Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Astronautical Instruments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Proceedings of the 25th International Instrumentation Symposium, May 7-10, 1979, Anaheim, California

The papers deal essentially with the instrumentation needs of the transportation industry, machinery diagnostics, and energy research. The sessions covered include: acoustic emission, reentry vehicle ground and flight testing, performance of nose tip materials, instrumentation for solar heating and cooling systems, vibration measurement, data acquisition and analysis, system for aerospace pressure measurements, wind tunnel instrumentation and control, energy source instrumentation, nondestructive testing, pressure and flow measurements, automated test facilities, strain measurements, electrooptical instrumentation, thermal measurements, microcomputer applications in instrumentation and automation, flight testing, blast pressure measurement, two-phase liquid/gas mass flow measurement, and machinery monitoring and instrumentation.

Conferences

Mechanical Design of Spacecraft

In the spring of 1962, engineers from the Engineering Mechanics Division of the Jet Propulsion Laboratory gave a series of lectures on spacecraft design at the Engineering Design seminars conducted at the California Institute of Technology. Several of these lectures were subsequently given at Stanford University as part of the Space Technology seminar series sponsored by the Department of Aeronautics and Astronautics. Presented here are notes taken from these lectures. The lectures were conceived with the intent of providing the audience with a glimpse of the activities of a few mechanical engineers who are involved in designing, building, and testing spacecraft. Engineering courses generally consist of heavily idealized problems in order to allow the more efficient teaching of mathematical technique. Students, therefore, receive a somewhat limited exposure to actual engineering problems, which are typified by more unknowns than equations. For this reason it was considered valuable to demonstrate some of the problems faced by spacecraft designers, the processes used to arrive at solutions, and the interactions between the engineer and the remainder of the organization in which he is constrained to operate. These lecture notes are not so much a compilation of sophisticated techniques of analysis as they are a collection of examples of spacecraft hardware and associated problems. They will be of interest not so much to the experienced spacecraft designer as to those who wonder what part the mechanical engineer plays in an effort such as the exploration of space.

MARINER SPACE PROBE

MEAD In-situ Sampling and Testing at Haughton Crater

The Mars Exploration through Analog-site Drilling (MEAD) project is designed to demonstrate the feasibility and scientific value of robotic drilling missions to Mars in the search for evidence of past or extant life. MEAD conducts high-fidelity field simulations integrating drilling, autonomous operations, and in-situ life-detection and mineralogical instruments. The project tests the Signs of Life Detector (SOLID), proposed for the 2019 Discovery Mars Icebreaker mission, and ARIA (Astronaut Raman Instrument for ISRU and Astrobiology), which provides mineral identification and detects trace organics and volatiles, including indicators of organic thermal maturity. Because current and planned Mars drilling missions operate largely “blind,” MEAD also evaluates the use of drill-induced vibrations recorded by deployed geophones to enable local subsurface mapping for improved targeting of drilling and sampling. In August 2025, MEAD completed its first-year field deployment to Haughton Crater in the Canadian High Arctic, an established Mars impact-crater terrestrial analog site, bringing a Honeybee Robotics TRIDENT drill with applied automation, alongside ARIA, SOLID, and FleetSpace geophones.

Haughton Crater

Shuttle-Mir [Мир-Шаттл] Supplement

This is a companion to an illustrated history book with the same title. This set of electronic files includes the full text and images in the book, as well as additional material. Interviews, photographs, and biographies of the U.S. Astronauts, cosmonauts, and team members for the Shuttle-Mir Program are available. STS Mission Summaries for each mission involved can be viewed, including launch and landing details, crew lists, and mission highlights. Photographs and videos from each mission are included, as well as diagrams of different spacecraft, and computer-generated animations of the Mir deorbit, collision, and flyaround. Additional documents include mission status reports, published documents, news releases, personal letters, and oral histories. The experiments carried out on Mir are described, highlighting combustion and fluid physics research, life in microgravity, and research of the development of the solar system. The focus on improving space technology and planning for the International Space Station is explained. The main features of the book itself include: (1) Training and Operations; (2) Long Duration Psychology; (3) Bilingual Blues; and (4) Earth Observations.

