform state and local decision makers about the process of energy savings performance contracts, and how projected savings and allocated energy-related budgets can be impacted by changes in utility prices.
ESPC Overview: Cash Flows, Scenarios, and Associated Diagrams for Energy Savings Performance Contracts
This document is meant to inform state and local decision makers about the process of energy savings performance contracts, and how projected savings and allocated energy-related budgets can be impacted by changes in utility prices.
PV Value - A Discounted Cash Flow Approach to Valuing Solar Photovoltaic Systems on Residential and Commercial Properties.
Abstract not provided.
Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)
TEAL Output Visualization
Tool for Economic Analysis (TEAL) is an open-source economics calculation package written and maintained by Idaho National Laboratory (INL). As a plugin of the Risk Analysis Virtual ENvironment (RAVEN), TEAL provides economics analysis models to RAVEN workflow users. In addition, TEAL is used in other RAVEN plugins such as LOGOS and the Holistic Energy Resource Optimization Network (HERON) to complement other analyses with economic calculations. This report documents the efforts in developing the capability of TEAL output visualization for users to better understand and investigate TEAL simulation results. In the past, outputs (e.g., various cash flows) were generated and printed to screen. According to the need and purpose for visualization, users can select various bar charts and donut charts to visualize the cash flows including inflows, outflows, and net cash flows in each year or in a selected time range, in addition to observing data stored in comma-separated value files (CSVs). The visualization capability is flexible and user-friendly by introducing several user-defined parameters, for instance, the start and the end project year of interest and the type of colors to be assigned to the cash flows.
Valuation of Indonesian catastrophic earthquake bonds with generalized extreme value (GEV) distribution and Cox-Ingersoll-Ross (CIR) interest rate model
Indonesia is a country with high risk of earthquake, because of its position in the border of earth’s tectonic plate. An earthquake could raise very high amount of damage, loss, and other economic impacts. So, Indonesia needs a mechanism for transferring the risk of earthquake from the government or the (reinsurance) company, as it could collect enough money for implementing the rehabilitation and reconstruction program. One of the mechanisms is by issuing catastrophe bond, ‘act-of-God bond’, or simply CAT bond. A catastrophe bond issued by a special-purpose-vehicle (SPV) company, and then sold to the investor. The revenue from this transaction is joined with the money (premium) from the sponsor company and then invested in other product. If a catastrophe happened before the time-of-maturity, cash flow from the SPV to the investor will discounted or stopped, and the cash flow is paid to the sponsor company to compensate their loss because of this catastrophe event. When we consider the earthquake only, the amount of discounted cash flow could determine based on the earthquake’s magnitude. A case study with Indonesian earthquake magnitude data show that the probability of maximum magnitude can model by generalized extreme value (GEV) distribution. In pricing this catastrophe bond, we assumed stochastic interest rate that following the Cox-Ingersoll-Ross (CIR) interest rate model. We develop formulas for pricing three types of catastrophe bond, namely zero coupon bonds, ‘coupon only at risk’ bond, and ‘principal and coupon at risk’ bond. Relationship between price of the catastrophe bond and CIR model’s parameter, GEV’s parameter, percentage of coupon, and discounted cash flow rule then explained via Monte Carlo simulation.
Impact of Large Scale Energy Efficiency Programs On Consumer Tariffs and Utility Finances in India
Large-scale EE programs would modestly increase tariffs but reduce consumers' electricity bills significantly. However, the primary benefit of EE programs is a significant reduction in power shortages, which might make these programs politically acceptable even if tariffs increase. To increase political support, utilities could pursue programs that would result in minimal tariff increases. This can be achieved in four ways: (a) focus only on low-cost programs (such as replacing electric water heaters with gas water heaters); (b) sell power conserved through the EE program to the market at a price higher than the cost of peak power purchase; (c) focus on programs where a partial utility subsidy of incremental capital cost might work and (d) increase the number of participant consumers by offering a basket of EE programs to fit all consumer subcategories and tariff tiers. Large scale EE programs can result in consistently negative cash flows and significantly erode the utility's overall profitability. In case the utility is facing shortages, the cash flow is very sensitive to the marginal tariff of the unmet demand. This will have an important bearing on the choice of EE programs in Indian states where low-paying rural and agricultural consumers form the majority of the unmet demand. These findings clearly call for a flexible, sustainable solution to the cash-flow management issue. One option is to include a mechanism like FAC in the utility incentive mechanism. Another sustainable solution might be to have the net program cost and revenue loss built into utility's revenue requirement and thus into consumer tariffs up front. However, the latter approach requires institutionalization of EE as a resource. The utility incentive mechanisms would be able to address the utility disincentive of forgone long-run return but have a minor impact on consumer benefits. Fundamentally, providing incentives for EE programs to make them comparable to supply-side investments is a way of moving the electricity sector toward a model focused on providing energy services rather than providing electricity.
