Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Agile”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

NASA Agile Community of Practice 2024-2026 Report

This 2024-2026 report provides a summary of the products and activities executed by the NASA Agile Community of Practice (CoP) during its second and third years. Building on the foundation established in its inaugural year, the CoP continued to advance Agile values and principles across NASA centers. The report highlights key initiatives, including specialized framework training, AI integration in Agile toolkits, and active participation in agency-wide project management and systems engineering workshops.

Agile

The Roman Space Telescope Optical System: Status, Test, and Verification Update

The Nancy Grace Roman Space Telescope (“Roman”) is NASA’s next flagship observatory. Launching in 2026, Roman will explore the nature of dark energy as well as expand the census of exoplanets in our galaxy via microlensing. Roman’s large field of view, agile survey capabilities, and excellent stability enable these scientific objectives, yet present unique challenges for the design, test, and verification of its optical system. Roman recently completed a comprehensive thermal vacuum test of the Spacecraft bus + Integrated Payload Assembly (SCIPA), followed by integrating the Outer Barrel Assembly (OBA), Solar Array Sunshield (SASS), and Deployable Aperture Cover (DAC) with SCIPA to complete the Observatory. This paper will present an overview of the thermal vacuum optical testing as well as a status of the optical system performance and verification.

Matthew Bolcar

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion