Precise time dissemination and applications development on the Bonneville Power Administration system

The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

K. E. Martin↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

The project described in the paper addresses the issue of mitigating additional intermittency and fast ramps that will occur at higher penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator (CAISO) areas. The proposed Wide Area Energy Management System (WAEMS) addresses these additional balancing requirements through energy exchange between the participating control areas and through the use of energy stor-age and other generation resources. For the BPA and CAISO control centers, the new regulation service will look no different comparing with the traditional balancing services. The work conducted developed principles, algorithms, mar-ket integration rules, functional de-sign and technical specifica-tions for the WAEMS system. Main results obtained in the project are as follow: •Most suitable energy storage technologies for the pro-posed application include flywheel energy storage devices (ESD), pumped or conventional hydro power plants, and so-dium sulfur or nickel cadmium batteries. •A preferred WAEMS architecture was selected as an ag-gregate of a flywheel ESD and a pumped storage (or a con-ventional hydro plant). The aggregate to be integrated with BPA/CAISO automatic generation control systems. •An optimization control algorithm has been developed. It provides an excellent regulation signal following capability, helps to maintain a desired state of charge on the ESD, pre-vent violations, and keep the hydro (pumped storage) power output close to the most efficient operating point. •It has been shown that the WAEMS service could help to reduce the regulation requirement in BPA and CAISO con-trol areas by about 30% compared to a traditional regulation service with the same total regulation capacity.

Energy Management System↗

Annual Report to the Bonneville Power Administration, Reporting Period: April 2008 - February 2009 [re: "Survival and Growth in the Columbia River Plume and north California Current"].

We have made substantial progress toward our objectives outlined in our BPA supported proposal entitled 'Columbia River Basin Juvenile Salmonids: Survival and Growth in the Columbia River Plume and northern California Current' which we report on herein. During 2008, we were able to successfully conduct 3 mesoscale cruises. We also were able to conduct 7 biweekly predator cruises, along with substantial shore-based visual observations of seabirds. Detailed results of the mesoscale cruises are available in the Cruise Reports and summarized in the next section. We have taken a proactive approach to getting the results of our research to fisheries managers and the general public. We have begun to make annual predictions based on ocean conditions of the relative survival of juvenile coho and Chinook salmon well before they return as adults. This is based on both biological and physical indicators that we measure during our surveys or collect from outside data sources. Examples of our predictions for 2009 and 2010 are available on the following web site: http://www.nwfsc.noaa.gov/research/divisions/fed/oeip/a-ecinhome.cfm.

13 HYDRO ENERGY↗

Large Scale Wind and Solar Integration in Germany

This report provides key information concerning the German experience with integrating of 25 gigawatts of wind and 7 gigawatts of solar power capacity and mitigating its impacts on the electric power system. The report has been prepared based on information provided by the Amprion GmbH and 50Hertz Transmission GmbH managers and engineers to the Bonneville Power Administration (BPA) and Pacific Northwest National Laboratory representatives during their visit to Germany in October 2009. The trip and this report have been sponsored by the BPA Technology Innovation office. Learning from the German experience could help the Bonneville Power Administration engineers to compare and evaluate potential new solutions for managing higher penetrations of wind energy resources in their control area. A broader dissemination of this experience will benefit wind and solar resource integration efforts in the United States.

14 SOLAR ENERGY↗

THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests

This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be shared between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Business Case for Nonintrusive Load Monitoring

This report explores how utilities, researchers, and consumers could benefit from a lower cost approach to submetering using non-intrusive load monitoring (NILM). NILM is a process of using data from a single point of monitoring, such as a utility smart meter, to provide an itemized accounting of end use energy consumption in residential and small commercial buildings. Pacific Northwest National Laboratory (PNNL) prepared this report for the Bonneville Power Administration (BPA). PNNL participated in an advisory group as part of a research project sponsored by the U.S. Department of Energy (DOE), the Bonneville Power Administration, and the State of Washington. The Electric Power Research Institute (EPRI) convened the advisory committee for two workshops held to identify ways in which NILM may be used. PNNL, on behalf of DOE, helped to cosponsor the first of these workshops. Results of an end-use monitoring study of a bank branch conducted by PNNL are also presented for purposes of illustrating the need for better data in energy savings modeling (DOE 2013a).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

