Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Avionic test units”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Flight Test Techniques

These proceedings contain the twenty-five papers presented a the AGARD Flight Mechanics Panel Symposium on Flight Test Techniques, held in Lisbon, Portugal, 2-5 April 1984. Under main headings of Performance and Flying Qualities, Systems Testing, and Instrumentation and Facilities, papers were given on Lift-Drag; Parameter Identification; High-Angle Testing; Flight and Release of External Stores; Pilot Workload; Avionics, Navigation and Weapons Systems; H.U.D.; Real-Time Analysis and Test Control; Airborne Computation and Calibration; Laser Measurement of True Airspeed and Windshear; Clearance for Repaired Runway Operation.

Checkout

Participant Training for a Flight Test Evaluation of Interval Management

Interval Management is a concept designed to be used by air traffic controllers and flight crews to more efficiently and precisely manage inter-aircraft spacing. NASA, in cooperation with Boeing, Honeywell, and United Airlines, tested an avionics prototype onboard flight test aircraft. A critical need was identified to train the pilots participating in the flight test prior to the first flight. This paper documents the flight training regimen that successfully trained the pilots on the Interval Management concepts and flight crew procedures and suggests potential improvements to future training regimens for industry use.

Roper, Roy

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying

Flight Test Evaluation of the ATD-1 Interval Management Application

Interval Management (IM) is a concept designed to be used by air traffic controllers and flight crews to more efficiently and precisely manage inter-aircraft spacing. Both government and industry have been working together to develop the IM concept and standards for both ground automation and supporting avionics. NASA contracted with Boeing, Honeywell, and United Airlines to build and flight test an avionics prototype based on NASA's spacing algorithm and conduct a flight test. The flight test investigated four different types of IM operations over the course of nineteen days, and included en route, arrival, and final approach phases of flight. This paper examines the spacing accuracy achieved during the flight test and the rate of speed commands provided to the flight crew. Many of the time-based IM operations met or exceeded the operational design goals set out in the standards for the maintain operations and a subset of the achieve operations. Those operations which did not meet the goals were due to issues that are identified and will be further analyzed.

Swieringa, Kurt A.

Proposed Development of NASA Glenn Research Center's Aeronautical Network Research Simulator

Accurate knowledge and understanding of data link traffic loads that will have an impact on the underlying communications infrastructure within the National Airspace System (NAS) is of paramount importance for planning, development and fielding of future airborne and ground-based communications systems. Attempting to better understand this impact, NASA Glenn Research Center (GRC), through its contractor Computer Networks & Software, Inc. (CNS, Inc.), has developed an emulation and test facility known as the Virtual Aircraft and Controller (VAC) to study data link interactions and the capacity of the NAS to support Controller Pilot Data Link Communications (CPDLC) traffic. The drawback of the current VAC test bed is that it does not allow the test personnel and researchers to present a real world RF environment to a complex airborne or ground system. Fortunately, the United States Air Force and Navy Avionics Test Commands, through its contractor ViaSat, Inc., have developed the Joint Communications Simulator (JCS) to provide communications band test and simulation capability for the RF spectrum through 18 GHz including Communications, Navigation, and Identification and Surveillance functions. In this paper, we are proposing the development of a new and robust test bed that will leverage on the existing NASA GRC's VAC and the Air Force and Navy Commands JCS systems capabilities and functionalities. The proposed NASA Glenn Research Center's Aeronautical Networks Research Simulator (ANRS) will combine current Air Traffic Control applications and physical RF stimulation into an integrated system capable of emulating data transmission behaviors including propagation delay, physical protocol delay, transmission failure and channel interference. The ANRS will provide a simulation/stimulation tool and test bed environment that allow the researcher to predict the performance of various aeronautical network protocol standards and their associated waveforms under varying density conditions. The system allows the user to define human-interactive and scripted aircraft and controller models of various standards, such as (but not limited to) Very High Frequency Digital Link (VDL) of various modes.

Nguyen, Thanh C.