Benefit Analysis of CO 2 Delivery Options for Offshore Storage or Enhanced Oil Recovery
The analysis presented in this report evaluates the benefits of CO₂ offshore transport via pipeline or ship within the GOM. It takes a top-down framework to estimate the costs. First, this analysis designed a reduced-order model (ROM) based on the cash flows in the FECM/NETL CO₂ Transport Cost Model (also known as CO2_T_COM). The ROM takes capital expenses (CAPEX) and operating expenses (OPEX) to calculate the CO₂ breakeven price based on the cash flows. Second, this analysis developed regression models utilizing published data from other analyses to estimate CAPEX and OPEX. Since the ROM is a simplified cash flow calculation, it is easy to exchange the core regression models to estimate various costs. The ROM and regression models provided a framework that can be easily used by other researchers, decision-makers, operators, and regulators. The objective of this analysis is to assess the CO₂ breakeven cost range for pipeline and ship transport of captured CO₂ given the CO₂ source and storage reservoir located in the GOM.
Nuclear Integrated Hydrogen Production Analysis Tool
This is an Excel-based time-independent discount cash flow calculator for LWR-HTSE systems. The tool incorporates (1) discounted cash flow and levelized cost of hydrogen (LCOH) analysis, (2) sensitivity analysis with respect to select financial performance metrics with output ‘tornado’ charts, (3) profitability analysis represented by heat maps using the two most sensitive parameters, (4) electricity versus hydrogen production preference analysis by comparing change in net present value (?NPV) between NPP-HTSE and business-as-usual electricity production for the grid, and (5) competitiveness analysis by comparing the calculated LCOH for NPP-HTSE with that of steam methane reforming, which is the conventional process to produce hydrogen.
On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints
The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)
TEAL
TEAL is a financial performance calculator plugin for the RAVEN code, framework, resolving around the computation of Net Present Value and associated financial metrics. TEAL can make use of inflation rates, taxation, escalation factors, capital expenditure economy of scale scaling factors. The unique feature of TEAL is the capability to be linked with RAVEN external models and build corresponding cash flows using the variables computed by those external models. In addition to be able to use the capability to generate cash flows derived from complex physical models generated by RAVEN, another distinctive feature of TEAL is the capability to provide financial risk/probabilistic metrics that can empower RAVEN to perform optimization/analysis driven by financial risk augmentations. Optimization, robust optimization, parametric studies, large parallel simulations, sensitivity analysis, data mining, etc. are just some of the capabilities that can be leveraged.
IEA Wind Task 26. Wind Technology, Cost and Performance Trends in Denmark, Germany, Ireland, Norway, the European Union, and the United States. 2007 - 2012
This report builds from a similar previous analysis (Schwabe et al., 2011) exploring the differences in cost of wind energy in 2008 among countries participating in IEA Wind Task 26 at that time. The levelized cost of energy (LCOE) is a widely recognized metric for understanding how technology, capital investment, operations, and financing impact the life-cycle cost of building and operating a wind plant. Schwabe et al. (2011) apply a spreadsheet-based cash flow model developed by the Energy Research Centre of the Netherlands (ECN) to estimate LCOE. This model is a detailed, discounted cash flow model used to represent the various cost structures in each of the participating countries from the perspective of a financial investor in a domestic wind energy project. This model is used for the present analysis as well, and comparisons are made for those countries who contributed to both reports, Denmark, Germany, and the United States.
Framework for the Economic Analysis of Hybrid Systems Based on Exergy Consumption
Starting from an overview of the dynamic behavior of the electricity market the need of the introduction of energy users that will provide a damping capability to the system is derived as also a qualitative analysis of the impact of uncertainty, both in the demand and supply side, is performed. Then it follows an introduction to the investment analysis methodologies based on the discounting of the cash flow, and then work concludes with the illustration and application of the exergonomic principles to provide a sound methodology for the cost accounting of the plant components to be used in the cash flow analysis.