US Global Change Research Program Distributed Cost Budget Interagency Funds Transfer from DOE to NSF

These funds were transferred from DOE to NSF as DOE's contribution to the U.S. Global Change Research Program in support of 4 internationalnactivities/programs as approved by the U.S. Global Change Research Program on 14 March 2014. The programs are the International Geosphere-Biosphere Programme, the DIVERSITAS programme, and the World Climate Research Program. All program awards ended as of 09-23-2015.

99 GENERAL AND MISCELLANEOUS↗

Office of the Chief Financial Officer 2012 Annual Report

Fiscal Year 2012 was a year of progress and change in the Office of the Chief Financial Officer (OCFO) organization. The notable accomplishments outlined below strengthened the quality of the OCFO’s stewardship and services in support of the scientific mission of Lawrence Berkeley National Laboratory (LBNL). Three strategies were key to this progress: organizational transformation aligned with our goals; process redesign and effective use of technology to improve efficiency, and innovative solutions to meet new challenges. Over the next year we will continue to apply these strategies to further enhance our contributions to the Lab’s scientific mission. What follows is the budget, funding and costs for the office for FY 2012.

2012↗

Sustainable Energy Solutions for Rural Alaska

The state of Alaska recognizes the challenges these rural communities face and provides financial support via the Power Cost Equalization (PCE) program. The PCE subsidizes the electricity prices paid by customers of these high-cost utilities. The PCE program is designed to spread the benefits of Alaska’s natural resources more evenly throughout the state. Yet even with this subsidy, electricity is still much more expensive for these rural customers. And beyond the PCE, other forms of assistance to rural utilities are becoming scarce given the state’s current fiscal environment. Nearly 90 percent of Alaska’s unrestricted budget funds in recent years have been tied to oil royalties—a sector experiencing significant declines in production and oil prices. Consequently, as Alaska looks to tighten budgets, the challenge of lowering rural utility costs, while encouraging self-sufficiency, has become more urgent.This study examines reliability, capital and strategic planning, management, workforce development, governance, financial performance and system efficiency in the various communities visited by the research team. Using those attributes, a tier system was developed to categorize rural Alaska utilities into Leading and Innovating Systems (Tier I), Advanced Diesel Systems (Tier II), Basic Systems (Tier III), and Underperforming Systems (Tier IV). The tier approach is not meant to label specific utilities, but rather to provide a general set of benchmarks and guideposts for improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Investigation of Pressurized Entrained-Flow Kraft Black Liquor Gasification in an Industrially Relevant Environment

