Overview of High Power Vacuum Dry RF Load Designs

A specific feature of RF linacs based on the pulsed traveling wave (TW) mode of operation is that only a portion of the RF energy is used for the beam acceleration. The residual RF energy has to be terminated into an RF load. Higher accelerating gradients require higher RF sources and RF loads, which can stably terminate the residual RF power. RF feeders (from the RF source though the accelerating section to the load) are vacuumed to transmit multi-megawatt high power RF. This overview will outline vacuumed RF loads only. A common method to terminate multi-MW RF power is to use circulated water (or other liquid) as an absorbing medium. A solid dielectric interface (a high quality ceramic) is required to separate vacuum and liquid RF absorber mediums. Using such RF load approaches in TW linacs is troubling because there is a fragile ceramic window barrier and a failure could become catastrophic for linac vacuum and RF systems. Traditional loads comprising of a ceramic disk have limited peak and average power handling capability and are therefore not suitable for high gradient TW linacs. This overview will focus on ''vacuum dry'' or ''all-metal'' loads that do not employ any dielectric interface between vacuum and absorber. The first prototype is an original design of RF loads for the Stanford Two-Mile Accelerator.

43 PARTICLE ACCELERATORS↗

A Solid-State Nanosecond Beam Kicker Modulator Based on the DSRD Switch

A fast solid-state beam kicker modulator is under development at the SLAC National Accelerator Laboratory. The program goal is to develop a modulator that will deliver 4 ns, {+-}5 kV pulses to the ATF2 damping ring beam extraction kicker. The kicker is a 50 {Omega}, bipolar strip line, 60 cm long, fed at the downstream end and terminated at the upstream end. The bunch spacing in the ring is 5.6 ns, bunches are removed from the back end of the train, and there is a gap of 103.6 ns before the next train. The modulator design is based on an opening switch topology that uses Drift Step Recovery Diodes as the opening switches. The design and results of the modulator development are discussed. There are many applications that benefit from very fast high power switching. However, at MW power levels and nanosecond time scales, solid state options are limited. One option, the Drift Step Recovery Diode (DSRD) has been demonstrated as capable of blocking thousands of volts and switching in nanosecond to sub-nanosecond ranges. When used as an opening switch, the DSRD exhibits a very fast turn off transient. The process is described in detail by its pioneers in [5,6]. In essence, charge is pumped into and then extracted from the DSRD under pulsed conditions. The turn off transient occurs precisely when the pumped charge is equal to the extracted charge and the DSRD is switched off. At the SLAC National Accelerator Laboratory, a DSRD is being used as an opening switch in the development of a fast kicker modulator. The modulator is designed to create {+-}5kV pulses with <1ns rise and fall time on a 50{Omega} strip line kicker. As is common in beam optics, the absence of power in the kicker before and after the pulse is very important. The entire {+-}5kV kicker modulator is composed of two identical 5kV pulsing circuits, each with its own DSRD component. This paper describes the modulator topology and the status of tests on one of the two 5kV pulse circuits.

43 PARTICLE ACCELERATORS↗

Recent Upgrade of the Klystron Modulator at SLAC

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

43 PARTICLE ACCELERATORS↗

A Stability of LCLS Linac Modulators

Information concerning to a stability of LCLS RF linac modulators is allocated in this paper. In general a 'pulse-to-pulse' modulator stability (and RF phase as well) is acceptable for the LCLS commission and FEL programs. Further modulator stability improvements are possible and approaches are discussed based on our experimental results.

43 PARTICLE ACCELERATORS↗

The LCLS Undulator Beam Loss Monitor Readout System

The LCLS Undulator Beam Loss Monitor System is required to detect any loss radiation seen by the FEL undulators. The undulator segments consist of permanent magnets which are very sensitive to radiation damage. The operational goal is to keep demagnetization below 0.01% over the life of the LCLS. The BLM system is designed to help achieve this goal by detecting any loss radiation and indicating a fault condition if the radiation level exceeds a certain threshold. Upon reception of this fault signal, the LCLS Machine Protection System takes appropriate action by either halting or rate limiting the beam. The BLM detector consists of a PMT coupled to a Cherenkov radiator located near the upstream end of each undulator segment. There are 33 BLMs in the system, one per segment. The detectors are read out by a dedicated system that is integrated directly into the LCLS MPS. The BLM readout system provides monitoring of radiation levels, computation of integrated doses, detection of radiation excursions beyond set thresholds, fault reporting and control of BLM system functions. This paper describes the design, construction and operational performance of the BLM readout system.

43 PARTICLE ACCELERATORS↗

S-Band Loads for SLAC Linac

The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

36 MATERIALS SCIENCE↗

Digitally Controlled High Availability Power Supply

This paper will report on the test results of a prototype 1320 watt power module for a high availability power supply. The module will allow parallel operation for N+1 redundancy with hot swap capability. The two quadrant output of each module allows pairs of modules to provide a 4 quadrant (bipolar) operation. Each module employs a novel 4 FET buck regulator arranged in a bridge configuration. Each side of the bridge alternately conducts through a small saturable ferrite that limits the reverse current in the FET body diode during turn off. This allows hard switching of the FETs with low switching losses. The module is designed with over-rated components to provide high reliability and better then 97% efficiency at full load. The modules use a Microchip DSP for control, monitoring, and fault detection. The switching FETS are driven by PWM modules in the DSP at 60 KHz. A Dual CAN bus interface provides for low cost redundant control paths. The DSP will also provide current sharing between modules, synchronized switching, and soft start up for hot swapping. The input and output of each module have low resistance FETs to allow hot swapping and isolation of faulted units.

