Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “All Hazards Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Integrated Hazard Analysis Integrator

Hazard analysis addresses hazards that arise in the design, development, manufacturing, construction, facilities, transportation, operations and disposal activities associated with hardware, software, maintenance, operations and environments. An integrated hazard is an event or condition that is caused by or controlled by multiple systems, elements, or subsystems. Integrated hazard analysis (IHA) is especially daunting and ambitious for large, complex systems such as NASA s Constellation program which incorporates program, systems and element components that impact others (International Space Station, public, International Partners, etc.). An appropriate IHA should identify all hazards, causes, controls and verifications used to mitigate the risk of catastrophic loss of crew, vehicle and/or mission. Unfortunately, in the current age of increased technology dependence, there is the tendency to sometimes overlook the necessary and sufficient qualifications of the integrator, that is, the person/team that identifies the parts, analyzes the architectural structure, aligns the analysis with the program plan and then communicates/coordinates with large and small components, each contributing necessary hardware, software and/or information to prevent catastrophic loss. As viewed from both Challenger and Columbia accidents, lack of appropriate communication, management errors and lack of resources dedicated to safety were cited as major contributors to these fatalities. From the accident reports, it would appear that the organizational impact of managers, integrators and safety personnel contributes more significantly to mission success and mission failure than purely technological components. If this is so, then organizations who sincerely desire mission success must put as much effort in selecting managers and integrators as they do when designing the hardware, writing the software code and analyzing competitive proposals. This paper will discuss the necessary and sufficient requirements of one of the significant contributors to mission success, the IHA integrator. Discussions will be provided to describe both the mindset required as well as deleterious assumptions/behaviors to avoid when integrating within a large scale system.

Morris, A. Terry↗

Timing of Formal Phase Safety Reviews for Large-Scale Integrated Hazard Analysis

Integrated hazard analysis (IHA) is a process used to identify and control unacceptable risk. As such, it does not occur in a vacuum. IHA approaches must be tailored to fit the system being analyzed. Physical, resource, organizational and temporal constraints on large-scale integrated systems impose additional direct or derived requirements on the IHA. The timing and interaction between engineering and safety organizations can provide either benefits or hindrances to the overall end product. The traditional approach for formal phase safety review timing and content, which generally works well for small- to moderate-scale systems, does not work well for very large-scale integrated systems. This paper proposes a modified approach to timing and content of formal phase safety reviews for IHA. Details of the tailoring process for IHA will describe how to avoid temporary disconnects in major milestone reviews and how to maintain a cohesive end-to-end integration story particularly for systems where the integrator inherently has little to no insight into lower level systems. The proposal has the advantage of allowing the hazard analysis development process to occur as technical data normally matures.

Massie, Michael J.↗

Hydrothermal Liquefaction Treatment Hazard Analysis Report

Hazard analyses were performed to evaluate the modular hydrothermal liquefaction treatment system. The hazard assessment process was performed in 2 stages. An initial assessment utilizing Hazard Identification and Preliminary Hazards Analysis (PHA) techniques identified areas with significant or unique hazards (process safety-related hazards) that fall outside of the normal operating envelope of PNNL and warranted additional analysis. The subsequent assessment was based on a qualitative What-If analysis. The analysis was augmented, as necessary, by additional quantitative analysis for scenarios involving a release of hazardous material or energy with the potential for affecting the public. The following selected hazardous scenarios received increased attention: •Scenarios involving a release of hazardous material or energy, controls were identified in the What-If analysis table that prevent the occurrence or mitigate the effects of the release. •Scenarios with significant consequences that could impact personnel outside the immediate operations area, quantitative analyses were performed to determine the potential magnitude of the scenario. The set of “critical controls” were identified for these scenarios (see Section 4) which prevent the occurrence or mitigate the effects of the release of events with significant consequences.