WindSENSE Project Summary: FY2009-2011

Renewable resources, such as wind and solar, are providing an increasingly larger percentage of our energy needs. To successfully integrate these intermittent resources into the power grid while maintaining its reliability, we need to better understand the characteristics and predictability of the variability associated with these power generation resources. WindSENSE, a three year project at Lawrence Livermore National Laboratory, considered the problem of scheduling wind energy on the grid from the viewpoint of the control room operator. Our interviews with operators at Bonneville Power Administration (BPA), Southern California Edison (SCE), and California Independent System Operator (CaISO), indicated several challenges to integrating wind power generation into the grid. As the percentage of installed wind power has increased, the variable nature of the generation has become a problem. For example, in the Bonneville Power Administration (BPA) balancing area, the installed wind capacity has increased from 700 MW in 2006-2007 to over 1300 MW in 2008 and more than 2600 MW in 2009. To determine the amount of energy to schedule for the hours ahead, operators typically use 0-6 hour ahead forecasts, along with the actual generation in the previous hours and days. These forecasts are obtained from numerical weather prediction (NWP) simulations or based on recent trends in wind speed in the vicinity of the wind farms. However, as the wind speed can be difficult to predict, especially in a region with complex terrain, the forecasts can be inaccurate. Complicating matters are ramp events, where the generation suddenly increases or decreases by a large amount in a short time (Figure 1, right panel). These events are challenging to predict, and given their short duration, make it difficult to keep the load and the generation balanced. Our conversations with BPA, SCE, and CaISO indicated that control room operators would like (1) more accurate wind power generation forecasts for use in scheduling and (2) additional information that can be exploited when the forecasts do not match the actual generation. To achieve this, WindSENSE had two areas of focus: (1) analysis of historical data for better insights, and (2) observation targeting for improved forecasts. The goal was to provide control room operators with an awareness of wind conditions and energy forecasts so they can make well-informed scheduling decisions, especially in the case of extreme events such as ramps.

17 WIND ENERGY↗

The Wide-area Energy Management System Phase 2 Final Report

The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resulting system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.

25 ENERGY STORAGE↗

Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

13 HYDRO ENERGY↗

Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001.

The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Pelton Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M&E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O&M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood River subbasin were initially devised based on various assumptions about (1) subbasin carrying capacity, (2) survival rates for selected life history stages, and (3) historic and current escapements of wild, natural, and hatchery stocks of anadromous salmonids to the Hood River subbasin. The Oregon Department of Fish and Wildlife began funding a monitoring and evaluation (M&E) project in December 1991 to collect the quantitative biological information needed to (1) more accurately assess the validity of these assumptions and (2) evaluate the proposed hatchery supplementation component of the HRPP. Bonneville Power Administration assumed funding of the M&E project in August 1992. The M&E project was initially confined to sampling anadromous salmonids escaping to an adult trapping facility operated at Powerdale Dam; which is located at River Mile (RM) 4.5 on the mainstem of the Hood River. Stock specific life history and biological data was collected to (1) monitor subbasin spawner escapements and (2) collect pre-implementation data critical to evaluating the newly proposed HRPP's potential biological impact on indigenous populations of resident fish. The scope of the M&E project was expanded in 1994 to collect the data needed to quantify (1) subbasin smolt production and carrying capacity, (2) smolt to adult survival rates, and (3) the spatial distribution of indigenous populations of summer and winter steelhead, spring and fall chinook salmon, and coho salmon. A creel was incorporated into the M&E project in December 1996 to evaluate the HRPP with respect to its defined subbasin and spawner escapement objectives for Hood River stocks of wild and hatchery summer and winter steelhead and for natural and Deschutes stock hatchery spring chinook salmon. In 1996, the M&E project also began monitoring streamflow at various locations in the Hood River subbasin. Streamflow data will be used to correlate subbasin smolt production with summer streamflows. Data collected from 1991-1999 is reported in the following annual progress reports: Olsen et al. (1994), Olsen et al. (1995), Olsen and French (1996), Olsen et al. (1996), Olsen and French (1999), and Olsen and French (2000). The annual progress reports document information collected on (1) rearing densities of indigenous fish, (2) subbasin steelhead smolt production, (3) post-release survival of acclimated and direct released hatchery summer and winter steelhead smolts, (4) smolt to adult anadromous salmonid survival rates, (5) jack and adult anadromous salmonid escapements and harvest, (6) spatial distribution of adult anadromous salmonid holding in the Hood River subbasin, (7) selected life history patterns and morphological and meristic characteristics of wild, natural, and hatchery resident and anadromous salmonids, and (8) summer streamflows.

