Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BLM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Water Resource Assessment In The New Mexico Permian Basin: BLM 2023 Assessment Report

The Permian Basin is the highest producing oil field in the United States and is comprised of three component basins including; the Midland Basin, Delaware Basin and the Marfa Basin. This report describes the work conducted by Sandia National Laboratories (SNL) for the Bureau of Land Management (BLM) to investigate the occurrence of usable water (quality, and depth to water) in the Delaware Sub-basin of the Permian Basin. High Production Areas (HPAs) were identified for the region based on Reasonable Foreseeable Development Scenario (RFD) published by New Mexico Tech University. HPAs were established based on potential for future development of oil reserves. The study was initiated by the BLM-Carlsbad Field Office (CFO) based on concerns that special protections for groundwater in these HPAs may be warranted. A combination of analysis of existing data and field work to collect new data for analysis were used to complete the investigation objectives. This study summarizes the most recent analyses in an ongoing project and builds on previously completed work as listed in Table 1. Advancements in directional drilling and well completion technologies have resulted in an exponential growth in the use of hydraulic fracturing for oil and gas extraction in the Permian Basin. Within the New Mexico portion of the Delaware Sub-basin, water demand to complete each hydraulically fractured well is estimated to average 7.3 acre-feet (2.4 million gallons), resulting in 30 billion barrels of water over the life of the plan or 1.5 billion barrels per year. This rising demand is creating concern for the regions ability to provide the necessary water in a manner that fulfills BLM’s role of protecting human health and the environment while sustainably meeting the needs of various water users in the region. This report documents water-level and water chemistry baselines to aid the BLM in understanding the regional water supply dynamics under various management, policy, and growth scenarios and to pre-emptively identify risks to water sustainability.

54 ENVIRONMENTAL SCIENCES↗

An Analysis of High Opportunity Geothermal Leasing Areas on BLM and USFS Lands

This analysis, conducted by the National Renewable Energy Laboratory (NREL) with support from the U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO), models potential geothermal deployment on BLM and USFS land for the years 2025, 2030, 2035, and 2050 under various scenarios using the Renewable Energy Potential (reV) model and the Regional Energy Deployment System (ReEDS) model. This report identifies potential future high opportunity geothermal leasing areas (i.e., Best, Middle, and Least identified opportunities) based on available data for geothermal resource potential, natural resource conflicts, and transmission access. In addition, this analysis considers the impacts of the Energy Policy Act of 2005's (EPAct 2005's) default competitive leasing provisions, specifically the impact this may have had on geothermal resource discovery outside of known geothermal resource areas.

15 GEOTHERMAL ENERGY↗

Geothermal Reserve Pits: Considerations for Installation on BLM-Administered Lands

Reserve pits, also known as sumps, are a common aspect of geothermal drilling operations. This paper describes the Bureau of Land Management's regulatory authorities and key environmental considerations associated with geothermal reserve pits. Reserve pit design, the need for environmental compliance measures, and reclamation approaches will vary depending on site-specific conditions. Groundwater and wildlife impacts are the most common environmental considerations related to reserve pits. In some cases, regulations or groundwater or soil conditions necessitate the use of a synthetic liner. However, the chemical composition of most geothermal drilling fluids and muds, completion fluids, and produced fluids that are discharged to reserve pits does not warrant pit liners. The potential for hazardous fluids, high water temperatures, and entrapment are concerns for wildlife. Common wildlife impact avoidance and mitigation measures include fencing, netting, and escape ramps. The need for these measures depends on localized site and environmental conditions. There are requirements to reclaim reserve pits following geothermal drilling operations. Reserve pits often remain in place to accommodate multiple phases of drilling and well testing. They are eventually backfilled and decommissioned.

