Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator design, technology, and operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Collimation Systems for the PSR

This note provides a review of collimator systems being used or considered in high-intensity proton accelerators like SNS, J-PARC, LHC, and PIP-II. These facilities use collimators to remove beam halo, restrict transverse size and momentum in the beam to constrain beam losses around collimators and minimize beam losses downstream, particularly losses arising from particles missing the design location at the stripping foil when injected into the proton storage ring. Collimators are placed either in the transport injection lines (single-pass collimators) or in the rings (multi-pass collimators). Collimators in the transport line are placed around stripping foils in H- accelerators, allowing the beamline optics to get rid of the unstripped protons into well localized absorbers. Rings and proton accelerators mostly rely on tungsten scrapers and collimators in a multi-stage configuration to clean the scattered beam particles mainly responsible for heavy losses at high energies. Placement of the collimators is carefully chosen in terms of the right phase advance to maximize the collimating efficiency, whether the collimation is intended to match an injection stripping foil or a downstream acceptance. Collimation systems are designed with the specific concerns of each facility in mind, although all of them prioritize the minimization of activation due to beam losses to enable hands-on access during maintenance periods. At LANSCE, there are no high-energy collimators, although pairs of horizontal and vertical jaws are routinely used in the LEBT to clean and control the transverse beam profile delivered downstream. This report will help in understanding, together with the beam dynamics simulations, which collimation schemes would be most effective for the PSR upgrade. For example, SNS designed off-momentum collimators to be placed in a 90° arc bend, a high-dispersion region in the beam injection line, very similar to the bend at Line D in LANSCE. This system was very effective at minimizing losses during injection into the SNS accumulator ring and is being re-designed for future operation.

43 PARTICLE ACCELERATORS↗

Development of an accelerator-based neutron source to prototype Mo-99 production, part I: A liquid LBE windowless target

In this article, Molybdenum-99 (Mo-99)’s decay product, technetium-99 (Tc-99 m), is one of the most critical isotopes for medical diagnostics. To provide U.S. domestic supply of Mo-99 without using high-enriched uranium (HEU), a subcritical uranium target assembly (UTA) is irradiated by an accelerator-based neutron source to create Mo-99 through fission. This study discusses the development of the accelerator-based neutron source. The high-energy electrons from the accelerator irradiate a liquid lead-bismuth eutectic (LBE) target to produce neutrons. Part I of this work focuses on numerical and experimental analysis towards the development of a liquid LBE windowless target. Unlike the existing windowless targets in literature, the current design creates a vertical free surface for a beam to irradiate. First, a hydrodynamic analysis of the LBE windowless target is performed. Simplified analytical calculations are assisted by 2D computational fluid dynamics (CFD) simulations to design the target, with the focus on eliminating recirculation zones and avoiding cavitation. With the optimized geometry, the experimental study is performed to investigate the flow hydrodynamics using liquid LBE. The experiments (1) compare pressure drop in the system to correlation predictions; (2) visualize the free surface liquid LBE flow from the beam view; (3) validate the LBE flow profile using temperature sensitive paint from the side view; and (4) validate the liquid LBE film thickness using gamma densitometer measurements. Second, the power handling capability of the designed windowless target is investigated. The divider plate in the current design is susceptible to overheating due to the thin LBE film in front. As LBE erosion and corrosion is likely to occur at an LBE velocity of 2.0 m/s and temperature above 500 °C, a power limit of 10 kW of beam power was established to prevent this corrosion from occurring, which is calculated by a Nusselt number correlation. The divider plate surface temperature at 10 kW agrees well with the 3D CFD simulation results. Part I demonstrates the fundamental physics in liquid LBE windowless target design and associated testing. A companion paper, Part II will demonstrate how to couple this windowless target into the Mo-99 production system, including an accelerator system operating under an ultra-high vacuum and the UTA cooled by water at room temperature.

43 PARTICLE ACCELERATORS↗

Technical Interface Coordination with SHINE (FY2020 Summary)

In FY20, Los Alamos National Laboratory (LANL) performed technical interface coordination with SHINE including coordination of SHINE CFD and thermal hydraulics conference calls, national laboratory conference calls, and program management activities such as reporting and tracking requirements for current FY20 activities. SHINE did not request any general technology consultation support for emergent issues. LANL has participated in the bi-weekly conference calls with SHINE and other national laboratories regarding LANL’s current activities. Activities discussed include the Supo 3-D CFD model geometry validation, releasing the CFD-MCNP coupled codes for the generic solution vessel simulations, and the ANL bubble experiment #2 design, preparation, and collaboration.