The University of Utah's project 'Investigation of Pressurized Entrained-Flow Kraft Black Liquor Gasification in an Industrially Relevant Environment' (U.S. DOE Cooperative Agreement DE-FC26-04NT42261) was a response to U.S. DOE/NETL solicitation DE-PS36-04GO94002, 'Biomass Research and Development Initiative' Topical Area 4-Kraft Black Liquor Gasification. The project began September 30, 2004. The objective of the project was to improve the understanding of black liquor conversion in high pressure, high temperature reactors that gasify liquor through partial oxidation with either air or oxygen. The physical and chemical characteristics of both the gas and condensed phase were to be studied over the entire range of liquor conversion, and the rates and mechanisms of processes responsible for converting the liquor to its final smelt and syngas products were to be investigated. This would be accomplished by combining fundamental, lab-scale experiments with measurements taken using a new semi-pilot scale pressurized entrained-flow gasifier. As a result of insufficient availability of funds and changes in priority within the Office of Biomass Programs of the U.S. Department of Energy, the research program was terminated in its second year. In total, only half of the budgeted funding was made available for the program, and most of this was used during the first year for construction of the experimental systems to be used in the program. This had a severe impact on the program. As a consequence, most of the planned research was unable to be performed. Only studies that relied on computational modeling or existing experimental facilities started early enough to deliver useful results by the time to program was terminated Over the course of the program, small scale (approx. 1 ton/day) entrained-flow gasifier was designed and installed at the University of Utah's off-campus Industrial Combustion and Gasification Research Facility. The system is designed to operate at pressures as high as 32 atmospheres, and at temperatures as high as 1500 C (2730 F). Total black liquor processing capacity under pressurized, oxygen-blown conditions should be in excess of 1 ton black liquor solids per day. Many sampling ports along the conversion section of the system will allow detailed analysis of the environment in the gasifier under industrially representative conditions. Construction was mostly completed before the program was terminated, but resources were insufficient to operate the system. A system for characterizing black liquor sprays in hot environments was designed and constructed. Silhouettes of black liquor sprays formed by injection of black liquor through a twin fluid (liquor and atomizing air) nozzle were videoed with a high-speed camera, and the resulting images were analyzed to identify overall characteristics of the spray and droplet formation mechanisms. The efficiency of liquor atomization was better when the liquor was injected through the center channel of the nozzle, with atomizing air being introduced in the annulus around the center channel, than when the liquor and air feed channels were reversed. Atomizing efficiency and spray angle increased with atomizing air pressure up to a point, beyond which additional atomizing air pressure had little effect. Analysis of the spray patterns indicates that two classifications of droplets are present, a finely dispersed 'mist' of very small droplets and much larger ligaments of liquor that form at the injector tip and form one or more relatively large droplets. This ligament and subsequent large droplet formation suggests that it will be challenging to obtain a narrow distribution of droplet sizes when using an injector of this design. A model for simulating liquor spray and droplet formation was developed by Simulent, Inc. of Toronto. The model was able to predict performance when spraying water that closely matched the vendor specifications. Simulation of liquor spray indicates that droplets on the order 200-300 microns can be expected, and that higher liquor flow will result in better distribution of liquor in the reactor.

09 BIOMASS FUELS↗

R and D ekes out an increase in FY 2015 budget request

With spending caps in place, President Obama proposes an off-budget fund to support additional R and D. NASA would ground a flying observatory, and DOE would sharply curtail its nonproliferation programs.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Development and Demonstration of a Fuel-Efficient, Class 8 Tractor & Trailer Engine System (SuperTruck II)

Navistar presents the SuperTruck II (ST II) Final Report to the Unites States Department of Energy (US DOE), which covers the five Budget Periods (BPs) from 10-1-2016 through 6-30-2022. For ST II, Navistar built on the achievements of the SuperTruck I (ST I) Program as a catalyst to continue critical research, design and development, testing, and operations to reach the ambitious goals of the ST II project. This approach allowed Navistar to continue contributing to the essential needs of our nation for safe, efficient, and cost-effective delivery of goods and services, as we reduced negative environmental effects and improved operational productivity. This document contains information specified in DOE F 4600.2, Final Scientific/Technical Report DOE F 241.3, B. SCIENTIFIC/TECHNICAL REPORTS, explaining how we met and exceeded program requirements. Throughout this Final Report, Navistar extracted information from documents prepared during the project that represent our management, design and development, building, and testing efforts to meet and exceed SuperTruck II project goals. Navistar followed Plan requirements to achieve / exceed Project Objectives: a) >100% improvement in vehicle freight efficiency (FE) (on ton-MPG basis) relative to 2009 baseline with stretch goal of 140% improvement [actual: 170%); b) >55% engine brake thermal efficiency (BTE) demonstrated in operational engine at a 65-mph cruise point on a dynamometer – ≥31% increase from 2009 baseline [actual: 55.20% of combined BTE) ; and c) development and implementation of commercially cost effective technologies (in terms of a simple payback). Technology selection / development path focused on developing technologies applicable for production within 3-year approach, while ensuring technology readiness and cost of ownership for end users. The Program was organized into five budget periods: Requirements / Technology Assessment and Initial Hardware Testing; Technology Development and Concept Readiness Demonstration; Technology Finalization and Validation Tractor / Trailer Fabrication, Integration and Commissioning Demonstration; and Fuel Economy (FE) and Brake Thermal Efficiency (BTE) and Program Completion. Leadership was provided by DOE, with tasks performed by laboratories (Argonne National Laboratory, Lawrence Livermore National Laboratory); partners at Bosch, TPI, Dana, and J.B. Hunt; , and support from University of Michigan and Clemson University. Navistar lead this team with Principal Investigator / Contracting Officer; Project Manager (PM); Vehicle, Engine, and Aftertreatment Engineers; Finance Manager, Technical Program Leads, and Legal/IP; and other key personnel. Work also included personnel in risk management; funding / budget / finance. Work involved analysis, development, testing, and down selection of individual/system engine, aftertreatment, and vehicle technologies, with integration of selected technologies into a prototype vehicle for demonstration of fuel-efficiency gain. Work also included component/integrated system level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. As ST II progressed, Navistar performed computer-based modeling / simulations of technologies focused on the primary operational areas: Engine, Aftertreatment, and Vehicle. During the ST II Program, the COVID Virus outbreak unexpectedly challenged by the effects of, which affected staffing, scheduling, design, supplies, availability of materials, production procedures, and testing. The DOE responded by extending the program by three quarters to ensure that project tasks were completed for this vital project. Focus continued on analyzing, developing, testing, and down selecting individual-/system-level engine and vehicle technologies for integration of the final selected technologies into a prototype vehicle that would demonstrate fuel-efficiency gains made possible through these technologies. This included component/integrated system-level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, solar power, distributed and intelligent vehicle power, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. Throughout the program, function, reliability, and performance at all levels were ensured through testing. Proof of this approach was demonstrated in multiple, on-road demonstrations: Scenario A (Flatland) Fuel Economy, Scenario B (Hilly) Fuel Economy, and City Cycle Tests. Other benefits derived from ST II included new/improved products, publications, patents, and next-step capabilities related to electric/hydrogen vehicles and autonomous driving.

