Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

BESS: Present Results and the BESS-Polar Program

In nine flights between 1993 and 2002, the Balloon Borne Experiment with a Superconducting Spectrometer (BESS) has measured the spectrum of cosmic-ray antiprotons between 0.18 and 4.20 GeV, and the spectra of protons and helium to several hundred GeV/nucleon. BESS has also placed stringent upper limits on the existence of antihelium and antideuterons. Above about 1 GeV, models for antiprotons as secondary products of the interactions of primary cosmic rays agree with the BESS spectrum. Below 1 GeV, BESS data suggest the presence of an additional source of antiprotons. To extend BESS measurements to lower energies and to search for antinuclei, an evolutionary instrument, BESS-Polar, is under construction with a new, ultra-thin, superconducting spectrometer optimized for long-duration balloon flights. The initial flight is planned &om Antarctica in Winter 2004-2005. BESS Collaboration: High Energy Accelerator Research Organization (KEK), Japan; NASA Goddard Space Flight Center, USA; Kobe University, Japan; The University of Tokyo, Japan; Institute of Space and Astronautical Science/JAXA, Japan; University of Maryland, College Park, USA.

Ormes, Jonathan↗

West Africa Battery Energy Storage Systems (BESS) Capacity Building - Discussion of BESS Tariffs: Payment Structures and Case Studies [Slides]

Battery Energy Storage Systems (BESS) are emerging as critical assets for enhancing grid reliability, integrating renewable energy, and enabling system flexibility. Yet, the regulatory and financial frameworks that determine how BESS projects are compensated vary widely across jurisdictions. This presentation explores international case studies - from Honduras, Costa Rica, Chile, South Africa, Mexico, and Brazil - to illustrate how tariff design and payment structures are evolving to support large-scale BESS deployment. The cases highlight a range of ownership and revenue models, including cost-of-service mechanisms, energy and capacity payments, and market-based arbitrage, as well as hybrid approaches under development. The discussion will examine key challenges such as defining remuneration for ancillary services, addressing double charging, and accounting for efficiency losses and degradation over time. By comparing experiences across markets, the presentation identifies emerging best practices for valuing BESS and designing tariffs that align technical performance with economic incentives, providing insights for regulators, utilities, and policymakers pursuing storage integration.

25 ENERGY STORAGE↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE↗

Solar PV and BESS Plant-Level Voltage Control and Interactions: Experiments and Analysis

In real world operation, low-frequency oscillations associated with plant-level voltage control of inverter-based resources (IBRs) have been a concern of grid operators. Here, this research aims to demonstrate and analyze the effect of plant-level voltage control on system stability and potential interactions among IBRs. The experiment results of a 13.2-kV system interconnected with two IBRs—a 1-MW battery energy storage system (BESS) and a 430-kW solar photovoltaic (PV) plant—are presented. Both 0.5-Hz and 3-Hz oscillations become visible at certain conditions. The phenomenon is further explained by use of a feedback system consisting of the plant-level droop control and the effect of reactive power or var injection on voltage. The main components of the block diagram are obtained via frequency scan measurements. The analysis offers an understanding of the main contributors and other influencing factors of the 3-Hz and 0.5-Hz modes. It also reveals the role of the volt-var droop gain, the low-pass filter time constant, and the system impedance in stability.

14 SOLAR ENERGY↗

The Bess Investigation of the Origin of Cosmic-ray Antiprotons and Search for Cosmological Antimatter