BLM↗

MIP-4 is Induced by Bleomycin and Stimulates Cell Migration Partially via Nir-1 Receptor

Background. CC-chemokine ligand 18 also known as MIP-4 is a chemokine with roles in inflammation and immune responses. It has been shown that MIP-4 is involved in the development of several diseases including lung fibrosis and cancer. How exactly MIP-4 is regulated and exerts its role in lung fibrosis remains unclear. Therefore, in the present study, we examined how MIP-4 is regulated and whether it acts via its potential receptor Nir-1. Materials and Methods. A549 cells were grown and maintained in DMEM : F12 (1 : 1) and supplemented with 10% FBS and 1000 U of penicillin/streptomycin and maintained as recommended by the manufacturer (ATCC). Cell migration and invasion, immunohistochemistry (IHC), Western blot, qPCR, and siRNA Nir-1 were used to determine MIP-4 regulation and its role in cell migration. Results. Cell migration was increased following stimulation of cells with recombinant (r) MIP-4 and bleomycin (BLM), whereas quenching rMIP-4 with its antibody (Ab) or addition of the Ab to BLM or H 2 O 2 diminished rMIP-4-induced cell migration. Along with cell migration, rMIP-4, BLM, and H 2 O 2 induced the formation of actin filaments dynamic structures whereas costimulation with MIP-4 Ab limited BLM- and H 2 O 2 -induced effects. MIP-4 mRNA and protein were increased by BLM and H 2 O 2 , and the addition of its Ab significantly reduced treatments effect. Experiments with siRNA investigating whether Nir-1 is a potential MIR-4 receptor indicated that the inhibition of Nir-1 decreased cell migration/invasion but did not totally inhibit rMIP-4-induced cell migration. Conclusion. Therefore, our data indicate that MIP-4 is regulated by BLM and H 2 O 2 and costimulation with its Ab limits the effects on MIP-4 and that the Nir-1 receptor partially mediates MIP-4’s effects on increased cell migration. These data also evidenced that MIP-4 is regulated by fibrotic and oxidative stimuli and that quenching MIP-4 with its Ab or therapeutically targeting the Nir-1 receptor may partially limit MIP-4 effects under fibrotic or oxidative stimulation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Market Analysis of Solar Photovoltaic Development Potential on Bureau of Land Management Land in Arizona

This report explores the magnitude of the potential buildout of new solar development on Bureau of Land Management (BLM) land in Arizona based on market conditions in 2023. The BLM currently has 18 solar energy zones (SEZs), including three in Arizona, where land has undergone preliminary reviews and is suitable for expedited environmental review and permitting for solar energy projects. The BLM also administers variance areas that are outside SEZs and may consider right-of-way (ROW) applications for utility-scale solar development on such variance lands. Within variance areas in Arizona, the BLM has further identified Renewable Energy Development Area (REDA) lands that are likely well suited to solar or wind development. The purpose of the analysis reported here is to explore the anticipated extent of new solar development on BLM land in the state by 2035.

14 SOLAR ENERGY↗

An experimental examination of the effects of incoming boundary layer modifications on the dynamics of a turbulent compression corner interaction

This experimental study examines the effects of modifications to the incoming turbulent boundary layer on the highly separated shock wave/boundary layer interaction generated by an unswept compression corner. Particular focus is placed on the motion of the unsteady separation shock wave. The flowfield was generated by a 28 deg ramp in a Mach 5 flow with a freestream Reynolds number of 50 x 10 exp 6/m. The incoming turbulent boundary layer transitioned naturally and developed under near-adiabatic wall conditions. Modification of the flow entering the interaction was effected through either a single plate boundary layer manipulator (BLM) or riblets. The BLM reduced the length of separation by 35-45 percent and reduced the streamwise extent of the separation shock motion by 36-74 percent. Examination of the flowfield downstream of the BLM showed this result to be due to the inviscid preturning of the flow by the BLM, and not by changes to the boundary layer dynamics. The riblets had no measurable effect on the compression corner interaction.

Mcclure, W. B.↗

Synchronous High-frequency Distributed Readout For Edge Processing At The Fermilab Main Injector And Recycler

The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for beam loss monitors (BLM)[2], which provided a more systematic study of the machine and improved displays of routine operation. However, current projects are demanding more data and at a faster rate from this aging hardware. One such project, Real-time Edge AI for Distributed Systems (READS), requires the high-frequency, low-latency collection of synchronized BLM readings from around the approximately two-mile accelerator complex. Significant work has been done to develop new hardware to monitor the VME backplane and broadcast BLM measurements over Ethernet, while not disrupting the existing operations critical functions of the BLM system. This paper will detail the design, implementation, and testing of this parallel data pathway.

