Results for “CAPITALIZED COST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Capital cost estimate

The capital cost estimate for the nuclear process heat source (NPHS) plant was made by: (1) using costs from the current commercial HTGR for electricity production as a base for items that are essentially the same and (2) development of new estimates for modified or new equipment that is specifically for the process heat application. Results are given in tabular form and cover the total investment required for each process temperature studied.

Source record↗

Assessing I 2 S-LWR economic competitiveness using systematic differential capital cost evaluation methodology

One of the major factors impeding nuclear power plant (NPP) construction is their economics. In this study, a systematic differential economics evaluation approach was developed through the use of the Code of Accounts guidelines to assess the costs of nuclear power plants. The methodology, entirely based on publicly available data, may serve as a template to evaluate direct costs for reactors of any size and design at any stage of developments. In particular, this approach was used to assess the costs of the Integral Inherently Safe Light Water Reactor (I 2 S-LWR). The I 2 S-LWR is a design concept of a large (~1000 MWe) light water reactor. One of its key design features promoting inherent safety is implementation of an integral primary circuit configuration, which however necessitates a compact design of the core and primary circuit components. Through the methodology here presented, a representative loop PWR design was taken as a reference and the differential cost was estimated for each individual account based on the design difference, or similarity. Cost scaling techniques were applied to the accounts representing systems that differ from the ones of the reference PWR. Cost estimating techniques were used to evaluate cost of innovative components that are not part of standard PWR designs. By evaluating the cost difference of the I 2 S-LWR from the standard PWR, rather than the absolute cost, the uncertainty in the estimate is reduced. A similar approach was used by ORNL to estimate the cost of a Fluoride-salt High-temperature Reactor (FHR). A traditional four-loop PWR plant with a core thermal power of 3417 MWth (1144 MWe) was selected as the reference. Costs for that plant were prepared in 1978 by the Department of Energy (DOE) Energy Economics Data Base (EEDB), averaging actual cost incurred in the construction of several nuclear power plants (NPP), itemized with a great level of detail according to the Code of Accounts. This best estimate costs are denoted PWR12-BE. For each account, the cost of equipment, site labor and site material is provided. Industry experts at Westinghouse Electric Company performed a “sanity check” of the cost items, adjusting the cost of several items to match the current market and supply chain data. The detailed cost assessment of I 2 S-LWR was performed, systematically analyzing cost for each account, and applying the differential economics approach. First, Relative importance of each account, i.e., its contribution to the total cost was established, to help focus analysis on the most significant contributors. Moreover, the accounts describing components that are different than that of the PWR12-BE were identified. The integral configuration of the reactor has important implications on the cost of the reactor plant equipment (accounts 22x). Turbine generator equipment (Accounts 23x) is not believed to be much different than that of the reference design. I 2 S-LWR structures (Accounts 21x) mainly differ from that of a standard LWR as several buildings (containment building, shield building, annex building, waste processing building, fuel storage building) are integrated into a single building (nuclear island). Yardwork has a higher cost for the I 2 S-LWR, as the NI is partially below grade. On the other hand, due to its compact Nuclear Island footprint, I 2 S-LWR facilitates (and includes in its reference version) the use of seismic isolators, which contribute to reducing the direct cost. The total capital investment cost (TCIC), on the $/kW basis, of I 2 S-LWR is 5.84% lower than that of PWR12-BE, in spite of the lower power output of I 2 S-LWR. However, for the Western US (0.7 g), benefits of the seismic isolation are more pronounced, and the I 2 S-LWR total capital investment cost is 13.02% lower than that of PWR12-BE. If the I 2 S-LWR is compared to a PWR10-BE (traditional loop design, but scaled to the same power level as I 2 S-LWR), the savings are even higher, in the range 11.12%–17.89%. The analysis indicates that I 2 S-LWR has potential to offer an economically attractive design, with TCIC lower than that of a nuclear power plant based on a traditional loop PWR design. In other words, I 2 S-LWR design offers significantly enhanced safety, while at the same time improving economics. The differential economics approach developed in this paper can be used in identifying changes in cost of key components in order to improve the economics of a nuclear reactor design. The method can also help compare the economics of advanced Generation IV reactors and innovative water-cooled SMR (Small Modular Reactors) with respect to standard LWR technologies. In summary, the differential economics approach and can be used as a tool capable of helping stakeholder decisions.