09 BIOMASS FUELS↗

HAZARD ANALYSIS OF DIGITAL ENGINEERED SAFETY FEATURES ACTUATION SYSTEM IN ADVANCED NUCLEAR POWER PLANTS USING A REDUNDANCY-GUIDED APPROACH

Replacing the existing aging analog instrumentation and control (I&C) systems with modern safety control and protection digital technology offers one of the foremost means of performance improvements and cost reductions for the existing nuclear power plants (NPPs). However, the qualification of digital I&C systems remains a challenge, especially considering the issue of software common-cause failures (CCFs), which are difficult to address. With the application and upgrades of advanced digital I&C systems, software CCFs have become a potential threat to plant safety because most redundant designs use similar digital platforms or software in the operating and application systems. With complex designs of multilayer redundancy to meet the single-failure criterion, digital I&C safety systems (e.g., engineered safety-features actuation system [ESFAS]) are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. This paper applies a modularized approach to conduct redundancy-guided systems-theoretic hazard analysis for an advanced digital ESFAS with multilevel redundancy designs. Systematic methods and risk-informed tools are incorporated to address both hardware and software CCFs, which provide guidance to eliminate the triggers of potential single points of failure in the design of digital safety systems in advanced plant designs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An Independent Evaluation of the FMEA/CIL Hazard Analysis Alternative Study

The present instruments of safety and reliability risk control for a majority of the National Aeronautics and Space Administration (NASA) programs/projects consist of Failure Mode and Effects Analysis (FMEA), Hazard Analysis (HA), Critical Items List (CIL), and Hazard Report (HR). This extensive analytical approach was introduced in the early 1970's and was implemented for the Space Shuttle Program by NHB 5300.4 (1D-2. Since the Challenger accident in 1986, the process has been expanded considerably and resulted in introduction of similar and/or duplicated activities in the safety/reliability risk analysis. A study initiated in 1995, to search for an alternative to the current FMEA/CIL Hazard Analysis methodology generated a proposed method on April 30, 1996. The objective of this Summer Faculty Study was to participate in and conduct an independent evaluation of the proposed alternative to simplify the present safety and reliability risk control procedure.

Ray, Paul S.↗

A Redundancy-Guided Approach for the Hazard Analysis of Digital Instrumentation and Control Systems in Advanced Nuclear Power Plants

We report digital instrumentation and control (I&C) upgrades are a vital research area for the nuclear industry. Despite their performance benefits, deployment of digital I&C in nuclear power plants (NPPs) has been limited. Digital I&C systems exhibit complex failure modes including common cause failures (CCFs), which can be difficult to identify. This paper describes the development of a redundancy-guided application of the Systems-Theoretic Process Analysis and fault tree analysis for the hazard analysis of digital I&C in advanced NPPs. The resulting Redundancy-Guided Systems-Theoretic Hazard Analysis (RESHA) is applied for the case study of a representative state-of-the-art digital reactor trip system. The analysis qualitatively and systematically identifies the most critical CCFs and other hazards of digital I&C systems. Ultimately, the RESHA can help researchers make informed decisions for how, and to what degree, defensive measures such as redundancy, diversity, and defense in depth can be used to mitigate or eliminate the potential hazards of digital I&C systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessing the need for an update of a probabilistic seismic hazard analysis using a SSHAC Level 1 study and the Seismic Hazard Periodic Reevaluation Methodology

A key decision for nuclear facilities is evaluating the need for an update of an existing seismic hazard analysis in light of new data and information that has become available since the time that the analysis was completed. We introduce the newly developed risk-informed Seismic Hazard Periodic Review Methodology (referred to as the SHPRM) and present how a Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 probabilistic seismic hazard analysis (PSHA) was performed in an implementation of this new methodology. The SHPRM offers a defensible and documented approach that considers both the changes in seismic hazard and engineering-based risk information of an existing nuclear facility to assess the need for an update of an existing PSHA. The SHPRM has seven evaluation criteria that are employed at specific analysis, decision, and comparison points which are applied to seismic design categories established for nuclear facilities in United States. The SHPRM is implemented using a SSHAC Level 1 study performed for the Idaho National Laboratory, USA. The implementation focuses on the first six of the seven evaluation criteria of the SHPRM which are all provided from the SSHAC Level 1 PSHA. Finally, to illustrate outcomes of the SHPRM that do not lead to the need for an update and those that do, the example implementations of the SHPRM are performed for nuclear facilities that have target performance goals expressed as the mean annual frequency of unacceptable performance at 1x10 -4 , 4x10 -5 and 1x10 -5 .