43 PARTICLE ACCELERATORS↗

Geothermal Hydraulic Stimulation: Overview of Methods and Best Practices

This paper outlines important information related to the hydraulic stimulation of geothermal wells and considerations for regulators responsible for evaluating applications to conduct these operations. Hydraulic stimulation applied to geothermal wells is an evolving technology that is different from the hydraulic fracturing process widely used to complete unconventional oil and gas wells. Important differences relate to operating pressures, variations in rock and fracture processes, and characteristics and disposal of hydraulic fracture fluids. Hydraulic stimulation is not widely used in the geothermal industry; however, future development of enhanced geothermal systems (EGS) will require hydraulic stimulation in order to enhance and create fracture permeability to allow wells to deliver sufficient heat and fluid to power plants. Gigawatts of EGS potential have been identified (U.S. Department of Energy 2019), so it is expected that the use of hydraulic stimulation of geothermal wells will be more common in the future. At present, there are no formal regulations guiding drilling programs or sundry notices that propose hydraulic stimulation of geothermal wells. On federal lands, important constraints and oversight are embedded in the process for obtaining Geothermal Drilling Permits outlined in the Code of Federal Regulations (43 CFR Section 3262.11); in Geothermal Resource Order 2 (GRO 2) guidance for assessment and mitigation of impacts of geothermal operations as well as construction and testing of geothermal wells; and in a Bureau of Land Management (BLM) Induced Seismicity Instruction Memorandum (BLM 2018). Additionally, local knowledge from BLM field offices and expertise of BLM engineers, or that of state regulators for operations on private and state lands, will be applied to fully assess operator applications to conduct geothermal hydraulic stimulation activities. Significant research effort has been directed toward EGS, so geothermal hydraulic stimulation techniques, impacts, and results are evolving and becoming better understood, including adaptation of decades of oil and gas industry experience with hydraulic fracturing of unconventional reservoirs. Recent EGS activities in the United States provide details about hydraulic stimulation with respect to oversight, stimulation design, execution, and results. Based on experience to date, the important issues to address when hydraulically stimulating a geothermal well include the following: 1. Wellbore construction and integrity must be appropriate to protect groundwater and manage stimulation pressures. 2. Understanding of lithology, faults, fractures, and subsurface stress state is necessary to design stimulation plans and predict results. 3. Seismic monitoring allows for observation and mitigation of induced seismicity.

geothermal↗

A Simple Data-Centric Methodology for Producible Geothermal Well Determinations: Preprint

The Bureau of Land Management (BLM) has traditionally lacked a standardized methodology for determining if a newly drilled geothermal well is "producible," a designation essential for deciding whether a lease should be "held by production." This is a straightforward problem to solve in oil and gas: Demonstrate that a well is economically viable, meaning it produces sufficient oil or gas to exceed direct operating costs and lease-related expenses, such as rentals or minimum royalties. In geothermal, the problem is more complex: Geothermal wells are tightly coupled with the downstream infrastructure - specifically, the power plant, which is often not designed until well after a lease is deemed as "held by production." Although this designation is critical for advancing geothermal power plant development on BLM-managed lands, current geothermal well assessments often rely on ad hoc approaches that can be complex, operator-biased, and heavy in assumptions related to economic viability. To address this, we have developed two complementary methodologies: a minimum power requirement-based approach and a productivity index (PI)-based approach. These methods leverage key flow test data - pressure, temperature, flow rate, and specific enthalpy - to provide reliable and standardized producible well determinations. The minimum power requirement-based approach evaluates wells against specific power output thresholds informed by reservoir experts and the associated temperature requirements. The PI-based approach assesses well productivity using widely accepted reservoir engineering metrics, proposing a threshold of 2.5 kg/s/bar. Both methods are data-driven and grounded in empirical production data from operational geothermal wells, avoiding uncertain economic assumptions while maintaining decision-making accuracy. Wells falling below key performance thresholds (i.e., PI, specific power) are deemed non-producible. These methodologies aim to streamline BLM's decision-making process, reduce nontechnical barriers to geothermal energy adoption, and enable regulatory expansion into states lacking geothermal expertise. Preliminary results indicate clear trends and thresholds in production data that provide actionable insights for evaluating well producibility. Validation using well completion report (WCR) data is ongoing, with promising results demonstrating the potential for these standardized methodologies to impact geothermal development significantly.

