Characterization of Tank 9H Salt Dissolution Batch 2B in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations
Savannah River Mission Completion (SRMC) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The second batch of salt to make up processing Batch 2 (Batch 2B) has recently been dissolved in Tank 9H and transferred to Tank 10H where it was composited with the first part of the batch (Batch 2A) in preparation for processing through the TCCR 1A unit. Savannah River National Laboratory (SRNL) received samples from the recent batch (2B) of dissolved salt for characterization. Two samples from Batch 2B were received for characterization, a surface sample and a variable depth sample (VDS). Neither sample contained significant solids, although the VDS appeared slightly cloudy as compared to the surface sample. The sodium concentrations of both the surface and VDS filtrate samples were approximately 5.8 M, and the 137 Cs activity was 9.8E+07 dpm/mL in the surface sample and 9.5E+07 dpm/mL in the VDS. The total Cs concentrations were 2.5 mg/L and 2.4 mg/L in the surface sample and VDS, respectively, using the gamma activity and the Cs isotopic ratios determined by ICP-MS. The alpha activity was below the detection limit in both samples. Nitrate was the dominant anion present, and the samples were primarily concentrated sodium nitrate solutions with hydroxide, nitrite, and carbonate present at 0.1 – 0.2 M. In general, the Batch 2B samples were more dilute than the previously characterized Batch 2A samples.