Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

IBPSA Project 2 BOPTEST: An update on the test cases available in the framework for testing advanced control strategies in buildings

Project 2 develops software infrastructure, test cases, and extensions for the Building Optimization Testing Framework (BOPTEST) to address the expanding needs of building and urban energy system controls through open international collaboration. This paper provides an overview of the new test cases available as of BOPTEST version 0.7.1. Each test case is developed using open-source Modelica libraries and Spawn of EnergyPlus, enabling the creation of high-fidelity building models that incorporate envelope dynamics, Heating Ventilation and Air Conditioning (HVAC) systems, and explicit control representations. Currently, eight test cases are available, with five additional cases under development. These test cases cover a wide range of climates, building types, and HVAC systems. This paper compiles and summarizes test case descriptions, cites original manuscripts that developed them for a more detailed description, and reports baseline control performance metrics. Furthermore, two example applications are presented: one illustrating different levels of control, from supervisory to low-level, and another demonstrating how Model Predictive Control (MPC) solutions must be adapted from continuous to integer to control some building actuators.

Zanetti, Ettore

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is essential that management and engineering understand the need for an availability requirement for the customer's space transportation system as it enables the meeting of his needs, goal, and objectives. There are three types of availability, e.g., operational availability, achieved availability, or inherent availability. The basic definition of availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. The major difference is the inclusiveness of the functions within the mean downtime and the mean uptime. This paper will address tIe inherent availability which only addresses the mean downtime as that mean time to repair or the time to determine the failed article, remove it, install a replacement article and verify the functionality of the repaired system. The definitions of operational availability include the replacement hardware supply or maintenance delays and other non-design factors in the mean downtime. Also with inherent availability the mean uptime will only consider the mean time between failures (other availability definitions consider this as mean time between maintenance - preventive and corrective maintenance) that requires the repair of the system to be functional. It is also essential that management and engineering understand all influencing attributes relationships to each other and to the resultant inherent availability requirement. This visibility will provide the decision makers with the understanding necessary to place constraints on the design definition for the major drivers that will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system provided the customer. This inherent availability requirement may be driven by the need to use a multiple launch approach to placing humans on the moon or the desire to control the number of spare parts required to support long stays in either orbit or on the surface of the moon or mars. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also provide the capability to bound the variables providing engineering the insight required to control the system's engineering solution. An example of this visibility will be the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also the relationship visibility of selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement or accepting a larger parts count with the resulting higher reliability requirement. This paper will provide an understanding for the relationship of mean repair time (mean downtime) to maintainability, e.g., accessibility for repair, and both mean time between failure, e.g., reliability of hardware and the system inherent availability. Having an understanding of these relationships and resulting requirements before starting the architectural design concept definition will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russel E.

Space Transportation System Availability Relationships to Life Cycle Cost

Future space transportation architectures and designs must be affordable. Consequently, their Life Cycle Cost (LCC) must be controlled. For the LCC to be controlled, it is necessary to identify all the requirements and elements of the architecture at the beginning of the concept phase. Controlling LCC requires the establishment of the major operational cost drivers. Two of these major cost drivers are reliability and maintainability, in other words, the system's availability (responsiveness). Potential reasons that may drive the inherent availability requirement are the need to control the number of unique parts and the spare parts required to support the transportation system's operation. For more typical space transportation systems used to place satellites in space, the productivity of the system will drive the launch cost. This system productivity is the resultant output of the system availability. Availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. Since many operational factors cannot be projected early in the definition phase, the focus will be on inherent availability which is equal to the mean time between a failure (MTBF) divided by the MTBF plus the mean time to repair (MTTR) the system. The MTBF is a function of reliability or the expected frequency of failures. When the system experiences failures the result is added operational flow time, parts consumption, and increased labor with an impact to responsiveness resulting in increased LCC. The other function of availability is the MTTR, or maintainability. In other words, how accessible is the failed hardware that requires replacement and what operational functions are required before and after change-out to make the system operable. This paper will describe how the MTTR can be equated to additional labor, additional operational flow time, and additional structural access capability, all of which drive up the LCC. A methodology will be presented that provides the decision makers with the understanding necessary to place constraints on the design definition. This methodology for the major drivers will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system. This methodology will focus on the achievement of an affordable, responsive space transportation system. It is the intent of this paper to not only provide the visibility of the relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also to provide the capability to bound the variables, thus providing the insight required to control the system's engineering solution. An example of this visibility is the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also, selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement, or require accepting a larger parts count with the resulting higher individual part reliability requirements. This paper will provide an understanding of the relationship of mean repair time (mean downtime) to maintainability (accessibility for repair), and both mean time between failure (reliability of hardware) and the system inherent availability.