Economic↗

Modeling Electric Generation Capital Costs with Uncertain Future CO 2 Pricing

As new environmental regulations are reevaluated and various tax subsidies begin to expire, the outlook for investors in power generation may be more uncertain than ever. There are many electric power generation studies and forecasts published by a wide array of entities from private consulting firms to government agencies and national labs. These studies show which power generation technologies are favored to be constructed under the assumptions within each future scenario, and many people in businesses and government use these studies for planning purposes and decision-making. One common need for assumptions in these studies is the rate of return investors will require for constructing new generation. It is shown in this paper that for each one percent added to the cost of capital (CoC) above a base level, the levelized cost of electricity (LCOE) increases by 1-to-4 percent for generation with a 30-year life and debt term, a length commonly used for conventional generation. Therefore, if analysts make a distinction in the CoC for different technologies without quantitative support, it could result in misleading technologies being chosen as favored when facing regulatory uncertainty. The practice of adding a penalty (percentage adder) to the CoC was initially discovered in the Annual Energy Outlook, published by the U.S. Energy Information Administration (EIA). This paper presents the framework typically used in scenario analysis for selecting a CoC, consistent with the practice in long-range planning models that seek to identify the best future generation technologies for meeting electricity demand. Examples are provided on why full specification and consistency is necessary to obtain accurate results for any scenario. It is also shown in this paper how the mischaracterization of regulatory uncertainty to address the uncertainty about CO2 mitigation in a scenario can lead to a misleading outcome when applying a risk penalty to the CoC. The analysis presented shows that applying a 3-percentage penalty to the CoC for fossil generation implies a different price per ton for each generation technology, which suggests the uncertainty about CO2 regulations would best be addressed through pricing sensitivity analyses rather than penalties added to the CoC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quality Guidelines for Energy System Studies: Capital Cost Scaling Methodology (Revision 4 Report)

NETL regularly updates legacy analysis with new studies as the Department of Energy objectives change, technology performance improves, costs are reduced, regulations change, market drivers are established, fuel prices fluctuate, and any number of other relevant factors vary in the market. As legacy studies are updated by NETL, the underlying performance and cost of the cases changes, and the methods for interpreting and scaling the cost estimates change. Therefore, it is important that NETL maintain public guidance documents associated with different sets of cost estimates that delineate how a specific set should be scaled. This QGESS report, providing guidance on capital cost scaling, should generally be applied to NETL case costs included in the report “Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity Revision 4” (BBR4), or any cases derived from the cases presented in the referenced report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy

Estimating the overall costs of transmission needed to integrate variable renewable energy (VRE) onto the grid is challenging. An improved understanding of these transmission costs would support electricity system planning as VRE penetrations increase. This paper brackets VRE transmission capital costs using multiple approaches based on interconnection studies, actual transmission projects, capacity-expansion simulation models, and aggregated U.S. VRE-related transmission expenditures. Each approach possesses advantages and drawbacks, and combining the approaches lends confidence to the results. The resulting range of average levelized VRE transmission costs is 1– 10 dollars/MWh, which is generally lower than earlier estimates in the literature. These transmission capital costs can increase the direct plant-level levelized cost of VRE by 3%–33%, based on levelized costs of energy of 29– 56 dollars/MWh for utility-scale wind and 36–46 dollars/MWh for utility-scale solar. As VRE deployment continues to expand, policy makers can use this information to (1) assess the benefits of transmission avoidance and deferral when comparing distributed energy resources versus utility-scale projects, (2) evaluate the potential costs of large-scale public transmission investments, and (3) better analyze system-level costs of utility-scale VRE technologies. Future research can expand on the framework presented here by providing a review of operation and maintenance costs for transmission systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Single-column cryogenic air separation: Enabling efficient oxygen production with rapid startup and low capital costs—application to low-carbon fossil-fuel plants

The rapid integration of intermittent renewable sources into the electricity grid is driving the need for more flexible, low-carbon fossil-fuel plants with lower capital costs. This then drives the need to improve the cryogenic air separation unit (ASU). To address this changing landscape, we explore a Praxair single-column ASU (PSC-ASU) design with the goal of reducing costs and improving flexibility, compared to a conventional double-column ASU. The PSC-ASU incorporates partial air condensation and air pre-separation in the bottom reboiler with a phase separator as well as N 2 -enriched vapor condensation in the upper reboiler to decrease energy consumption, as compared to Linde’s single-column ASU. All three of the above-mentioned ASU designs are simulated in Aspen Plus and analyzed. An economic analysis is applied to evaluate the relative cost savings of the PSC-ASU compared to the double-column ASU. Results suggest that the specific energy consumption of the PSC-ASU is significantly lower than that of Linde’s single-column ASU due to a drastically improved oxygen recovery rate. Although this improved oxygen recovery rate is still lower than that of the double-column ASU, the required pressure ratio of the main air compressor is 21% lower than that of the double-column ASU. As a result, the specific energy consumption of the PSC-ASU is only 1.9% greater than that of the double-column ASU for producing 95.1 mol% O 2 . However, the PSC-ASU reduces the hourly capital cost by 19% due to the elimination of a high-pressure column. This would effectively decrease the total hourly cost of the ASU, and thus the total hourly cost of low-carbon, fossil-fuel power plants that require oxygen.