58 GEOSCIENCES↗

NASA Hazard Analysis Process

This viewgraph presentation reviews The NASA Hazard Analysis process. The contents include: 1) Significant Incidents and Close Calls in Human Spaceflight; 2) Subsystem Safety Engineering Through the Project Life Cycle; 3) The Risk Informed Design Process; 4) Types of NASA Hazard Analysis; 5) Preliminary Hazard Analysis (PHA); 6) Hazard Analysis Process; 7) Identify Hazardous Conditions; 8) Consider All Interfaces; 9) Work a Preliminary Hazard List; 10) NASA Generic Hazards List; and 11) Final Thoughts

Deckert, George↗

Evaluating FRI3D for Cost Savings in Fire Hazard Analysis at DOE Sites

A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.

97 - MATHEMATICS AND COMPUTING↗

Demonstration of Integrated Hazard Analysis for Digital Reactor Trip Systems

Digital instrumentation and control (I&C) upgrades are a vital research area for nuclear industry. Despite their performance benefits, deployment of digital I&C in nuclear power plants (NPPs) has been limited. Digital I&C systems exhibit complex failure modes including common cause failures (CCFs) which can be difficult to identify. This paper describes the development of a redundancy-guided application of the Systems-Theoretic Process Analysis (STPA) and Fault Tree Analysis (FTA) for the hazard analysis of digital I&C in advanced NPPs. The resulting Redundancy-guided System-theoretic Hazard Analysis (RESHA) is applied for the case study of a representative state-of-the-art digital reactor trip system. The analysis qualitatively and systematically identifies the most critical CCFs and other hazards of digital I&C systems. Ultimately, RESHA can help researchers make informed decisions for how, and to what degree, defensive measures such as redundancy, diversity, and defense-in-depth can be used to mitigate or eliminate the potential hazards of digital I&C systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hanford Site-Wide Probabilistic Seismic Hazard Analysis

The site-wide probabilistic seismic hazard analysis (PSHA) of the Hanford Site (hereafter Hanford PSHA) in southeastern Washington State was undertaken by Pacific Northwest National Laboratory (PNNL) and its contractors for the U.S. Department of Energy (DOE) Office of River Protection (ORP), DOE Richland Operations Office (RL), and Energy Northwest to provide a detailed characterization of the vibratory ground motion hazard at the Hanford Site from potential future earthquakes. The study was conducted to fulfill the requirements for DOE facilities as well as those for commercial nuclear power plants, through a collaboration and joint sponsorship between DOE and Energy Northwest. The study fulfills the requirement to develop an update to the PSHA as required by DOE Order. In addition, the study fulfills the requirement from the U.S. Nuclear Regulatory Commission (NRC) that Energy Northwest conduct a PSHA using Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 procedures for the Columbia Generating Station. Because the Hanford Site includes several facility sites, the PSHA has been conducted such that seismic hazard is calculated at five sites that are located across the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WE-G-BRA-07: Analyzing the Safety Implications of a Brachytherapy Process Improvement Project Utilizing a Novel System-Theory-Based Hazard-Analysis Technique

Purpose: To investigate the hazards in cervical-cancer HDR brachytherapy using a novel hazard-analysis technique, System Theoretic Process Analysis (STPA). The applicability and benefit of STPA to the field of radiation oncology is demonstrated. Methods: We analyzed the tandem and ring HDR procedure through observations, discussions with physicists and physicians, and the use of a previously developed process map. Controllers and their respective control actions were identified and arranged into a hierarchical control model of the system, modeling the workflow from applicator insertion through initiating treatment delivery. We then used the STPA process to identify potentially unsafe control actions. Scenarios were then generated from the identified unsafe control actions and used to develop recommendations for system safety constraints. Results: 10 controllers were identified and included in the final model. From these controllers 32 potentially unsafe control actions were identified, leading to more than 120 potential accident scenarios, including both clinical errors (e.g., using outdated imaging studies for planning), and managerial-based incidents (e.g., unsafe equipment, budget, or staffing decisions). Constraints identified from those scenarios include common themes, such as the need for appropriate feedback to give the controllers an adequate mental model to maintain safe boundaries of operations. As an example, one finding was that the likelihood of the potential accident scenario of the applicator breaking during insertion might be reduced by establishing a feedback loop of equipment-usage metrics and equipment-failure reports to the management controller. Conclusion: The utility of STPA in analyzing system hazards in a clinical brachytherapy system was demonstrated. This technique, rooted in system theory, identified scenarios both technical/clinical and managerial in nature. These results suggest that STPA can be successfully used to analyze safety in brachytherapy and may prove to be an alternative to other hazard analysis techniques.