Rhodes, Russel E.

Methodology for the systems engineering process. Volume 3: Operational availability

A detailed description and explanation of the operational availability parameter is presented. The fundamental mathematical basis for operational availability is developed, and its relationship to a system's overall performance effectiveness is illustrated within the context of identifying specific availability requirements. Thus, in attempting to provide a general methodology for treating both hypothetical and existing availability requirements, the concept of an availability state, in conjunction with the more conventional probability-time capability, is investigated. In this respect, emphasis is focused upon a balanced analytical and pragmatic treatment of operational availability within the system design process. For example, several applications of operational availability to typical aerospace systems are presented, encompassing the techniques of Monte Carlo simulation, system performance availability trade-off studies, analytical modeling of specific scenarios, as well as the determination of launch-on-time probabilities. Finally, an extensive bibliography is provided to indicate further levels of depth and detail of the operational availability parameter.

Nelson, J. H.

Availability analysis of the traveling-wave maser amplifiers in the deep space network. Part 1: The 70-meter antennas

The results of the reliability and availability analyses of the individual S- and X-band traveling-wave maser (TWM) assemblies and their operational configurations in the 70-meter antennas of NASA's Deep Space Network (DSN) are described. For the period 1990 through 1991, the TWM availability parameters for the Telemetry Data System are: mean time between failures (MTBF), 930 hr; mean time to restore services (MTTRS), 1.4 hr; and the average availability, 99.85 percent. In previously published articles, the performance analysis of the TWM assemblies was confined to the determination of the parameters specified above. However, as the mean down time (MDT) for the repair of TWM's increases, the levels of the TWM operational availabilities and MTTRS are adversely affected. A more comprehensive TWM availability analysis is presented to permit evaluation of both MTBF and MDT effects. Performance analysis of the TWM assemblies, based on their station monthly failure reports, indicates that the TWM's required MTBF and MDT levels of 3000 hr and 36 to 48 hr, respectively, have been achieved by the TWM's only at the Canberra Deep Space Station (DSS 43). The Markov Process technique is employed to develop suitable availability measures for the S- and X-band TWM configurations when each is operated in a two-assembly standby mode. The derived stochastic expressions allow for the evaluation of those configurations' simultaneous availability for the Antenna Microwave Subsystem. The application of these expressions to demonstrate the impact of various levels of TWM maintainability (or MDT) on their configurations' operational availabilities is presented for each of the 70-m antenna stations.

Issa, T. N.

Application of the BSRN Data in Validating the GEWEX SRB Data: Quality-Control and Resulting Available Monthly Means

The BSRN data have been used in validation of the satellite-based GEWEX SRB data, and the recent Release 4.0-IP data cover the 34-year period from July 1983 to June 2017. Here we focus on the validation of the shortwave monthly means from 1992 to 2017 against the BSRN Global 1. We first perform the BSRN-recommended quality-control on the original data. We then calculate the monthly-hourly means from which we calculate the monthly means. Twenty-four (24) monthly-hourly means are required to calculate a monthly mean. To guarantee the quality of the monthly mean, we also require that 95% or more hourly means be available in order for a monthly-hourly mean to be calculated. Since the above quality-control significantly reduces the number of available monthly means, we are curious how many monthly means we would get if we relax the quality-control, and how the resulting monthly means would compare with the GEWEX SRB data. In a version we experimented, only constant upper and lower bounds are imposed on various fluxes, and the original data are largely retained. We found that many more monthly means would be available, and the overall bias and RMS would not be significantly different from that of the strict quality-control. With the strict quality-control, if we let Avail (minimum percentage of available hourly means required for a monthly-hourly mean to be computed) change from 3.2% to 95%, the Bias/RMS/N change from -2.77/20.56/9756 to -0.35/13.41/4581, where N is the number of available monthly means, and Bias and RMS are in the unit of W/sq. m. On the other hand, with the lax quality-control, when Avail changes from 3.2% to 95%, the Bias/RMS/N change from -0.82/19.53/9819 to -0.21/14.41/5875. South Pole (SPO) is one of the sites we are particularly interested in. With the strict quality-control, and when Avail changes from 3.2% to 95%, the Bias/RMS/N change from 5.89/15.85/283 to 1.23/5.52/133; with the lax quality-control, the Bias/RMS/N change from 1.17/11.21/284 to 1.88/7.9/177.