Astronautics

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

Effect of Microgravity on Several Visual Functions During STS Shuttle Missions

Many astronauts and cosmonauts have commented on apparent changes in their vision while on-orbit. Comments have included statements of supposed improved distance acuity to decreased near vision capability. The purpose of this study was to assess not only changes in visual acuity, but expand the assessment to several other visual functions for a comprehensive battery of tests. Vision was assessed using an innovative device, the Visual Function Tester - Model 1 (VFT-1), which presents the tests at optical infinity and includes critical flicker fusion, stereopsis to 10 seconds-of-arc, visual acuity in small steps to 20/7.7, cyclophoria, lateral and vertical phoria, and retinal rivalry. Vision was assessed 2 times prelaunch at L-14 days and L-7 days, 3-4 times while on-orbit, at landing, and 2 times postlanding at L+3 days and L+7 days. There were 26 STS astronauts that participated, with data on 20 astronauts used for analysis. There was a typical wide variability between subjects in baseline visual performance for each parameter at the prelaunch sessions. There was a slight but statistically significant decrease in visual acuity while on-orbit that was not clinically significant. For stereopsis (i.e. depth perception), there was a small improvement on-orbit that was not statistically significant. There were no changes during space flight for any of the other visual parameters tested. A few individuals showed apparent changes in acuity and stereopsis. The possibility exists that microgravity affects the visual system of some individuals differently, as with space adaptation syndrome. Repeat data on 2 astronauts showed good repeatability between the 2 flights. These results pertain to only short term space flight on the STS shuttle, and longer flights are necessary to determine if there is any relationship between mission duration and these visual functions.

Melvin R O'Neal

NASA Talks: Earth to Mars in 3 Giant Leaps

“Earth to Mars in 3 Giant Leaps” will explain why, despite landing astronauts on the Moon more than 40 years ago, humanity has not yet sent people to Mars. Astronaut Dr. Stan Love will demonstrate that the challenge is not simply building bigger rockets, it is overcoming the immense engineering, logistical, and human obstacles required for a safe round-trip mission to the Red Planet. The first giant leap focuses on Low Earth Orbit, where the International Space Station serves as humanity's laboratory for living and working in space; the second giant leap revisits the Apollo missions to the Moon, illustrating the extraordinary amount of energy required to travel beyond Earth orbit; and the third and greatest leap explores human exploration of Mars.

Stan Love

Lunar and Planetary X-Ray Diffraction Program: Progress Report of Research and Instrument Development, July 1964 to March 1965

The Lunar and Planetary X-Ray Diffraction Program consists of three concurrent efforts aimed at rapid development of a first-generation flight-instrument system, evaluation of potential advances in diffractometer components for a possible second-generation instrument, and full investigation of the capabilities and limitations of rock analysis by X-ray diffraction. More complete descriptions of each of these studies are given below; the papers which follow are grouped according to these subjects in Sections II through V.

PETROLOGY

Advanced Non-Intrusive Instrumentation for Propulsion Engines

Changes in engine technology such as higher temperatures, higher tip speeds, new metal/composite/ceramic materials together with radical changes in design philosophy will require amongst other prerequisites the ability to measure and to monitor key internal gas and structural characteristics. The symposium papers presented non-intrusive measurement and analysis technologies in the following categories: Laser Point Measurements (11); Absorption and Infrared Techniques (4); Paints - Surface Sensors (6); Laser Induced Fluorescence (6); Mechanical (7); Films (5); Laser Planar Measurement (9); and a Keynote Address.

Propulsion

Landsat Instrument Suite (LandIS) Sensor Design for the Landsat 10 Mission

Landsat 10 will be the upcoming mission in the 50+ year Landsat series of Earth observation platforms. The centerpiece of the observatory will be a super-spectral imager known as the Landsat Instrument Suite (LandIS). The sensor will feature 26 spectral channels from the visible through near-, short-wave, and thermal infrared wavelengths with spatial resolutions of 10, 20, and 60 meters on the ground, depending on the band. These enhancements over the legacy Landsat instruments will ensure data continuity with the existing archive and will expand upon the core Landsat capabilities to enable new applications in Earth science. After a competitive procurement, NASA selected the design submitted by the Raytheon Company for the LandIS instrument. The innovative Raytheon instrument concept utilizes an advanced whiskbroom architecture to fulfill the strict radiometric, spatial, and geometric image quality requirements demanded by the Landsat 10 mission and fits within restrictive mass, volume, and power constraints. The instrument will continue the Landsat directive to image all daylit land and near-shore water areas, along with select nighttime imaging. On-board calibration source data will ensure high radiometric and geometric accuracy and stability consistent with previous missions to enable continuity in data products available to users. This paper discusses the driving requirements for LandIS and provides a description of the chosen design and operations concept of the instrument.

Requirements