Zukouski, Russ↗

Final Scientific / Technical Report: Enabling Technologies for Heavy-Duty Vehicles – Cummins 55BTE

The Cummins 55% BTE (55BTE) program has completed the planned technical work on the project. This work includes the planned engine system demonstration in pursuit of the goal of demonstrating a peak system brake thermal efficiency (BTE) of 55%. The engine system included a high efficiency diesel engine integrated with a state-of-the-art waste heat recovery (WHR) system and an advanced aftertreatment system capable of meeting the current emissions standards. While the ultimate program goal of 55% BTE was not fully achieved due to hardware issues during the final testing phase, the program demonstrated a significant increase in reported engine system BTE for a heavy duty sized engine. The previous demonstrations in the Department of Energy funded SuperTruck 1 programs ranged between 50% - 51% BTE. The Cummins 55% BTE program demonstrated 54% BTE. Additionally, the program established a revised path-to-target showing how the system could be improved to reach the ultimate program goal of 55% BTE with some minor modification to the engine system. The changes in the revised path-to-target were unable to be completed during the course of this program due to time and money constraints placed on the program. The program’s goals were challenging in both scope and timing. Although the program’s goal can be simply stated in terms of demonstrating a system efficiency of 55%, the achievement of a heavy-duty diesel engine capable of full torque curve operation, adequate transient performance, low emissions and high brake thermal efficiency (>51% BTE) had not been previously demonstrated in a heavy-duty engine. The closest efforts to date included the SuperTruck 1 programs referenced earlier. The program made several advancements in all system areas. The combustion system was re-designed for a shorter combustion duration and lower in-cylinder heat loss. This was achieved through optimization of the fuel injection rate shape, number of spray holes, piston bowl shape, compression ratio, piston oil cooling, heat flow through the piston and in-cylinder charge motion. The air handling system was re-designed to provide cooled EGR at virtually no pumping penalty. This was achieved through implementation of a dual loop EGR system, reduction of EGR system pressure drop, and implementation of advanced turbocharger efficiency technologies. The engine friction and parasitic signature was dramatically reduced by the program through adoption of variable flow pumps, advanced rings and coatings, rollerized valvetrain, adoption of low viscosity lubricants and reduction in cylinder line bore distortion. The aftertreatment system was optimized through use of low dP substrates and an ammonia gas injection system. The WHR system development included the use of a dual-entry turbine and a mixed charger cooler. Finding and implementing these solutions in a short two-year program at the budgeted funding provided the greatest challenge for the program.