Taiping Zhang

Evaluating the combined effects of light and water availability on the early growth and physiology of Tamarindus indica : Implications for restoration

Abstract Premise The tamarind tree (Tamarindus indica) is a species of significant cultural, economic, and ecological value, with a pantropical distribution. However, the tamarind is experiencing a decline in wild populations in its native range, but the reasons for its decline remain unknown. Methods We examined the critical early life‐history stages for tamarind establishment to understand how varying levels of light and water availability and watering frequency affect its regeneration. Through three greenhouse experiments, we assessed the impact of these resources on the germination, survival, growth, and physiological responses of tamarind seedlings and saplings. Results Water availability was critical for seed germination, but not light levels or pre‐germination treatments. Light was the primary limiting factor for seedling growth. Tamarinds in high light availability grew taller, had more biomass and larger diameter, but the effect of light was modulated by water availability, indicating that there was an interaction between both resources. Water and light affected specific leaf area and leaf dry matter content but not biomass allocation, root‐to‐shoot ratio, or stomatal conductance. Water availability influenced sapling growth, but watering frequency did not, indicating a resilience of tamarind saplings to changes in rainfall periodicity but a sensitivity to total rainfall amounts. Conclusions Our study underscores the importance of considering both light and water availability in tamarind restoration efforts and contribute to understanding plant responses and trade‐offs under different levels of critical resources. Our findings will inform conservation strategies to support the regeneration and long‐term survival ofTamarindus indicain its native habitats.

Plant Sciences

Repository of HydroSMADE: Hydropower Site-level Monthly Availability Data Ensemble for 1950-2100 at Existing and Potential Global Sites

This repository presents HydroSMADE—Hydropower Site-level Monthly Availability Data Ensemble, a new open dataset that provides monthly hydropower availability for 1,593 existing and 124,333 potential sites worldwide over the period 1950–2100. The dataset is generated by using a global hydrologic model (Xanthos) with explicit representation of hydropower operation. Specifically, HydroSMADE distinguishes between storage and diversion sites, applies optimized operating rules, and incorporates site-specific characteristics such as generation capacity, maximum turbine flow, and reservoir storage. Driven by bias-corrected meteorological inputs, the data is provided for 30 alternative future scenarios. The scenarios consist of the full factorial combination of three standard CMIP6 atmospheric forcing pathways (SSP1-2.6, SSP3-7.0, and SSP5-8.5) and ten CMIP6 General Circulation Models (GCMs): GFDL-ESM4, IPSL-CM6A-LR, MPI-ESM1-2-HR, MRI-ESM2-0, EC-Earth3, CanESM5, MIROC6, CNRM-ESM2-1, UKESM1-0-LL, and CNRM-CM6-1. The repository contains a total of 122 files: a text file (readme.txt) containing a brief description of the included data, a CSV file containing site attributes, and the remaining 120 files (in CSV) containing site-level monthly hydropower availability. Example Jupyter Notebooks to explore the HydroSMADE dataset are available on GitHub at https://github.com/kamal0013/HydroSMADE More details on the methods and technical validation of HydroSMADE are available in the following paper by the same authors: Chowdhury, A. K., Abeshu, G. W., Zhao, M., Wild, T. B., Hassan, N., Ying, Z., Kim, G. J., Matthew, B., Jonathan, L., & Li, H.-Y. (Submitted). Hydropower Site-level Monthly Availability Data Ensemble for 1950-2100 at Existing and Potential Global Sites.

Existing and Potential Sites

Space Station Freedom electric power system availability study

The results are detailed of follow-on availability analyses performed on the Space Station Freedom electric power system (EPS). The scope includes analyses of several EPS design variations, these are: the 4-photovoltaic (PV) module baseline EPS design, a 6-PV module EPS design, and a 3-solar dynamic module EPS design which included a 10 kW PV module. The analyses performed included: determining the discrete power levels that the EPS will operate at upon various component failures and the availability of each of these operating states; ranking EPS components by the relative contribution each component type gives to the power availability of the EPS; determining the availability impacts of including structural and long-life EPS components in the availability models used in the analyses; determining optimum sparing strategies, for storing space EPS components on-orbit, to maintain high average-power-capability with low lift-mass requirements; and analyses to determine the sensitivity of EPS-availability to uncertainties in the component reliability and maintainability data used.

Turnquist, Scott R.

Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

Turnquist, S. R.