2010 JANNAF Abstract Propulsion System Status: Ares First Stage

In November 2005, NASA created the Constellation Program to develop an entirely new fleet of spacecraft to include the Ares I Crew Launch Vehicle and the Ares V Cargo Launch vehicles. The Ares I First Stage Team has made significant progress on the design of a propulsion system capable of lofting that new fleet. To minimize technical risks and development costs, the Solid Rocket Boosters (SRBs) of Shuttle served as a starting point in the design of a new motor that would meet the requirements of those new vehicles. By bringing in a fifth segment, this new propulsive element will provide greater total impulse to loft a safer, more powerful fleet of space flight vehicles. Additional modifications include the use of composite structures, new metallic forward structures, new parachutes, a new propellant grain design, and a new nozzle. Although still ongoing and in process, significant design, development and concept testing has already been conducted. This includes a full-scale motor firing, deceleration subsystem testing, and testing of several complete avionics line replaceable units. The suborbital development flight, Ares I-X, provided the opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack. The Ares I-X test flight has also informed our Ares First Stage design. It brought a more comprehensive understanding in a number of areas, which are now being analyzed. This paper will provide an overview of the design, development, challenges, and progress on the production of the new Ares First Stage propulsion system. Challenges and mitigation strategies will be addressed. An overview will also be included of testing to date.

Tiller, Bruce K.

Implementation of Real-Time Hardware in the Loop Simulation for WAVE Instrument Avionics

The Regolith and Environment Science and Oxygen and Lunar Volatile Extraction (RESOLVE) payload will lead the Resource Prospector rover to hydrogen-rich locations on the moon supporting NASA's in-situ resource utilization (ISRU) mission. The Water Analysis and Volatile Extraction (WAVE) system will be responsible for heating up regolith samples and analyzing their volatiles in a vaporized state. Given the space environment, testing flight hardware and software using the scientific instruments can be costly and time consuming, which can hold back progress involving the instruments. A hardware-in-the-loop (HITL) simulation will test the Avionics Data Acquisition as well as the Instrument Interface Unit, through simulating sensors and actuators involved in supporting the WAVE instruments. HITL is a platform for testing and developing WAVE's avionics and software, where the simulation plant will imitate the LAVA and OVEN instruments, thus allowing for an accessible, efficient, and replicable testing environment.

Al Qaraghuli, Ali

Colloid Microthruster Flight Performance Results from Space Technology 7 Disturbance Reduction System

Space Technology 7 Disturbance Reduction System (ST7-DRS) is a NASA technology demonstration payload as part of the ESA LISA Pathfinder (LPF) mission, which launched on December 3, 2015. The ST7-DRS payload includes colloid microthrusters as part of a drag-free dynamic control system (DCS) hosted on an integrated avionics unit (IAU) with spacecraft attitude and test mass position provided by the LPF spacecraft computer and the highly sensitive gravitational reference sensor (GRS) as part of the LISA Technology Package (LTP). The objective of the DRS was to validate two technologies: colloid micro-Newton thrusters (CMNT) to provide low-noise control capability of the spacecraft, and drag-free flight control. The CMNT were developed by Busek Co., Inc., in a partnership with NASA Jet Propulsion Laboratory (JPL), and the DCS algorithms and flight software were developed at NASA Goddard Space Flight Center (GSFC). ST7-DRS demonstrated drag-free operation with 10nmHz level precision spacecraft position control along the primary axis of the LTP using eight CMNTs that provided 5-30 N each with 0.1 N precision. The DCS and CMNTs performed as required and as expected from ground test results, meeting all Level 1 requirements based on on-orbit data and analysis. DRS microthrusters operated for 2400 hours in flight during commissioning activities, a 90-day experiment and the extended mission. This mission represents the first validated demonstration of electrospray thrusters in space, providing precision spacecraft control and drag-free operation in a flight environment with applications to future gravitational wave observatories like LISA.