20 FOSSIL-FUELED POWER PLANTS↗

Single-column cryogenic air separation: enabling efficient oxygen production with rapid startup and low capital costs—application to low-carbon fossil-fuel plants

The rapid integration of intermittent renewable sources into the electricity grid is driving the need for more flexible, low-carbon fossil-fuel plants with lower capital costs. This then drives the need to improve the cryogenic air separation unit (ASU). To address this changing landscape, we explore a Praxair single-column ASU (PSC-ASU) design with the goal of reducing costs and improving flexibility, compared to a conventional double-column ASU. The PSC-ASU incorporates partial air condensation and air pre-separation in the bottom reboiler with a phase separator as well as N2-enriched vapor condensation in the upper reboiler to decrease energy consumption, as compared to Linde's single-column ASU. All three of the above-mentioned ASU designs are simulated in Aspen Plus and analyzed. An economic analysis is applied to evaluate the relative cost savings of the PSC-ASU compared to the double-column ASU. Results suggest that the specific energy consumption of the PSC-ASU is significantly lower than that of Linde's single-column ASU due to a drastically improved oxygen recovery rate. Although this improved oxygen recovery rate is still lower than that of the double-column ASU, the required pressure ratio of the main air compressor is 21% lower than that of the double-column ASU. As a result, the specific energy consumption of the PSC-ASU is only 1.9% greater than that of the double-column ASU for producing 95.1 mol% O2. However, the PSC-ASU reduces the hourly capital cost by 19% due to the elimination of a high-pressure column. This would effectively decrease the total hourly cost of the ASU, and thus the total hourly cost of low-carbon, fossil-fuel power plants that require oxygen.

Cheng, Mao↗

Reducing the Overnight Capital Cost of Advanced Reactors Using Equipment-Level Seismic Protective Systems

Consideration of the effects of earthquake shaking on the design and construction of nuclear power plants adds substantially to the overnight capital cost, with anecdotal estimates as high as 35+%, attributed to additional construction materials, need for one-off and sub-optimal designs of equipment due to conflicting design choices, the high cost of seismic qualification of equipment, and regulatory review. Safety-critical equipment in large light water reactors is designed and qualified for seismic demands imposed by the supporting reactor building, optimal mechanical designs are not possible, and designs of a given piece of equipment may vary with height above grade. Similar negative impacts are expected for advanced reactors unless the seismic design paradigm is changed. The overarching goal of this transformational MEITNER project, which involved a multidisciplinary engineering team and designers of three fundamentally different advanced reactors, was to adapt proven seismic isolation and damping technologies to operationalize modular protective systems for safety-class equipment inside advanced reactor buildings. Such seismic protective systems would be tightly integrated into design development for reactor support systems and balance-of-plant construction. The adoption of the technology, which is widely used in non-nuclear sectors, would simplify plant design, enable the use of standardized equipment and buildings, optimized for operational performance, and reduce plant size and weight. The need for site-specific equipment would be eliminated, enabling identical equipment to be used across multiple plants sited across the US and economies of scale, and catalyzing new interest and investment. The equipment-based protective systems would allow siting of advanced reactors in regions of high seismic hazard.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quality Guidelines for Energy System Studies: Capital Cost Scaling Methodology: Revision 4b Report

The National Energy Technology Laboratory (NETL) regularly updates legacy analysis with new studies and cases as the Department of Energy objectives change, technology performance improves, costs are reduced, regulations change, market drivers are established, fuel prices fluctuate, and any number of other relevant factors vary in the market. As legacy studies are updated by NETL, the underlying performance and cost of the cases presented changes, and as such, the methods for interpreting and scaling the cost estimates change. Therefore, it is important that NETL maintain public guidance documents associated with different sets of cost estimates that delineate how a specific set, based on report vintage and/or year published, should be scaled. This Quality Guidelines for Energy System Studies report, providing guidance on capital cost scaling, should generally be applied to NETL case costs included in the report “Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity Revision 4b,” (NETL, 2025) or any cases derived from the cases presented in the referenced report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers

This paper presents a set of 15 best practices for owners, designers, and construction teams of office buildings to reach high performance goals for energy efficiency, while maintaining a competitive budget. They are based on the recent experiences of the owner and design/build team for the Research Support Facility (RSF) on National Renewable Energy Facility's campus in Golden, CO, which showthat achieving this outcome requires each key integrated team member to understand their opportunities to control capital costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The development of natural gas and hydrogen pipeline capital cost estimating equations

Natural gas pipeline cost data collected by the Oil and Gas Journal (O&GJ) for interstate pipelines constructed from 1980 through 2017 were used to develop capital cost estimating equations that are a function of pipeline diameter, length, and U.S. region. Equations were developed for material, labor, miscellaneous, and right-of-way costs, the four cost components in the O&GJ data, for six different regions of the United States (U.S.). Each equation is a function of pipeline diameter and length. Adjustment mechanisms were then developed for converting the natural gas pipeline equations into equations for estimating the costs of hydrogen pipelines. These adjustments were based in part on an analysis completed by the National Institute for Standards and Technology (NIST). Here the results of this work were used to update cost models in the Hydrogen Delivery Scenario Analysis Model (HDSAM), developed by Argonne National Laboratory for the U.S. Department of Energy’s Hydrogen Program. Our analysis shows a wide range of pipeline cost across different U.S. regions, especially with respect to labor and right-of-way costs. The developed cost formulas for hydrogen pipelines are both important and timely as hydrogen is being considered as a zero-carbon energy carrier with the potential to decarbonize all energy sectors, and the cost of hydrogen transportation is essential for techno-economic analysis of its potential use in these sectors.

03 NATURAL GAS↗

Resource Adequacy and Capital Cost Considerations Pertaining to Large Electric Grids Powered by Wind, Solar, Storage, Gas, and Nuclear

The capacity and generation of wind, solar, storage, nuclear, and gas are estimated for large, idealized copper-plate electric grids. Wind and solar penetrations of 30% to 80% are considered together with different storage systems such as vanadium and lithium-ion batteries, pumped hydroelectric, compressed air, and hydrogen. In addition to a baseline dispatchable fleet without wind/solar, two bounding cases with wind/solar are analyzed: one without storage and one where the whole wind/solar fleet is connected to the storage system, hence providing a buffer between the wind/solar fleet and the grid. The reality will likely be somewhere between these bounding cases. The viability of a power grid with a large wind/solar penetration and no storage is not guaranteed but was nonetheless considered to provide a lower-bound capital cost estimate. Overall, the options that rely strongly on wind, solar, and storage could be significantly more capital-intensive than those that rely strongly on nuclear, depending on the amount of storage necessary to ensure grid stability. This is especially true in the long run because wind, solar, and storage assets have shorter lifetimes than nuclear plants and, consequently, need to be replaced more frequently. More analyses (e.g., grid stability and public acceptance) are necessary to determine which option is most likely to provide the path of least resistance to powering a clean, affordable, and reliable grid in a timely manner. Depending on the priorities, the path of least resistance may not necessarily be the one that is less capital intensive.

adequacy↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

EXPERT ELICITATION OF ACROSS-TECHNOLOGY CORRELATIONS FOR REACTOR CAPITAL COSTS

Calculations of the uncertainty in the Levelized Cost at Equilibrium (LCAE) of generating nuclear electricity typically assume that the costs of the system component, notably reactors, are uncorrelated. Partial cancellation of independent errors thus gives rise to unrealistically small cost uncertainties for fuel cycles that incorporate multiple reactor technologies. This summary describes an expert elicitation of correlations between overnight reactor construction costs. It also defines a method for combining the elicitations into a single, consistent correlation matrix suitable for use in Monte Carlo LCAE calculations. Both the elicitation and uncertainty propagation methods are demonstrated through a pilot study where cost correlations between eight reactor technologies were elicited from experts in the US DOE Fuel Cycle Research

99 GENERAL AND MISCELLANEOUS↗

Quality Guidelines for Energy System Studies: Capital Cost Scaling Methodology

The purpose of this section of the Quality Guidelines is to provide a standard basis for scaling costs, with specific emphasis on scaling exponents. The intention of having a standardized document is to provide guidelines for proper procedures to reduce the potential of errors and increase credibility through consistency. This document contains a listing of frequently used pieces of equipment and their corresponding scaling exponent for various plant types, along with their ranges of applicability. This document also details the equations to be used with each exponent.

20 FOSSIL-FUELED POWER PLANTS↗