Availability Estimation for Facilities in Extreme Geographical Locations

A value added analysis for the Reliability. Availability and Maintainability of McMurdo Ground Station was developed, which will be a useful tool for system managers in sparing, maintenance planning and determining vital performance metrics needed for readiness assessment of the upgrades to the McMurdo System. Output of this study can also be used as inputs and recommendations for the application of Reliability Centered Maintenance (RCM) for the system. ReliaSoft's BlockSim. a commercial Reliability Analysis software package, has been used to model the availability of the system upgrade to the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Ground Station at McMurdo Station in the Antarctica. The logistics challenges due to the closure of access to McMurdo Station during the Antarctic winter was modeled using a weighted composite of four Weibull distributions. one of the possible choices for statistical distributions throughout the software program and usually used to account for failure rates of components supplied by different manufacturers. The inaccessibility of the antenna site on a hill outside McMurdo Station throughout one year due to severe weather was modeled with a Weibull distribution for the repair crew availability. The Weibull distribution is based on an analysis of the available weather data for the antenna site for 2007 in combination with the rules for travel restrictions due to severe weather imposed by the administrating agency, the National Science Foundation (NSF). The simulations resulted in an upper bound for the system availability and allowed for identification of components that would improve availability based on a higher on-site spare count than initially planned.

Fischer, Gerd M.

Retrieving Aerosol in a Cloudy Environment: Aerosol Availability as a Function of Spatial and Temporal Resolution

The challenge of using satellite observations to retrieve aerosol properties in a cloudy environment is to prevent contamination of the aerosol signal from clouds, while maintaining sufficient aerosol product yield to satisfy specific applications. We investigate aerosol retrieval availability at different instrument pixel resolutions, using the standard MODIS aerosol cloud mask applied to MODIS data and a new GOES-R cloud mask applied to GOES data for a domain covering North America and surrounding oceans. Aerosol availability is not the same as the cloud free fraction and takes into account the technqiues used in the MODIS algorithm to avoid clouds, reduce noise and maintain sufficient numbers of aerosol retrievals. The inherent spatial resolution of each instrument, 0.5x0.5 km for MODIS and 1x1 km for GOES, is systematically degraded to 1x1 km, 2x2 km, 4x4 km and 8x8 km resolutions and then analyzed as to how that degradation would affect the availability of an aerosol retrieval, assuming an aerosol product resolution at 8x8 km. The results show that as pixel size increases, availability decreases until at 8x8 km 70% to 85% of the retrievals available at 0.5 km have been lost. The diurnal pattern of aerosol retrieval availability examined for one day in the summer suggests that coarse resolution sensors (i.e., 4x4 km or 8x8 km) may be able to retrieve aerosol early in the morning that would otherwise be missed at the time of current polar orbiting satellites, but not the diurnal aerosol properties due to cloud cover developed during the day. In contrast finer resolution sensors (i.e., 1x1 km or 2x2 km) have much better opportunity to retrieve aerosols in the partly cloudy scenes and better chance of returning the diurnal aerosol properties. Large differences in the results of the two cloud masks designed for MODIS aerosol and GOES cloud products strongly reinforce that cloud masks must be developed with specific purposes in mind and that a generic cloud mask applied to an independent aerosol retrieval will likely fail.

Remer, Lorraine A.

Advancing Our Understanding of System Availability through the PV Fleet Performance Data Initiative

The PV Fleet Performance Data Initiative partners with photovoltaic (PV) fleet owners to collect time-series data of PV production data and publishes aggregated anonymized results of system performance metrics. With an extensive dataset drawn from over 2,200 PV systems across the United States, comprising 8.5 GW and 24,000 separate inverter data channels, this initiative aims to ensure that systemic risks in the US PV fleet are detected. The current work explores system availability, revealing a pronounced dependence on time, especially within the initial 6 months of system performance. Following this start-up period, the average system availability stabilizes. Statistical analyses illustrate a median (P5O) monthly availability of 0.991 and a dependence on system size with a negative trend in availability with increasing system size. This finding indicates that larger systems experience lower availability compared to their smaller counterparts.

inverter availability

Impacts of Solar Land Availability on the Evolution of the U.S. Power System

Long-term planning scenarios of the United States electricity system have not identified solar resource availability to be a limiting factor in how much solar capacity might be deployed. However, there are some smaller regions where siting challenges indicate solar deployment could be limited by solar resource availability. In this work, we use geospatial modeling tools to develop a restrictive siting scenario that significantly reduces the amount and location of utility-scale solar resources. We use that restrictive siting regime, along with other previously defined siting scenarios, to examine how solar resource availability impacts the buildout of the electricity system using business-as-usual and decarbonization futures in a national-scale capacity expansion model. The restrictive siting scenario uses observed siting pressures to exclude many types of land on which development is allowed today and results in a greater than 90% reduction in solar resource potential-to approximately 3000 GW. Even with this drastic reduction, utility-scale solar capacity grows by more than 3 times through 2050 in the business-as-usual scenarios and by more than 6 times in the decarbonization scenarios, though less solar is deployed in scenarios with lower available solar resource. We quantify how system costs and generation mixes change as solar resource availability changes.