Ziemer, John

NASA's Space Launch System: Unprecedented Payload Capabilities

As part of a renewed focus on deep space exploration, NASA and its private sector and international partners are building a new super heavy-lift launch vehicle, the Space Launch System (SLS), as well as the new Orion crew vehicle, and upgrading launch facilities at Kennedy Space Center. Progress made on the Block 1 vehicle, as well as its expected performance metrics and fiscal support from the U.S. administration and Congress, have opened up additional manifest possibilities that the Agency continues to evaluate. Offering a combination of power, payload capacity and departure energy unmatched in contemporary boosters, the SLS family of launch vehicles features the world's most-proven propulsion system: solid rocket boosters and RS-25 main engines with a modified existing cryogenic in-space stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) of payload to trans-lunar injection (TLI). The vehicle's flexible architecture will enable the rocket to evolve over the next decade to meet the most demanding deep space mission requirements. The second configuration, Block 1B, will deliver at least 34 to 40 t to TLI, depending on whether the crewed or cargo variant is selected. Although designed to facilitate human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with affordable access to deep space. For the first integrated mission of SLS and Orion, launching from Kennedy Space Center in fiscal year 2020, SLS Block 1 will send Orion on a 25.5-day mission to a distant retrograde lunar orbit with the primary objective to test and validate new systems and procedures. That first mission, called Exploration Mission-1 (EM-1), also has 13 6U-class CubeSat payloads manifested. Those payloads, which will carry out a variety of scientific experiments and technology demonstrations, will deploy in several locations along the trajectory after Orion has separated from SLS. Contractors and suppliers have made significant progress since last year manufacturing the Block 1 vehicle for EM-1. The upper stage and adapters are complete as are the four RS-25 engines. All other major components are constructed and being outfitted for flight. In fact, hardware for the second flight is currently being manufactured at locations across the United States. This paper will outline hardware, avionics and testing progress toward the first and second flights of SLS. Manifest opportunities for primary, co-manifested and secondary payloads will be discussed. An in-depth look at payload utilization and integration will be provided, as well as lessons learned from installing a secondary payload deployment system for EM-1.

Creech, Steve

Design and Technology Maturation of the Stratospheric Projectile Experiment of Entry Dynamics

The supersonic and transonic dynamic stability of blunt-body reentry vehicles currently poses large risks in all of NASA’s ongoing entry missions (MSR SRL, MSR EES, and Dragonfly). These projects have allocated millions of dollars to testing and modeling efforts to buy down risk by using the current state-of-the-art (SoA) facilities at NASA’s disposal. While these facilities have heritage in supplying dynamics data to reentry missions, their availability is severely limited – particularly with the high number of concur-rent projects requesting simultaneous testing– and are costly when considering the science density per dollar. None of the current SoA facility methodologies allow the test model to have the dynamics fully develop through a flight relevant free-stream profile and as such require extrapolations with resultant high uncertainties in order to relate the test dynamics to flight expectations. SPEED is a NASA Ames Center Innovation Fund (CIF) project that is developing a highly tailorable and cost-effective test methodology to better assess the dynamic stability of blunt-body reentry vehicles via a stratospheric balloon flight. This is accomplished by dropping a suite of instrumented capsules from a stratospheric balloon to gain a statistically relevant dataset of scaled reentry vehicles in mission relevant free-flight conditions. This presentation will walk through how the test methodology is being implemented specifically for the Mars Sample Return (MSR) Earth Entry System (EES) geometry in an awarded Flight Opportunities Program (FOP) test flight in early CY24. SPEED Application to MSR: SPEED consists of three main mechanical systems: the Drop Platform, the Projectile, and the test Capsule. SPEED is being developed as a set of guidelines and recommendations for how to test with the proposed Concept of Operations (Conops) since the specific design parameters will vary depending on the specific project’s reference trajectory and entry vehicle design. As such, this presentation will walk through the development time-line as shown in Fig. 2. This is meant to serve as a blueprint for further missions as desired. Mechanical and Avionics Design. The SPEED test platform designed for the MSR-EES capsule geometry with nominal entry parameters has the ability to carry 10 Capsules to altitude instrumented with: 1. 3-Axis Accelerometer 2. IMU 3. Gyroscope 4. Magnetometer 5. Pressure Transducer cruciform 6. Uplook and Horizon Cameras To package the avionics/instrumentation suite, the capsule is approximately 1’ in diameter with the Outer Mold Line (OML) centroid-scaled from the full EES design. The internal volume is gutted and custom-shaped to fit the desired instrumentation suite, as well as to allow for the positioning of ballast mass such that the Center of Gravity is analogous to the flight vehicle. All structural components in the Capsule and Projectile are 3D printed, which significantly reduces the cost of each flight unit to around $1500 including all instrumentation, avionics, and structural components. Flight Conops. The test Capsule is accelerated to the desired altitude and Mach number while stowed in the Projectile, a missile-like vehicle consisting of steel ballast in the nose, a low-drag OML, and an Ejection Mechanism to reliably release the Capsule into the free-flow supersonic conditions. For the MSR-EES design, the capsule employs ~3kg of ballast mass at the nose to accelerate the 1.25kg test Capsule to ~Mach 1.7 at 23km altitude. This requires an initial release altitude of 40km, the quoted limit of a 80kg payload by the FOP-contracted balloon provider. Once the Ejection Mechanism avionics detect the proper conditions, the spring-loaded Ejection Mechanism will release and – guided by the sabot – expose the test Capsule to the desired test conditions for ~5 seconds of free-flight in the supersonic/transonic regimes. Dynamics in the subsonic regime will also be captured with the instrumentation suite with post-flight recovery operations aimed at recovering the high-G-load capable SD cards after the planned hard impact landings. Testing and Development: In the few months the SPEED project has worked the development of MSR-EES flight test, the team has performed lab and drone based testing which this presentation will overview. After the first design phase, the team fabricated Engineering Demonstration Units (EDUs) of all subsystems to perform validation testing shown in Fig. 5. After validation was completed on the subsystem level, a drone-drop test was performed at the recreational flight ceiling of 400ft altitude to assess the SPEED systems in a flight environment. Parameters such as in-flight stability, hard impact landing performance, and avionics performance were quantified and qualified. The FY23 CIF will culminate in a helicopter drop test aboard an Air National Guard Blackhawk. This will prepare the team for the CY24 FOP stratospheric balloon flight that should provide the final verification to begin offering the test platform for mission support. Focus of Presentation: This presentation will outline the technology maturation path of the SPEED implementation to the MSR-EES capsule baseline as well as the details regarding the mechanical system, avionics and instrumentation, and flight operations. Note that a complementary presentation is being submitted for a methodology overview of the SPEED test platform, introducing the testing technique and benefits as well as the full application space of the technology.