The Balloon-borne Experiment with a Superconducting Spectrometer (BESS) collaboration has made precise measurements of the spectra of cosmic ray antiprotons and light nuclei and conducted a sensitive search for antinuclei. Ten BESS high-latitude flights, eight from Canada and two from Antarctica, span more than a Solar cycle between 1993 and 2007/2008. BESS measurements of low-energy antiprotons constrain candidate models for dark matter including the possible signature of primordial black hole evaporation. The stringent BESS measurements of antiprotons and the elemental and isotopic spectra of H and He provide strong constraints on models of cosmic-ray transport in the Galaxy and Solar System. BESS has also reported the first antideuterium upper limit. BESS employs a superconducting magnetic-rigity spectrometer with time-of-flight and aerogel Cherenkov detectors to identify incident particles by charge, charge sign, mass, and energy. The BESS-Polar long-duration instrument has reduced lower energy limit of 100 MeV (top of the atmosphere) to increase its sensitivity to possible primary antiproton sources. BESS-Polar II was rebuilt with extended magnet lifetime, improved detector and electronic performance, and greater data storage capacity. It was flown fro Antarctica December 2007-January 2008, recording about 4.6 bission events during 24.5 days at float altitude with the magnet on. During the flight the influence of a high-speed stream in the Solar wind was observed. Details of the BESS-Polar II instrument and flight performance are reported elsewhere at this conference. The successful BESS-Polar II flight at Solar minimum is especially important. Most cosmic-ray antiprotons are secondary products of nuclear interactions of primary cosmic-ray nuclei with the interstellar gas, giving a spectrum that peaks at about 2 GeV and falls rapidly to higher and lower energies. However, BESS data taken in the previous Solar minimum show a small excess over secondary expectations at low energies, possibly suggesting the presence of an additional component that may be masked at higher levels of Solar modulation. The high-statistics Solar minimum data obtained by BESS-Polar II will provide a difinitive test of this component. We will review the BESS program and report the latest results including the antiproton and proton spectra measured in the BESS-Polar I flight, the search for cosmic antinuclei, and the status of the BESS-Polar II analysis.

Mitchell, John↗

The Bess-Polar II Long Duration Flight Above Antarctica

The Balloon-borne Experiment with a Superconducting Spectrometer, BESS, has been developed to study elementary particle phenomena in the early universe through measurements of low energy antiprotons to investigate their origin and through a search for antihelium. The BESS collaboration carried out nine northern latitude flights between 1993 and 2002. BESS-Polar is an advanced program of the BESS collaboration to study these topics with much greater precision using long duration flights above Antarctica. The BESS-Polar spectrometer was successfully developed to accumulate much larger numbers of events during long duration flights around the South Pole. Approximately a factor of four reductions in the amount of material in the particle beam enables measurement of much lower energy antiprotons down to 100 MeV (at top of atmosphere). The first BESS-Polar flight (BESS-Polar I) of 8.5 days was carried out above Antarctica in December 2004. recording 900 million cosmic-ray events. The second BESS-Polar flight (BESS-Polar 11) was successfully carried out in the austral summer season of 2007-2008. Based on experience with BESS-Polar I, the spectrometer was improved in performance and achieved long term stability during the flight. A newly constructed magnet with a larger liquid He capacity and improved thermal insulation and an upgraded data storage system with larger capacity of hard disk drives (HDDs) enabled longer observation time. BESS-Polar II was launched on December 22, 2007 from Williams Field, McMurdo Station, in Antarctica. The spectrometer worked properly and observed cosmic rays for about 24.5 days at float altitude, recording 4.6 billion events on the HDDs until the limit of the magnet operation was reached on January 16, 2008. The flight was terminated and the spectrometer was safely landed on the West Antarctic ice sheet (1000 km from the South Pole) on January 21, 2008. Here, the BESS-Polar instrument is discussed, highlighting improvements made for BESS-Polar II, and overviews of the flight and performance are reported.

Sasaki, Makoto↗

The BESS Search for Cosmic-Ray Antiproton Origins and for Cosmological Antimatter

The apex of the Balloon-borne Experiment with a Superconducting Spectrometer (BESS) program was reached with the Antarctic flight of BESS-Polar II, during the 2007-2008 Austral Summer, that obtained 24.5 days of data on over 4.7 billion cosmic-ray events. The US-Japan BESS Collaboration uses elementary particle measurements to study the early Universe and provides fundamental data on the spectra of light cosmic-ray elements and isotopes. BESS measures the energy spectra of cosmic-ray antiprotons to investigate signatures of possible exotic sources, such as dark-matter candidates, and searches for heavier antinuclei that might reach Earth from antimatter domains formed during symmetry breaking processes in the early Universe. Since 1993, BESS has carried out eleven high-latitude balloon flights, two of long duration, that together have defined the study of antiprotons below about 4 GeV, provided standard references for light element and isotope spectra, and set the most sensitive limits on the existence of antideuterons and antihelium. The BESS-Polar II flight took place at Solar Minimum, when the sensitivity of the low-energy antiproton measurements to a primary source is greatest. The rich BESS-Polar II dataset more than doubles the combined data from all earlier BESS flights and has 10-20 times the statistics of BESS data from the previous Solar Minimum. Here, we summarize the scientific results of BESS program, focusing on the results obtained using data from the long-duration flights of BESS-Polar I (2004) and BESS-Polar II.