60 APPLIED LIFE SCIENCES↗

Hazard Analysis for Building 34 Vacuum Glove Box Assembly

One of the characteristics of an effective safety program is the recognition and control of hazards before mishaps or failures occur. Conducting potentially hazardous tests necessitates a thorough hazard analysis in order to prevent injury to personnel, and to prevent damage to facilities and equipment. The primary purpose of this hazard analysis is to define and address the potential hazards and controls associated with the Building 34 Vacuum Glove Box Assembly, and to provide the applicable team of personnel with the documented results. It is imperative that each member of the team be familiar with the hazards and controls associated with his/her particular tasks, assignments and activities while interfacing with facility test systems, equipment and hardware. In fulfillment of the stated purposes, the goal of this hazard analysis is to identify all hazards that have the potential to harm personnel, damage the facility or its test systems or equipment, test articles, Government or personal property, or the environment. This analysis may also assess the significance and risk, when applicable, of lost test objectives when substantial monetary value is involved. The hazards, causes, controls, verifications, and risk assessment codes have been documented on the hazard analysis work sheets in Appendix A of this document. The preparation and development of this report is in accordance with JPR 1700.1, "JSC Safety and Health Handbook" and JSC 17773 Rev D "Instructions for Preparation of Hazard Analysis for JSC Ground Operations".

Meginnis, Ian↗

Hydrotreater/Distillation Column Hazard Analysis Report Rev. 2

This project Hazard and Risk Analysis Report contains the results of several hazard analyses and risk assessments. An initial assessment was conducted in 2012, which included a multi-step approach ranging from design reviews to a formal What-If hazard analysis. A second What-If hazard analysis was completed during February 2013 to evaluate the operation of the hydrotreater/distillation column processes to be installed in a process enclosure within the Process Development Laboratory West (PDL-West) facility located on the PNNL campus. The qualitative analysis included participation of project and operations personnel and applicable subject matter experts. The analysis identified potential hazardous scenarios, each based on an initiating event coupled with a postulated upset condition. The unmitigated consequences of each hazardous scenario were generally characterized as a process upset; the exposure of personnel to steam, vapors or hazardous material; a spray or spill of hazardous material; the creation of a flammable atmosphere; or an energetic release from a pressure boundary.

54 ENVIRONMENTAL SCIENCES↗

Work Plan for the Site-wide SSHAC Level 3 Probabilistic Seismic Hazard Analysis at INL

This work plan provides the overall framework, key activities, key tasks, and schedule for the execution of a probabilistic seismic hazard analysis at Idaho National Laboratory (INL). The probabilistic seismic hazard analysis will follow processes and procedures appropriate for the Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study provided in U. S. Nuclear Regulatory Commission guidance, NUREG-2213. The SSHAC Level 3 probabilistic seismic hazard analysis (PSHA) is being conducted as an INL site-wide effort. The work plan was developed and revised by participants who will perform the SSHAC Level 3 PSHA. The work plan also includes the quality assurance requirements commensurate with American Society of Mechanical Engineers Nuclear Quality Assurance NQA 1 2008/2009 and 2011 Addendum for design nuclear facilities under the U.S. Department of Energy and U. S. Nuclear Regulatory Commission. The scope of the SSHAC Level 3 PSHA is designed to produce the mean-centered definition of the seismic hazard with the appropriate treatment of uncertainties supported by the associated technical justifications. The SSHAC Level 3 study will properly implement and completely document the activities of evaluation, integration, and documentation. The evaluation process will consider data, models, and methods proposed by the larger technical community that are relevant to the PSHA at INL. The integration process will build seismic-source and ground-motion characterization models that represent the center, body, and range of technically defensible interpretations, taking into consideration the outcomes of the evaluation process. Key tasks and activities—such as a project kickoff meeting, three workshops, four formal working meetings, and a briefing meeting with the Participatory Peer Review Panel—will occur for the seven-member technical integration teams to construct seismic-source and ground-motion-characterization models. Both preliminary and final hazard-input documents will be developed to perform sensitivity analyses and the final PSHA, respectively. The entire study will be thoroughly documented in draft and final reports. The Participatory Peer Review Panel will review the SSHAC Level 3 study from start to finish, including the draft and final INL Site-wide PSHA reports, so they can provide a closure letter documenting the study’s adherence to SSHAC processes and technical adequacy of the final products.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