pitch damping coefficient

Air Traffic Management Technology Demostration-1 (ATD-1) Avionics Phase 2 Flight Test and Results

NASA’s first Air Traffic Management Technology Demonstration (ATD-1) subproject successfully completed 19 days of flight test validation in January and February 2017 of an Interval Management (IM) avionics prototype and the procedures used to conduct IM arrival and approach operations. IM is one of the three elements integrated into NASA’s ATD-1 concept of operations with the subproject goal of improving aircraft efficiency and airport throughput during high-density arrival operations. The ATD-1 concept of operations combines advanced arrival scheduling, controller decision support tools, and interval management (IM) avionics to enable merging of multiple, time-based, efficient arrival streams. IM contributes to the operation by calculating speeds that enable an aircraft to precisely achieve a specific time or distance behind another aircraft. When precise spacing intervals can be calculated, achieved, and then maintained during high-density operations, aircraft efficiency should be improved by enabling the aircraft to remain closer to the optimum descent trajectory instead of using vectors and step-down altitudes, and airport throughput should be maintained or improved by each aircraft arriving at the runway threshold closer to the assigned spacing interval. This avionics development and flight test was conducted under a NASA contract by Boeing Research and Technology, with Boeing Commercial Aircraft, Honeywell, United Airlines, and Jeppesen as sub-contractors. The Honeywell built IM avionics were the first ever prototype built based on NASA requirements as well as developing and non-flight tested international IM standards, integrated into two test aircraft, and then flown in real-world conditions at the Grant County International Airport (KMWH). The IM prototype flown in the flight test used data from the Ownship and the assigned lead, or Target, aircraft to calculate the airspeed necessary for the Ownship to achieve the desired spacing. The flight test demonstrated that the IM avionics prototype generally met the IM requirement for spacing accuracy. However, the control laws implemented require further development to reduce the high IM speed command rate and the number of speed reversals observed during the test. Pilots assessed the IM procedure as acceptable, and issues requiring further attention were identified. In summary, the IM avionics prototype showed significant promise in contributing to the goals of improving aircraft efficiency and airport throughput. The flight test results also provided important data to the FAA and the working group developing the follow-on version of the international IM standards.

Baxley, Brian T.