15 GEOTHERMAL ENERGY↗

Disentangling Beam Losses in The Fermilab Main Injector Enclosure Using Real-Time Edge AI

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler Ring. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Deciphering the origin of any of the 260 BLM readings is often difficult. The (Accelerator) Real-time Edge AI for Distributed Systems project, or READS, has developed an AI/ML model, and implemented it on fast FPGA hardware, that disentangles mixed beam losses and attributes probabilities to each BLM as to which machine(s) the loss originated from in real-time. The model inferences are then streamed to the Fermilab accelerator controls network (ACNET) where they are available for operators and experts alike to aid in tuning the machines.

43 PARTICLE ACCELERATORS↗

Semantic Regression for Disentangling Beam Losses in the Fermilab Main Injector and Recycler

Fermilab’s Main Injector enclosure houses two accelerators: the Main Injector (MI) and the Recycler (RR). In periods of joint operation, when both machines contain high intensity beam, radiative beam losses from MI and RR overlap on the enclosure’s beam loss monitoring (BLM) system, making it difficult to attribute those losses to a single machine. Incorrect diagnoses result in unnecessary downtime that incurs both financial and experimental cost. In this work, we introduce a novel neural approach for automatically disentangling each machine’s contributions to those measured losses. Using a continuous adaptation of the popular UNet architecture in conjunction with a novel data augmentation scheme, our model accurately infers the machine of origin on a per-BLM basis in periods of joint and independent operation. Crucially, by extracting beam loss information at varying receptive fields, the method is capable of learning both local and global machine signatures and producing high quality inferences using only raw BLM loss measurements.

43 PARTICLE ACCELERATORS↗

Real-Time Inference For MI/RR Deblending

The Fermilab Main Injector (MI) and Recycler Ring (RR) share a common beam loss monitor (BLM) system, making loss events difficult to attribute to their source machine when beam is present in both simultaneously. The Real-time Edge AI for Distributed Systems (READS) project addresses this by deblending BLM readings in real time using machine learning (ML). The current FPGA based implementation meets the sub-3 ms latency requirement but carries a resource intensive hls4ml development cycle, motivating exploration of GPU based deployment. This paper characterizes inference latency on an NVIDIA Jetson Orin Nano and introduces a packet organization scheme for assembling synchronized event frames from seven distributed BLM DAQ streams. Using a Python based DAQ simulation with injected timing jitter in place of unavailable live beam data, the pipeline achieved an average end to end latency of 0.456 ms (σ = 0.122 ms) across 167,000 test frames, comfortably meeting the timing constraint. Early outliers were attributed to TensorRT warm-up rather than steady state limitations, suggesting GPU based inference is a viable alternative to the existing FPGA implementation.

Yu, Kellen [Cornell U.]↗

16 Weeks of Training with the International Space Station Advanced Resistive Exercise Device (aRED) Is not Different than Training with Free Weights