14 SOLAR ENERGY

What Shapes Transportation Charging Infrastructure Availability? Evidence from Tennessee

This study examines how community, travel, and freight characteristics relate to public charging infrastructure availability across Tennessee ZIP codes. We link Alternative Fuels Data Center station locations with traffic, socioeconomic, demographic, commuting, and freight employment data to build a ZIP code-level dataset. Ordinary least squares regression captures variation in chargers per 10,000 residents (R2=0.311). Quantile regressions at the 25th, 50th, and 75th percentiles, with pseudo R2 values up to 0.099, show that the determinants of infrastructure availability differ across low-, medium-, and high-availability areas. Percent female, percent car commuters, average household size, and median age are negatively associated with charging availability across much of the distribution. Truck traffic is positively associated only in lower-availability ZIP codes, while vehicle miles traveled shifts from a negative association at the lower end of the distribution to a positive association at the upper end. The results provide insight into how public charging deployment aligns with community characteristics, mobility demand, and freight activity across Tennessee. Future work can distinguish charger types and power levels, incorporate land-use and temporal rollout patterns, and examine how charging infrastructure needs differ across urban and rural contexts.

Calderón, Oriana [University of Tennessee, Knoxvil

Conus-Wide Mapping of Water Availability and Cost

Background: New demands for water can be satisfied through a variety of source options. In some basins surface and/or groundwater may be available through permitting with the state water management agency (termed unappropriated water), alternatively water might be purchased and transferred out of its current use to another (termed appropriated water), or non-traditional water sources can be captured and treated (e.g., wastewater). The relative availability and cost of each source are key factors in the development decision. Unfortunately, these measures are location dependent with no consistent or comparable set of data available for evaluating competing water sources. With the help of water managers, water availability was mapped for over 2500 watersheds throughout CONUS. These values are unique in that they account for institutional factors (i.e., water rights, compacts, treaties, instream flows) that locally limit water use. Five water sources were individually examined, including unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Associated costs to acquire, convey and treat the water, as necessary, for each of the five sources were estimated. These metrics were developed to support regional water planning and policy analysis with initial application to electric transmission planning in the western US. Problem: These data were originally developed in 20141 and updated in 20182. New datasets on which these data depend have been published. As such, there is need to update the water availability and cost data. There is also need to map this same data to a county resolution and to publish the data in a more accessible place. Organization of the dataset: Data are organized according to five primary water sources: • Unappropriated fresh surface water • Unappropriated fresh groundwater • Appropriated water • Recycled wastewater, and • Brackish water

Tidwell, Vincent [Pacific Northwest National Labor

NASCOM network ground communications availability report

A performance analysis of NASCOM Network circuits is presented. An objective of 99.80 percent availability has been established for all network circuits and an acceptable level of 99.50. A network narrative summary for the current month includes changes in network configurations, current month's totals for modes of service and trouble category losses, a discussion of trends, and significant losses that affected the performance indexes of individual or groups of circuits. A table and narrative summary of those circuits that failed to meet the objective of 99.80% availability for all network circuits and an acceptable level of 99.50. Lost time and interruption tables showing all circuits affected by outages, by trouble category, with their total time and events, scheduled operating hours, and individual availability indexes also are included. Selected circuits whose availabilities have or continue to affect the overall network availability are also analyzed.

Source record

Estimation of surface moisture availability from remote temperature measurements

Analysis of moisture availability, determined from GOES IR surface temperature measurements and a boundary layer model, and antecedent precipitation are presented for data taken over Texas and Argentina. Correlations between antecedent precipitation and moisture availability are high where the spatial variation in moisture availability is much larger than an inherent uncertainty in the method, which is judged to be about + or - 0.2 for the moisture availability parameter. In regions where there are large gradients of precipitation, the IR method can provide useful information on variations in soil moisture availability and, by implication, in precipitation.

Flores, Alberto L.