Mitchell, John↗

BESS-STAIR: a framework to estimate daily, 30m, and all-weather crop evapotranspiration using multi-source satellite data for the US Corn Belt

Abstract. With increasing crop water demands and drought threats, mapping andmonitoring of cropland evapotranspiration (ET) at high spatial and temporalresolutions become increasingly critical for water management andsustainability. However, estimating ET from satellites for precise waterresource management is still challenging due to the limitations in bothexisting ET models and satellite input data. Specifically, the process of ETis complex and difficult to model, and existing satellite remote-sensing datacould not fulfill high resolutions in both space and time. To address theabove two issues, this study presents a new high spatiotemporal resolution ETmapping framework, i.e., BESS-STAIR, which integrates a satellite-drivenwater–carbon–energy coupled biophysical model, BESS (Breathing Earth SystemSimulator), with a generic and fully automated fusion algorithm, STAIR(SaTallite dAta IntegRation). In this framework, STAIR provides daily 30'mmultispectral surface reflectance by fusing Landsat and MODIS satellite datato derive a fine-resolution leaf area index and visible/near-infrared albedo,all of which, along with coarse-resolution meteorological and CO 2 data, are used to drive BESS to estimate gap-free 30 m resolution daily ET.We applied BESS-STAIR from 2000 through 2017 in six areas across the US CornBelt and validated BESS-STAIR ET estimations using flux-tower measurementsover 12 sites (85 site years). Results showed that BESS-STAIR daily ETachieved an overall R2=0.75, with root mean square error RMSE=0.93 mm d -1 and relative error RE =27.9 % when benchmarkedwith the flux measurements. In addition, BESS-STAIR ET estimations capturedthe spatial patterns, seasonal cycles, and interannual dynamics well indifferent sub-regions. The high performance of the BESS-STAIR frameworkprimarily resulted from (1) the implementation of coupled constraints onwater, carbon, and energy in BESS, (2) high-quality daily 30 m data from theSTAIR fusion algorithm, and (3) BESS's applicability under all-skyconditions. BESS-STAIR is calibration-free and has great potentials to be areliable tool for water resource management and precision agricultureapplications for the US Corn Belt and even worldwide given the globalcoverage of its input data.

54 ENVIRONMENTAL SCIENCES↗

Antimatter and Dark Matter Search in Space: BESS-Polar Results

The apex of the Balloon-borne Experiment with a Superconducting Spectrometer program was reached with the Antarctic flight of BESS-Polar II, during the 2007-2008 Austral Summer, that obtained 24.5 days of data on over 4.7 billion cosmic-ray events. The US-Japan BESS Collaboration uses elementary particle measurements to study the early Universe and provides fundamental data on the spectra of light cosmic-ray elements and isotopes. BESS measures the energy spectra of cosmic-ray antiprotons to investigate signatures of possible exotic sources, such as dark-matter candidates, and searches for heavier anti-nuclei that might reach Earth from antimatter domains formed during symmetry breaking processes in the early Universe. Since 1993, BESS has carried out eleven high-latitude balloon flights, two of long duration, that together have defined the study of antiprotons below about 4 GeV, provided standard references for light element and isotope spectra, and set the most sensitive limits on the existence of anti-deuterons and anti-helium, The BESS-Polar II flight took place at Solar Minimum, when the sensitivity of the low-energy antiproton measurements to a primary source is greatest. The rich BESS-Polar II dataset more than doubles the combined data from all earlier BESS flights and has 10-20 times the statistics of BESS data from the previous Solar Minimum. Here, we summarize the scientific results of BESS program, focusing on the results obtained using data from the long-duration flights of BESS-Polar I (2004) and BESS-Polar II.