33 ADVANCED PROPULSION SYSTEMS↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of the Relationship between Green Design and Project Delivery Methods

The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more important in projects that used DB. (3) Experience--Team experience is important on all green design projects independent of the PDM. Owners should use a 'best value' selection process, which is more prevalent in DB projects, and include team experience as a criterion. The owner's role is critical with DB. (4) Leadership--Leadership is an important feature for all contracting parties involved in green design projects and it is a dominant success factor in DB projects. (5) Scope of work--A well-defined scope of work is important on all projects, independent of the PDM. In DB, improving the scope of work definition by developing a set of documents, typically comparable to the design development phase, as the basis for awarding a contract is called DB bridging. Using contracting techniques such as DB bridging can result in better identification of expected quality and improves the owner's level of control. (6) Funding and Budget--Having adequate funding and budget for the given scope of work is particularly important in a green design project. Public funding restrictions may not allow use of certain PDMs, and the nature of public funding streams may make non-traditional PDMs more difficult. (7) Complexity and Flexibility--Complexity and flexibility is a project feature that is more specific to green design projects and is more frequently associated with DB. (8) Control and Accountability--Control and accountability is a problem associated with DB more than with DBB. It is not specific to green design projects. DB Bridging can be used to offset the lack of control with traditional DB. The use of green design and DB is increasing and understanding the linkage between the two is important. This research has found that while linkages do exist, the owner needs to carefully consider all aspects of a green design project before making the decision of the most appropriate PDM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE FY 2010 Budget Request and Recovery Act Funding for Energy Research, Development, Demonstration, and Deployment: Analysis and Recommendations

The combination of the FY 2010 budget request for the Department of Energy (DOE) and the portion of the American Recovery and Reinvestment Act of 2009 (ARRA) funds likely to be available in 2010 would (assuming that they would be split evenly between FY 2010 and FY 2011) result in a doubling in funding available for energy research, development, and deployment (ERD and D) from $3.6 billion in FY 2009 to $7.2 billion in FY 2010. Without the stimulus funds, DOE ERD and D investments in FY 2010 would decrease very slightly when compared to FY 2009. Excluding the $7.5 billion for the Advanced Technology Vehicles Manufacturing Loans in FY 2009, the FY 2010 budget request for deployment represents a 33 percent decrease from the FY 2009 levels from $520 million to $350 million. This decrease is largely due to the large amounts of funds appropriated in ARRA for DOE deployment programs, or $23.6 billion, which are three times greater than those appropriated in the FY 2009 budget. These very substantial funding amounts, coupled with the broad range of institutional innovations the administration is putting in place and movement toward putting a price on carbon emissions, will help accelerate innovation for a broad range of energy technologies. DOE's Advanced Research Projects Agency-Energy (ARPA-E) and the Energy Innovation Hubs are important initiatives that could contribute to two weak points of the government's energy innovation effort, namely funding high-risk projects in transformational technologies and in companies that have not traditionally worked with the government and strengthening the integration of basic and applied research in priority areas. Increasing the funding for different types of energy storage research, providing some support for exploring opportunities in coal-to-liquids with carbon capture and storage (CCS) and coal-and-biomass-to-liquids with CCS, and reducing funding for fission RD and D are other actions that Congress could take in the short-term. Energy storage may play a crucial role in the future of the power and transportation systems, which together consume two thirds of primary energy in the United States. A recent National Academy of Science report recommended carrying out detailed scenario assessments of the penetration of unconventional fuels from coal and coal and biomass with CCS. And the research plan provided for nuclear fission does not justify spending as many funds as were requested. The proposed funding for FY 2010 and the resources from ARRA, however, do not guarantee that the United States will finally enjoy the predictable and consistent publicly-funded energy technology innovation effort that it needs. The Obama administration must put in place a comprehensive energy technology innovation strategy that will ensure that an expanded ERD3 effort is both sustainable and efficient. This commission would be charged with, inter alia, developing a strategy that optimizes the integration of the various stages of innovation (research, development, demonstration, early deployment), as well as integrates efforts across technology areas. The database upon which this analysis is based may be downloaded in Excel format at: http://belfercenter.ksg.harvard.edu/publication/19119/ .