Air Traffic Management Technology Demonstration-1 (ATD-1) Avionics Phase 2 Flight Test Training for Interval Management

Prior to the successful flight test validation of a new avionics prototype, participants from Boeing, Honeywell, and United Airlines underwent group training at NASA Langley Research Center. New prototype software for an algorithm which enables greater efficiency in high-density airspace, called Interval Management, was to be incorporated into Electronic Flight Bags and placed in the cockpit for pilot usage. The goals of the training were to teach the flight test pilots how to operate the new software, establish techniques to simultaneously position three aircraft prior to each test scenario, and ensure a common communication protocol among team members when coordinating the position of aircraft for the next scenario. The multi-tiered interactive training regimen consisted of a process that continually built upon previous foundational material. The primary learning elements were 1) a portable computer-based trainer that was provided to the pilots prior to classroom training sessions, 2) classroom learning, 3) full mock-up simulator training, and 4) refresher training just prior to the flight test. Each part of the regimen was designed to repeat and build upon the previous element. The purpose of this Technical Memorandum is to inform the aviation industry how flight training for Interval Management was conducted at Langley Research Center in order to reduce overall development costs of future Interval Management training programs. Secondly, the paper provides insight regarding the decision-making process when attempting to conduct a flight test.

Roper, Roy D.

High Energy/LET Radiation EEE Parts Certification Handbook

Certifying electronic components is a very involved process. It includes pre-coordination with the radiation test facility for time, schedule and cost, as well as intimate work with designers to develop test procedures and hardware. It also involves work with radiation engineers to understand the effects of the radiation field on the test article/setup as well as the analysis and production of a test report. The technical content of traditional ionizing radiation testing protocol is in wide use and generally follows established standards (ref. Appendix C). This document is not intended to cover all these areas but to cover the methodology of using Variable Depth Bragg Peak (VDBP) to accomplish the goal of characterizing an electronic component. The Variable Depth Bragg Peak (VDBP) test method is primarily used for deep space applications of electronics. However, it can be used on any part for any radiation environment, especially those parts where the sensitive volume cannot be reached by the radiation beam. An example of this problem would be issues that arise in de-lidding of parts or in parts with flip-chip designs, etc. The VDBP method is ideally suited to test modern avionics designs which increasingly incorporate commercial off-the-shelf (COTS) parts and units. Johnson Space Center (JSC) developed software provides assistance to users in developing the radiation characterization data from the raw test data.

Reddell, Brandon

An Analysis of the Speed Commands from an Interval Management Algorithm during the ATD-1 Flight Test

NASA's first Air Traffic Management Technology Demonstration (ATD-1) successfully completed a nineteen-day flight test under a NASA contract with Boeing, with Honeywell and United Airlines as sub-contractors. An Interval Management (IM) avionics prototype was built based on international IM standards, integrated into two test aircraft, and then flown in real-world conditions to determine if the goals of improving aircraft efficiency and airport throughput during high-density arrival operations could be met. This paper describes the speed behavior of the IM avionics prototype, focusing on the speed command rate and the number of speed increases.

Watters, Christine

An overview of autonomous rendezvous and docking system technology development at General Dynamics

The Centaur avionics suite is undergoing a dramatic modernization for the commercial, DoD Atlas and Titan programs. The system has been upgraded to the current state-of-the-art in ring laser gyro inertial sensors and Mil-Std-1750A processor technology. The Cruise Missile avionic system has similarly been evolving for many years. Integration of GPS into both systems has been underway for over five years with a follow-on cruise missile system currently in flight test. Rendezvous and Docking related studies have been conducted for over five years in support of OMV, CTV, and Advanced Upper Stages, as well as several other internal IR&D's. The avionics system and AR&D simulator demonstrated to the SATWG in November 1990 has been upgraded considerably under two IR&D programs in 1991. The Centaur modern avionics system is being flown in block upgrades which started in July of 1990. The Inertial Navigation Unit will fly in November of 1991. The Cruise Missile avionics systems have been fully tested and operationally validated in combat. The integrated AR&D system for space vehicle applications has been under development and testing since 1990. A Joint NASA / GD ARD&L System Test Program is currently being planned to validate several aspects of system performance in three different NASA test facilities in 1992.