42 ENGINEERING↗

Next Generation Fast RF Interlock Module and ATCA Adapter for ILC High Availability RF Test Station Demonstration

High availability interlocks and controls are required for the ILC (International Linear Collider) L-Band high power RF stations. A new F3 (Fast Fault Finder) VME module has been developed to process both fast and slow interlocks using FPGA logic to detect the interlock trip excursions. This combination eliminates the need for separate PLC (Programmable Logic Controller) control of slow interlocks. Modules are chained together to accommodate as many inputs as needed. In the next phase of development the F3's will be ported to the new industry standard ATCA (Advanced Telecom Computing Architecture) crate (shelf) via a specially designed VME adapter module with IPMI (Intelligent Platform Management Interface). The goal is to demonstrate auto-failover and hot-swap for future partially redundant systems.

43 PARTICLE ACCELERATORS↗

Verification of an IGBT Fusing Switch for Over-current Protection of the SNS HVCM

An IGBT based over-current protection system has been developed to detect faults and limit the damage caused by faults in high voltage converter modulators. During normal operation, an IGBT enables energy to be transferred from storage capacitors to a H-bridge. When a fault occurs, the over-current protection system detects the fault, limits the fault current and opens the IGBT to isolate the remaining stored energy from the fault. This paper presents an experimental verification of the over-current protection system under applicable conditions.

43 PARTICLE ACCELERATORS↗

A Prognostic Method for Scheduling Maintenance on the P2- Marx Modulator

The SLAC National Accelerator Laboratory is developing a second generation Marx-type modulator for the ILC, the P2-Marx. The modulator is expected to operate reliably in excess of 10{sup 5} hours with minimum downtime. A prognostic system is being implemented with the development of the P2-Marx to monitor and track the health of key high voltage components. This paper discusses the way in which the prognostic system will be implemented and used to monitor the health of the P2-Marx modulator.

43 PARTICLE ACCELERATORS↗

Development Status of The ILC Marx Modulator

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-}0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

43 PARTICLE ACCELERATORS↗

Compact, Intelligent, Digitally Controlled IGBT Gate Drivers for a PEBB-Based ILC Marx Modulator

SLAC National Accelerator Laboratory has built and is currently operating a first generation prototype Marx klystron modulator to meet ILC specifications. Under development is a second generation prototype, aimed at improving overall performance, serviceability, and manufacturability as compared to its predecessor. It is designed around 32 cells, each operating at 3.75 kV and correcting for its own capacitor droop. Due to the uniqueness of this application, high voltage gate drivers needed to be developed for the main 6.5 kV and droop correction 1.7 kV IGBTs. The gate driver provides vital functions such as protection of the IGBT from over-voltage and over-current, detection of gate-emitter open and short circuit conditions, and monitoring of IGBT degradation (based on collector-emitter saturation voltage). Gate drive control, diagnostic processing capabilities, and communication are digitally implemented using an FPGA. This paper details the design of the gate driver circuitry, component selection, and construction layout. In addition, experimental results are included to illustrate the effectiveness of the protection circuit.

43 PARTICLE ACCELERATORS↗

11.424 Ghz Stripline Transversal Filter for Sub-Picosecond Bunch Timing Measurements

Measurement of time-of-arrival or instantaneous longitudinal position is a fundamental beam diagnostic. We present results from a stripline transversal periodic coupler structure which forms the heart of a sub-ps beam timing detector. This filter structure approximates a sinx/x response in the frequency domain which corresponds to a limited pulse length response in the time domain. These techniques have been used extensively in beam feedback systems at 3 GHz center frequencies with operational single-shot resolutions of 200 fs [1]. We present a new design, based on a 11.424 GHz center frequency, which is intended to offer a factor of four improvement in time resolution. Two-dimensional electromagnetic simulation results are shown, and the design optimization approach leading to the final circuit implementation is illustrated. The prototype circuit has been fabricated on 64mil Rogers 4003 and lab frequency domain and time domain data are compared to the 2-D simulation results. Performance of the prototype circuit is shown with applicability to sub-ps beam measurements in LINAC and FEL applications.

43 PARTICLE ACCELERATORS↗

Commissioning of the LHC Low Level RF System Remote Configuration Tools

The LHC Low Level RF system (LLRF) is a complex multi-loop system used to regulate the superconductive cavity gap voltage as well as to reduce the impedance presented by RF stations to the beam. The RF system can have a profound impact on the stability of the beam; a mis-configured RF system has the potential of causing longitudinal instabilities, beam diffusion and beam loss. To configure the RF station for operation, a set of parameters in the LLRF multi-loop system have to be defined. Initial system commissioning as well as ongoing operation requires a consistent method of computer based remote measurement and model-based design of each RF station feedback system. This paper describes the suite of Matlab tools used for configuring the LHC RF system during the start up in Nov2009-Feb2010. We present a brief overview of the tool, examples of commissioning results, and basics of the model-based design algorithms. This work complements our previous presentation, where the algorithms and methodology followed in the tools were described.