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

All Scientists Meeting

Pier Oddone and Young-Kee Kim of Fermi National Accelerator Laboratory lead an all-scientists meeting to discuss current and future work, scope of research, budget and funding information, and other information relating to the lab and its scientists.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bioelectronics Research Lab (Final Report)

The Doheny Eye Institute at the University of Southern California (DEI) served as the lead institution in the DOE Artificial Retina Project. In this role, DEI coordinated the efforts of six national labs, four universities, and one company. The coordination role included arranging regular telecons, scheduling investigator meeting, collating and finalizing quarterly and annual reports, and maintaining progress towards project milestones. Despite being on time and accomplishing the milestones and receiving the highest marks by outside reviewers, the Artificial Retina Program was cut short by 2 years and the amount of funding was drastically reduced for the last 2 years that were funded. These budget cuts led to the inability of the team to complete any of the two products. The 200+ electrode device with the goal of providing vision compatible with mobility and orientation was built but not completed as there were no funds or time to complete the final packaging step for the implantable electronics. The 1,000 electrode device with the goal of providing reading vision was never started beyond conceptual designs.

42 ENGINEERING↗

Wind Generation on Winnebago Tribal Lands

The Winnebago Wind Energy Study evaluated facility-scale, community-scale and commercial-scale wind development on Winnebago Tribal lands in northeastern Nebraska. The Winnebago Tribe of Nebraska has been pursuing wind development in various forms for nearly ten years. Wind monitoring utilizing loaned met towers from NREL took place during two different periods. From April 2001 to April 2002, a 20-meter met tower monitored wind data at the WinnaVegas Casino on the far eastern edge of the Winnebago reservation in Iowa. In late 2006, a 50-meter tower was installed, and subsequently monitored wind data at the WinnaVegas site from late 2006 through late 2008. Significant challenges with the NREL wind monitoring equipment limited the availability of valid data, but based on the available data, average wind speeds between 13.6 – 14.3 miles were indicated, reflecting a 2+/3- wind class. Based on the anticipated cost of energy produced by a WinnaVegas wind turbine, and the utility policies and rates in place at this time, a WinnaVegas wind project did not appear to make economic sense. However, if substantial grant funding were available for energy equipment at the casino site, and if either Woodbury REC backup rates were lower, or NIPCO was willing to pay more for wind power, a WinnaVegas wind project could be feasible. With funding remaining in the DOE-funded project budget,a number of other possible wind project locations on the Winnebago reservation were considered. in early 2009, a NPPD-owned met tower was installed at a site identified in the study pursuant to a verbal agreement with NPPD which provided for power from any ultimately developed project on the Western Winnebago site to be sold to NPPD. Results from the first seven months of wind monitoring at the Western Winnebago site were as expected at just over 7 meters per second at 50-meter tower height, reflecting Class 4 wind speeds, adequate for commercial development. If wind data collected in the remaining months of the twelve-month collection period is consistent with that collected in the first seven months, the Western Winnebago site may present an interesting opportunity for Winnebago. Given the distance to nearby substations, and high cost of interconnection at higher voltage transmission lines, Winnebago would likely need to be part of a larger project in order to reduce power costs to more attractive levels. Another alternative would be to pursue grant funding for a portion of development or equipment costs, which would also help reduce the cost of power produced. The NREL tower from the WinnaVegas site was taken down in late 2008, re-instrumented and installation attempted on the Thunderway site south of the Winnebago community. Based on projected wind speeds, current equipment costs, and the project’s proximity to substations for possible interconnection, a Thunderway community-scale wind project could also be feasible.

17 WIND ENERGY↗