Kuenzel, Fred

Robotics Verification and Validation Strategies for Perseverance Rover Sampling and Caching

The Mars 2020 Sampling and Caching Subsystem(SCS) is the most complex robotic system ever fielded on a MarsRover. It includes a 5 degree-of-freedom Robotic Arm, coringdrill, gas Dust Removal Tool, interfaces for two turret-mountedinstruments, and an Adaptive Caching Assembly (ACA). TheACA is itself a complex robotic system, containing hardware tosupport docking and bit exchange, a 3 degree-of-freedomSample Handling Assembly for manipulating sample tubes,storage for several drill bits and sample tubes, and mechanismsto support observing and sealing samples collected by the drill.To successfully verify and validate the SCS hardware andsoftware and its integration with the Mars 2020 flight systemseveral key strategies were employed.The SCS Verification and Validation (V&V) program utilizedmultiple test venues with tiered levels of fidelity. These includedsimulation and visualization software environments, low fidelitydevelopment testbeds, testbeds with high fidelity SCS hardwareand commercial off-the shelf avionics, integrated systemtestbeds with flight-like avionics, and environmental testbedscapable of simulating Martian surface temperature andpressure. Multiple units of each SCS hardware componentmoved fluidly between test venues to accomplish myriadstandalone and coordinated test objectives. Test preparationand executions were performed by a diverse team of engineerswith training and technical ownership tailored for individualexperience and role. Despite significant differences between testvenues, the SCS V&V team established efficient and consistentprocesses and tools for procedure development, test execution,and data review that enabled personnel, as well as technicalproducts such as sequences and parameter configurations, toflow between venues effectively. A series of benchmark testsprovided evidence of performance consistency as elements weretransferred between venues and as system capability evolved.This paper provides an overview of the SCS V&V program andexplores several overarching strategies that enabled successfuloperation in the face of unprecedented complexity. Keyoutcomes of the SCS validation effort are summarized, alongwith lessons learned and beneficial integrations of validationtool and process innovations into Mars surface operations.

Brooks, Sawyer

Testing of the high accuracy inertial navigation system in the Shuttle Avionics Integration Lab

The description, results, and interpretation is presented of comparison testing between the High Accuracy Inertial Navigation System (HAINS) and KT-70 Inertial Measurement Unit (IMU). The objective was to show the HAINS can replace the KT-70 IMU in the space shuttle Orbiter, both singularly and totally. This testing was performed in the Guidance, Navigation, and Control Test Station (GTS) of the Shuttle Avionics Integration Lab (SAIL). A variety of differences between the two instruments are explained. Four, 5 day test sessions were conducted varying the number and slot position of the HAINS and KT-70 IMUs. The various steps in the calibration and alignment procedure are explained. Results and their interpretation are presented. The HAINS displayed a high level of performance accuracy previously unseen with the KT-70 IMU. The most significant improvement of the performance came in the Tuned Inertial/Extended Launch Hold tests. The HAINS exceeded the 4 hr specification requirement. The results obtained from the SAIL tests were generally well beyond the requirements of the procurement specification.

Strachan, Russell L.

SMART: The Future of Spaceflight Avionics

A novel avionics approach is necessary to meet the future needs of low cost space and lunar missions that require low mass and low power electronics. The current state of the art for avionics systems are centralized electronic units that perform the required spacecraft functions. These electronic units are usually custom-designed for each application and the approach compels avionics designers to have in-depth system knowledge before design can commence. The overall design, development, test and evaluation (DDT&E) cycle for this conventional approach requires long delivery times for space flight electronics and is very expensive. The Small Multi-purpose Advanced Reconfigurable Technology (SMART) concept is currently being developed to overcome the limitations of traditional avionics design. The SMART concept is based upon two multi-functional modules that can be reconfigured to drive and sense a variety of mechanical and electrical components. The SMART units are key to a distributed avionics architecture whereby the modules are located close to or right at the desired application point. The drive module, SMART-D, receives commands from the main computer and controls the spacecraft mechanisms and devices with localized feedback. The sensor module, SMART-S, is used to sense the environmental sensors and offload local limit checking from the main computer. There are numerous benefits that are realized by implementing the SMART system. Localized sensor signal conditioning electronics reduces signal loss and overall wiring mass. Localized drive electronics increase control bandwidth and minimize time lags for critical functions. These benefits in-turn reduce the main processor overhead functions. Since SMART units are standard flight qualified units, DDT&E is reduced and system design can commence much earlier in the design cycle. Increased production scale lowers individual piece part cost and using standard modules also reduces non-recurring costs. The benefit list continues, but the overall message is already evident: the SMART concept is an evolution in spacecraft avionics. SMART devices have the potential to change the design paradigm for future satellites, spacecraft and even commercial applications.

Alhorn, Dean C.