The advanced Resistive Exercise Device (aRED) is a resistive exercise system designed to maintain muscle mass and strength in microgravity by simulating free weight (FW) exercise. aRED utilizes vacuum cylinders and inertial flywheels to replicate the constant mass and inertial components, respectively, of FW exercise in normal gravity. PURPOSE: To compare the effectiveness of aRED and FW resistive exercise training in ambulatory subjects. METHODS: Untrained subjects were assigned to two groups, FW (6 males, 3 females) and aRED (8 males, 3 females), and performed squat (SQ), heel raise (HR), and deadlift (DL) exercises 3 d wk-1 for 16 wks. SQ, HR and DL strength (1RM) were measured using FW hardware pre-, mid- and post-training. Subjects participated in a periodized training protocol with the exercise prescription based on a percentage of 1RM. Thigh and lower leg muscle volume were assessed using Magnetic Resonance Imaging (MRI), and leg (LLM) and total body lean mass (BLM) were measured using Dual Energy X-ray Absorptiometry (DXA) pre- and post-training. RESULTS: SQ 1RM increased in both FW (48.9+/-6.1%) and aRED (31.2+/-3.8%) groups, and there was a greater training response in FW compared with aRED (p=0.01). HR and DL 1RM increased in FW (HR: 12.3+/-2.4%, DL: 23.3+/-4.4%) and aRED (HR: 18.0+/-1.6%, DL: 23.2+'-2.8%), but there were no differences between groups. Thigh muscle volume was greater following training in both groups (FW: 9.8+/-0.9%, aRED: 7.1+/-1.2%) but lower leg muscle volume increased only in the FW group (3.0+/-1.1%). Lean tissue mass increased in both FW (LLM: 3.9+/-1.1%, BLM: 2.5+/-0.7%) and aRED (LLM: 4.8+/-0.7%, BLM: 2.6 0.7%). There were no between group differences in muscle volume or lean mass in response to training. CONCLUSIONS: In general, the increase in muscle strength, muscle volume, and lean tissue mass when training with aRED was not different than when using the same training protocol with FW. The smaller increase in SQ 1RM in the aRED group may be the result of undersizing the aRED flywheels which were intended to mimic the inertial component of the SQ movement when performing FW exercises. However, the biomechanical differences observed in body position during the performance of the aRED SQ, which may have affected training and testing, cannot be excluded as a factor that may have affected SQ 1RM results. PRACTICAL APPLICATIONS: Improvements in muscle strength, muscle volume and lean mass similar to FW exercise training may be elicited using an alternative source of resistance during exercise training. The acceleration of a mass during resistive exercise may result in greater muscle tension when changing the direction of movement resulting in enhanced strength gains. Therefore, to maximize the benefits of resistive exercise, the inertial components of FW exercise should be considered during exercise selection and hardware design. ACKNOWLEDGEMENT: This investigation was supported by NASA-JSC s Exercise Countermeasures Project.

Loehr, J. A.↗

FPGA Architectures for Distributed ML Systems for Real-time Beam Loss De-blending

The Accelerator Real-time Edge AI for Distributed Systems (READS) project’s goal is to create a Artificial Intelligence (AI) system for real-time beam loss de-blending within the accelerator enclosure, which houses two accelerators: the Main Injector (MI) and the Recycler Ring (RR). In periods of joint operation, when both machines contain high intensity beam, radioactive beam losses from MI and RR overlap on the enclosure’s beam loss monitoring Beam Loss Monitor (BLM) system, making it difficult to attribute those losses to a single machine. Incorrect diagnoses result in unnecessary downtime that incurs both financialand experimental cost. The ML system will automatically disentangle each machine’s contributions to those measured losses, while not disrupting the existing operations-critical functions of the BLM system. This paper will focus on the evolution of the architectures, which provided the high-frequency, low-latency collection of synchronized data streams to make real-time inferences. The ML models, used for learning both local and global machine signatures and producing high quality inferences based on raw BLM loss measurements, will only be discussed at a high-level.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Exploration of Real Time Inference for MI-RR Deblending on GPU/TPU Systems

The Fermilab Main Injector (MI) and Recycler Ring (RR) share a common beam loss monitor (BLM) system, making loss events difficult to attribute to their source machine when beam is present in both simultaneously. The Real-time Edge AI for Distributed Systems (READS) project addresses this by deblending BLM readings in real time using machine learning (ML). The current FPGA based implementation meets the sub-3 ms latency requirement but carries a resource intensive hls4ml development cycle, motivating exploration of GPU based deployment. This paper characterizes inference latency on an NVIDIA Jetson Orin Nano and introduces a packet organization scheme for assembling synchronized event frames from seven distributed BLM DAQ streams. Using a Python based DAQ simulation with injected timing jitter in place of unavailable live beam data, the pipeline achieved an average end to end latency of 0.456 ms (σ = 0.122 ms) across 167,000 test frames, comfortably meeting the timing constraint. Early outliers were attributed to TensorRT warm-up rather than steady state limitations, suggesting GPU based inference is a viable alternative to the existing FPGA implementation.

Yu, Kellen [Fermilab; Cornell U.]↗

Monitoring Springs in the Mojave Desert Using Landsat Time Series Analysis

The purpose of this study, based on Landsat satellite data was to characterize variations and trends over 30 consecutive years (1985-2016) in perennial vegetation green cover at over 400 confirmed Mojave Desert spring locations. These springs were surveyed between in 2015 and 2016 on lands managed in California by the U.S. Bureau of Land Management (BLM) and on several land trusts within the Barstow, Needles, and Ridgecrest BLM Field Offices. The normalized difference vegetation index (NDVI) from July Landsat images was computed at each spring location and a trend model was first fit to the multi-year NDVI time series using least squares linear regression.Â

Time Series↗

Great Basin Ecological Forecasting II: Assessing and Forecasting Live Fuel Moisture Content of Wildfire Fuels for the Eastern Great Basin to Improve Wildfire Timing and Severity Predictions

The eastern Great Basin (EGB) extends throughout the states of Arizona, Colorado,Idaho, Utah, and Wyoming, covering approximately 411,000 km2. In recent years, wildfires in the EGB have increased in frequency and size, representing a growing concern for our partners at the Bureau of Land Management (BLM), the National Weather Service (NWS), and the Great Basin Coordination Center (GBCC). Live fuel moisture (LFM) is an important factor in predicting wildfire risk, as dry vegetation requires less energy to combust than wet vegetation. Land managers currently derive LFM levels from just 165 in situ sites in the EGB. In order to provide partners with a more accurate assessment of LFM, the team used data from the National Elevation Dataset, Aqua and Terra Moderate Resolution Imaging Spectroradiometer, and Suomi National Polar-orbiting Partnership Visible Infrared Imaging Radiometer Suite. These datasets include vegetation indices, evapotranspiration, and topographic variables, which were used to create biweekly forecasts of LFM throughout the EGB. An accuracy assessment was conducted using historical in situ data from our partners at the BLM and the GBCC. This model allowed our partners to make informed decisions regarding resource allocation in response to the predicted timing and severity of wildfires in the EGB.

Ecological Forecasting↗

Great Basin Ecological Forecasting II: Assessing and Forecasting Live Fuel Moisture Content of Wildfire Fuels for the Eastern Great Basin to Improve Wildfire Timing and Severity Predictions

The eastern Great Basin (EGB) extends throughout the states of Arizona, Colorado, Idaho, Utah, and Wyoming, covering approximately 411,000 sq.km. In recent years, wildfires in the EGB have increased in frequency and size, representing a growing concern for our partners at the Bureau of Land Management (BLM), the National Weather Service (NWS), and the Great Basin Coordination Center (GBCC). Live fuel moisture (LFM) is an important factor in predicting wildfire risk, as dry vegetation requires less energy to combust than wet vegetation. Land managers currently derive LFM levels from just 165 in situ sites in the EGB. In order to provide partners with a more accurate assessment of LFM, the team used data from the National Elevation Dataset, Aqua and Terra Moderate Resolution Imaging Spectroradiometer, and Suomi National Polar-orbiting Partnership Visible Infrared Imaging Radiometer Suite. These datasets include vegetation indices, evapotranspiration, and topographic variables, which were used to create biweekly forecasts of LFM throughout the EGB. An accuracy assessment was conducted using historical in situ data from our partners at the BLM and the GBCC. This model allowed our partners to make informed decisions regarding resource allocation in response to the predicted timing and severity of wildfires in the EGB.

Ecological Forecasting↗