07 ISOTOPE AND RADIATION SOURCES↗

Resilient GaN-based Power Module with Improved Diagnostic for Future Accelerator

Los Alamos Neutron Science Center (LANSCE) and Dual-Axis Radiographic Hydrodynamic Test facility (DARHT) play a pivotal role in advancing scientific research and national security initiatives. As a premier facility for neutron science, LANSCE and DARHT provide invaluable insights into fundamental research, materials science, nuclear physics, high-energy physics, material science, and medical imaging. Existing (DC) power supply and pulse modulation technologies used in LANSCE and DARHT face limitations in terms of reliability, maintainability, and diagnostics which hinder the progress of these cutting-edge facilities. By proposing improvements to LANL accelerator facilities’ performance and addressing component failure, we aim to enhance scientific outcomes and minimize disruptions, allowing for more efficient and productive research activities while ensuring the continuity of valuable contributions to the user community. This proposal aims to revolutionize (DC) power supply and pulse power systems for future particle accelerators via the development of a resilient GaN-based power module with improved diagnostic and redundant submodules.

43 PARTICLE ACCELERATORS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Results of the first implementation of RF phase signature matching at LANSCE

The LINAC at the Los Alamos Neutron Science Center (LANSCE) has been utilizing the Delta-t method to match the RF cavities to the design acceleration parameters since its commissioning in 1972. The differences in time-of-flight between two subsequent Beam Position and Phase Monitors (BPPMs) are measured with both accelerated and drifting beams, depending on the whether the module is set to on or off. The algorithm optimizes the module amplitude and phase via iterative measurements if the initial phase is in the vicinity of the design value. With an upgrade to a faster readout system, a scan over the whole RF cavity phase range requires relatively less time than the classical optimization procedure. The Phase Scan Signature Matching (PSSM) method provides a time-efficient method that ensures the phase selection lands on the bunching side and empowers future analyses to build module-specific models. The PSSM also utilizes a direct model to determine the correct amplitude to sub-percent level instead of using linearized matrices. Furthermore, lacking a reliable energy measurement method in the LINAC, we measure the beam phases at two downstream locations to increase the precision of energy measurements. In this letter, we also discuss the sensitivities of PSSM, error propagation, and the implementation results for the 2019 and 2020 beam cycles.

47 OTHER INSTRUMENTATION↗

Window Test Stand Status and Future Work [Slides]

Challenges to getting the window test stand running that were addressed. Initial design of half-anchor connector was insufficient. Accommodation of non-Rexolite windows required engineering.

42 ENGINEERING↗

Niowave Ancillary Systems – FY21: In Partial Fulfillment of the Deliverable Requirement for Niowave Ancillary Systems Support by LANL

Niowave Inc. produces medical radioisotopes within the US. Lead-bismuth eutectic (LBE) is irradiated using an electron beam to produce neutrons that are used in the production of Molybdenum-99 (Mo-99). The medical community relies on a steady supply of Mo-99 which is primarily used in medical diagnostic imaging. The irradiation of LBE results in high temperatures within the molten metal, this work focusses on the design of ancillary systems associated with the liquid metal system. The LBE is initially at a temperature of 200°C and flows over a steel plate to create a waterfall. The electron beam is then aimed at the waterfall to generate neutrons. The peak temperatures of the LBE post irradiation depend on the beam energy of the LINAC. For a 15 MeV and 20 kW beam, the temperatures can range between 300°C and 350°C. The LBE is cycled through the system to create a closed loop that requires the post-irradiation LBE to be cooled back to 200°C. This work focuses on the heat exchanger and condenser system responsible for the cooling of the post-irradiation LBE.

36 MATERIALS SCIENCE↗

Niowave Design and Analysis of a 200 kW Converter

LANL is providing support to Niowave Inc. on the design and analysis of a 200 kW converter. The current design of the 200 kW (40 MeV, 5 mA electron beam) converter consists of LBE flowing from the top to the bottom. When compared to the Mk.5 20 kW converter, which flowed LBE from the bottom, flowing over a divider plate to create a waterfall, the 200 kW converter eliminates the divider plate, which would otherwise have melted with the higher beam power. Because the LBE flows from the top to the bottom, alternate methods to the divider plate need to be utilized to ensure a stable flow that minimizes splashing at the bottom of the LBE waterfall, while maintaining a uniform LBE thickness at the beam, and steady LBE flow at the desired flow rate.

43 PARTICLE ACCELERATORS↗

Experimental Study of Fixed Plate Insert for Window Protection

Evidenced from experiments to date, NorthStar can expect that potentially significant changes in the target cooling passages are likely due to disk shape changes by thermal distortions or breakage. In the bulk of the target the result will be increased He flow in some channels and decreased flow in others.

43 PARTICLE ACCELERATORS↗

Niowave: Flow measurement development - FY2022

It is critical to maintain proper flow rate of lead bismuth eutectic (LBE) for the operation of the Niowave converter. The high temperature of the LBE (> 200 °C) makes it difficult to purchase simple off the shelf flow meters. One method that can be used to measure the flow rate indirectly, is to use a venturi, with a known throat diameter and differential pressure measurement across the throat. LANL designed the venturi and after numerous iterations with vendors, narrowed down a differential pressure transducer to use with the venturi.

43 PARTICLE ACCELERATORS↗