Mitchell, John W.↗

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Search for Antihelium with the BESS-Polar Spectrometer

In two long-duration balloon flights over Antarctica, the BESS-Polar collaboration has searched for antihelium in the cosmic radiation with higher sensitivity than any reported investigation. BESSPolar I flew in 2004, observing for 8.5 days. BESS-Polar II flew in 2007-2008, observing for 24.5 days. No antihelium candidate was found in BESS-Polar I data among 8.4 x 10(exp 6) [Z] = 2 nuclei from 1.0 to 20 GV or in BESS-Polar II data among 4.0 x 10(exp 7) [Z] = 2 nuclei from 1.0 to 14 GV. Assuming antihelium to have the same spectral shape as helium, a 95% confidence upper limit of 6.9 x 10(exp -8) was determined by combining all the BESS data, including the two BESS-Polar flights. With no assumed antihelium spectrum and a weighted average of the lowest antihelium efficiencies from 1.6 to 14 GV, an upper limit of 1.0 x 10(exp -7) was determined for the combined BESS-Polar data. These are the most stringent limits obtained to date.

Sasaki, M.↗

The BESS Program

In nine flights between 1993 and 2002, the Balloon Borne Experiment with a Superconducting Spectrometer (BESS) has measured the energy spectrum of cosmic-ray antiprotons between 0.18 and 4.20 GeV, and the spectra of protons and helium to several hundred GeV. BESS has also placed stringent upper limits on the existence of antihelium and antiduterons. Above about 1 GeV, models in which antiprotons are secondary products of the interactions of primary cosmic rays with the ISM agree with the BESS spectrum. Below 1 GeV, BESS data suggest the presence of an additional source of antiprotons. The antiproton/proton ratios measured between 1993 and 1999, during the Sun's positive-polarity phase, are consistent with simple models of solar modulation. Results from the 2000 flight, following the solar magnetic field reversal, show a sudden increase in the antiproton/proton ratio and tend to favor a charge-sign-dependent drift model. To extend BESS measurements to lower energies, a new instrument, BESS-Polar, is under construction for a flight from Antarctica in 2004.

Mitchell, J. W.↗

Search for Cosmic-Ray Antiproton Origins and for Cosmological Antimatter with BESS

The balloon-borne experiment with a superconducting spectrometer (BESS) has performed cosmic-ray observations as a US-Japan cooperative space science program, and has provided fundamental data on cosmic rays to study elementary particle phenomena in the early Universe. The BESS experiment has measured the energy spectra of cosmic-ray antiprotons to investigate signatures of possible exotic origins such as dark matter candidates or primordial black holes. and searched for heavier antinuclei that might reach Earth from antimatter domains formed in the early Universe. The apex of the BESS program was reached with the Antarctic flight of BESS-Polar II, during the 2007- 2008 Austral Summer, that obtained over 4.7 billion cosmic-ray events from 24.5 days of observation. The flight took place at the expected solar minimum, when the sensitivity of the low-energy antiproton measurements to a primary source is greatest. Here, we report the scientific restults, focusing on the long-duration flights of BESS-Polar I (2004) and BESS-Polar II (2007-2008).

Yamamoto, A.↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session Two

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. A comprehensive exploration of BESS cybersecurity supply chain risks, systematic vendor risk assessment through the BESS Procurement Guide, and practical application of the INL SCRM Chatbot for enhanced supply chain resilience. This is Session 2 of 3. (Full Version)

25 - ENERGY STORAGE↗

Precursor Analysis Report: SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003

The SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003 Precursor Analysis Report leverages publicly available information about Davis-Besse’s 2003 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. On 25 January 2003, the SQL Slammer worm infected more than 90% of vulnerable hosts and crashed the internet in 10 to 15 minutes, making it one of the fastest spreading worms in history. SQL Slammer is a fileless, memory-resident worm that remotely exploits a stack-based buffer overflow vulnerability on local hosts to intensively scan and rapidly self-propagate across the internet. The worm infected approximately 300,000 unpatched hosts running Microsoft Structured Query Language (SQL) Server 2000 or Microsoft Desktop Engine (MSDE) 2000 with SQL Server Resolution Service. The SQL Slammer worm indirectly infected FirstEnergy’s Davis-Besse nuclear power plant by first infecting a consultant’s company network server and then propagating through an external misconfigured connection into Davis-Besse’s site network. The infection caused major network congestion, slow performance, data overloads, and the inability of local hosts to communicate with each other, which eventually caused a loss of availability and a loss of view when the Safety Parameter Display System (SPDS) and Plant Process Computer (PPC) crashed. At the time of the infection, the plant was already offline, the digital monitoring systems had redundant analog backups, and the plant control and safety functions were not affected, so there were no concerns of a safety breach. However, this incident resulted in many lessons learned and spawned important discussions about cybersecurity’s role in nuclear safety and electric power reliability regulation, policy, and guidance. Researchers and analysts identified 10 unique techniques utilized during the attack with a total of 640 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Eight of the identified techniques used during Davis-Besse cyber attack were precursors to the triggering event. Analysis identified 596 observables associated with these precursor techniques, 428 of which were assessed to have an increased likelihood of being perceived in the 331 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Application of Cyber-Informed Engineering for Protecting BESS

This white paper synthesizes an array of crucial grid services provided by BESS technology, assesses its architecture and communications, and presents a case study for analysis against the principles introduced by Cyber-Informed Engineering (CIE). Furthermore, in walking through the analysis, this paper presents a framework to evaluate risks and solutions when considering BESS components. Asset owners and buyers could perform this analysis to assess their BESS product implementations, alternative inverter-based resources (IBR), and energy management systems (EMS). Battery systems fulfill various roles contingent on the unique market demands and the specific challenges presented by regional grid infrastructures. These roles also vary due to the differing utility models for ownership and operation, which are adapted to meet regional and local capabilities and requirements. Concerns have been raised regarding the potential for adversaries to exploit knowledge of battery operational patterns to orchestrate decisive attacks. However, the security of operational data for these systems may not be the primary vulnerability, as much of this information is already well-understood within the community. Applying a modest degree of subject matter expertise can often yield valuable predictions regarding how a battery will respond under certain conditions, such as grid emergencies, high or low-temperature days, Public Safety Power Shutoff (PSPS) events, and outages. The operational characteristics of batteries are well-documented, and their capabilities, including the risks associated with misoperation and the resulting consequences, are published and understood within the industry. CIE practices represent the next step in gaining functional assurance and providing an acceptable level of risk, regardless of whether a battery vendor can support a trusted and validated supply chain. While this issue has exacerbated supply chain challenges, it is not an isolated condition. This foreign supply route is the primary source of BESS for the U.S. market. Significant efforts are underway through the Bipartisan Infrastructure Law (BIL) to change that. Still, strategic short-term operational mitigations are needed to ensure the security of our operational technology (OT) systems, which are enhanced by instilling trust and are separate from vendors implementing CIE principles.

25 ENERGY STORAGE↗

IEEE PES GM Poster - Cyber-Informed Engineering Approach to Mitigating BESS Supply Chain Concerns

Battery energy storage systems (BESS) are increasingly important to meet the needs of grid resilience and reliability. BESS provide critical grid services, maintaining stability of the grid with increased variable conditions. However, there are significant geopolitical and security concerns regarding their operation in critical infrastructure, due to lack of a domestic supply chain and prevalence of foreign entity of concern (FEOC) components in BESS and associated inverter-based resources. The supply chain challenge is dually exacerbated by a lack of alternative suppliers who can meet the economic targets for energy delivery and a potentially adversarial supply chain. Solutions are needed to secure components, addressing mixed layers of risk and engineering controls. This paper presents a specific application of Cyber-Informed Engineering (CIE) principles for BESS and recommends an alternative strategy to blocking the supply chain, ensuring that grid modernization targets can be met despite lack of a validated or secure supply chain. This study focuses on the United State (U.S.) use case, but the process can be applied globally to address supply chain security challenges. CIE practices represent the next step in functional assurance and risk mitigation, ensuring optimal resource allocation and enhancing security measures to safeguard the future of energy in the U.S. and beyond.

25 - ENERGY STORAGE↗