13 HYDRO ENERGY↗

Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes Habitat for Humanity The Woods

The Washington State University (WSU) Energy Program's Building America (BA) team conducted a case study of a high-performance affordable housing community: The Woods (Figure 1). This BA effort is part of a larger-scale study of 30 homes funded from 2013-2016 by Tacoma Public Utilities (TPU) and the Bonneville Power Administration. The Woods is a Habitat for Humanity (HFH) community of homes certified by ENERGY STAR Homes Northwest (ESHNW); the community is in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report and includes significant billing analysis and cost-effectiveness research from a collaborative and ongoing DHP research effort for TPU and the Bonneville Power Administration. This final BA report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing. The research goal of the U.S. Department of Energy's BA research team Building America Partnership for Improved Residential Construction was to compare a ductless heat pump (DHP) hybrid system (DHP in common area/electric resistance [ER] in bedrooms) to an all-electric zonal ER system in high-performance single-family affordable housing. This effort included assessing the costs and benefits of a DHP/ER hybrid system located in the main living area to offset the primary heating demand of zonal ER heaters in the bedroom zones and comparing these findings to data from of new affordable single-family housing in Washington State. This report includes: (1) Measured indoor and outdoor temperatures and relative humidity (RH) in the homes. (2) Field testing results of heating, ventilating, and air-conditioning equipment; ventilation system airflows; building envelope tightness; lighting, appliance, and other input data required for preliminary Building Energy Optimization (BEopt) modeling; and ENERGY STAR field verification (3) BEopt modeling results compared to measured energy use. (4) A comparison of the space heat energy consumption of a DHP/ER hybrid heating system and a traditional zonal ER heating system installed in the same home. This comparison is made by implementing a series of weekly "flip-flop tests" (referred to here as "switchback" tests per TPU) to compare space heating, temperature, and RH in zonal ER heating mode with a DHP/ER mode as discussed in the Building America Test Plan (Lubliner 2010a). (5) Cost data from HFH and other sources related to building efficiency measures focusing on the DHP/ER hybrid heating system. (6) An evaluation of the thermal performance and cost benefit of DHP/ER hybrid heating systems in these high-performance homes employing life cycle cost analysis for energy code policy and monthly cash flow analysis of HFH homeowners. (7) Post-monitoring occupant survey results. The report also provides the following stakeholder findings and recommendations: (1) DHP single-head systems at The Woods are cost-effective to new homebuyers of these high-performance all-electric homes. (2) Stakeholder education is needed on design, inspection, and commissioning; documentation is needed for heat recovery ventilation (HRV) and from ENERGY STAR builders, verifiers, and inspectors to help ensure that the houses meet the goal of "build tight, ventilate right." (3) A code gap in inspection and enforcement was identified that should be addressed by: (3a) Improving the fire marshal's approach to sprinkler attic piping freeze protection; (3b) Improving the maintenance of ceiling insulation continuity; and (3c) Educating the local building inspector on attic insulation inspection concerns that allow for maximizing design improveme...

affordable housing↗

Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes -- Habitat for Humanity The Woods

The Woods is a Habitat for Humanity (HFH) community of ENERGY STAR Homes Northwest (ESHNW)-certified homes located in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report, and includes significant billing analysis and cost effectiveness research from a collaborative, ongoing Ductless Heat Pump (DHP)research effort for Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH. Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FY 2007 Progress Report for Upper Columbia United Tribes' Regional Coordination.

This report is a summary of activities conducted over the fiscal year 2007 contract period to fulfill requirements to coordinate Upper Columbia United Tribes (UCUT) interests within the Columbia River Basin. This coordination was specific to the implementation of portions of the Integrated Fish and Wildlife Program within the purview of the Northwest Power and Conservation Council and Bonneville Power Administration.

13 HYDRO ENERGY↗