Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ATR REACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Advanced Test Reactor (ATR) Capabilities in Support of Advanced Reactor Development [Slides]

A primary mission of the Advanced Test Reactor (ATR) is to support the next generation of nuclear reactors. This is an overview of ATR irradiation capabilities in support of advanced reactor development. Topics include an overview of the ATR facility and reactor, experiment design overview, thermal and fast spectrum testing, as well as advanced material testing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Four Design Demonstration Elments (DDEs) to be irradiated in the Advanced Test Reactor (ATR) and the Belgian Reactor 2 (BR2)

The U.S. High Performance Research Reactor Conversion fuel qualification team is focused on developing and qualifying plate type uranium-molybdenum (U-Mo) monolithic and uranium silicide (U3Si4) fuel. Several irradiations of mini-plates and full-size plate irradiations will demonstrate the fuel’s behavior. Along with qualifying fuel, larger tests are planned to support licensing fuel elements. These tests are referred to as DDEs. As a result of a scoping study performed in 2018, a decision was made to irradiate two DDEs in ATR at the Idaho National Laboratory (INL) and two other DDEs in BR2 in Belgium. The objective is to demonstrate successful irradiation of each DDE to support the licensing submittal of that specific reactor. Neutronics analysis is being performed to match the power density distribution of the represented elements. Test train hardware design are being done to ensure all the target conditions are being met for the two DDEs to be irradiated.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DEVELOPMENT OF A VERIFICATION BENCHMARK SUITE FOR THE ATR REACTOR PHYSICS UPGRADE

The result of a numerical algorithm is only as good as the effort made toward its verification. Comprehensive computer codes, especially for application to nuclear reactors, require in-depth assessment of the numerical methods used and their computational implementation. This presentation describes a suite of semi-analytical benchmarks for the ATR Reactor Physics Upgrade as part of the ATR Life Extension Project (LEP). Several neutron transport codes including deterministic codes HELIOS, NEWT and probabilistic codes MCNP6, SERPANT and MC21 are upgrade candidates. To properly evaluate code performance capabilities, code verification is an essential element. A credible verification program requires education to guide proper application, training in proper input preparation and output expectation and verification to instill confidence in the coded numerical procedures. The subset of the benchmark suite to be described here is primarily of the 1D transport variety (however, a 2D case does indeed exist) with the intent to provide unquestionably high order accurate semi-analytical numerical solutions to the transport equation. We base the analytical solutions on analytical Fourier series and discrete ordinates representations. Here we present two 1D benchmarks based on Fourier series.

99 GENERAL AND MISCELLANEOUS↗

ADVANCED TEST REACTOR (ATR) CONVERSION TO LOW ENRICHED URANIUM (LEU) FUEL

The United States Department of Energy (DOE), National Nuclear Security Administration (NNSA), Office of Material Management and Minimization (MMM) is working to convert research reactors globally from highly enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. MMM and its predecessor programs have converted or verified the shutdown of 88 HEU research reactors and isotope production facilities, using LEU fuel developed in the 1980s. However, there is a small set of high performance research reactors which require a new high density LEU fuel for conversion, including six U.S. high performance research reactors (USHPRRs), which include the Advanced Test Reactor (ATR) and the ATR Critical (ATRC) Facility at the Idaho National Laboratory (INL) near Idaho Falls, ID; University of Missouri Research Reactor (MURR) at Columbia, MO; Massachusetts Institute of Technology Reactor (MITR) at MIT in Cambridge, MA; High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) near Oak Ridge, TN; and National Bureau of Standards Reactor (NBSR) at the National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) in Gaithersburg, MA. These reactors will share the same uranium-molybdenum (U-Mo) fuel plate design. The U-Mo fuel meat foil will have a zirconium (Zr) diffusion barrier with aluminum cladding. Three different application methods for the Zr diffusion barrier layer are being pursued – co-rolled, electroplating and plasma spraying. Fabrication of the higher density LEU U-Mo fuel has presented several challenges. Because the U-Mo fuel fabrication process uses the existing stockpile of 93% highly enriched uranium (HEU) to be blended with molybdenum and depleted uranium (DU) to form 19.75% LEU, cost benefits of enriching to 19.75% will not be realized. Homogeneity of the U-235 and molybdenum in the metal foil is a challenge due to U-Mo casting process results in variations between adjacent cast U-Mo plates. LEU will not require less U-235 as previously believed due to self-shielding properties of U-238 requiring additional U-235 to be loaded in each fuel element. Although the overall dimensions of the ATR fuel element remain unchanged, the weight of the LEU ATR fuel element is 72% greater than a HEU ATR fuel element. During waste recovery and recycling efforts, separation of aluminum cladding from the HEU fuel meat is a relatively simple chemical dissolution, however, separation of the Zr diffusion barrier from the U-Mo fuel meat is significantly more challenging.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring. Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014, with minor Modification 1 effective March 7, 2017. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

99 GENERAL AND MISCELLANEOUS↗

Advanced Test Reactor (ATR)

Training slide deck covering the basics of the advanced test reactor, as well as the basic scientific theory behind its operation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Restructuring and Optimizing Reactor Building Lifting Processes & Designing a Solution for an Overhead Door Handling Forklift Attachment

This poster presents two innovative projects aimed at enhancing operational efficiency and safety at the Advanced Test Reactor (ATR) Complex. The first project focuses on restructuring the existing lift book used for hoisting operations within the ATR Reactor Building. The current lift book, a cumbersome 150+ page document, is being transformed into a more efficient format using charts that allow for quick identification of maximum lift heights based on object footprint and weight. This new method also considers various parameters such as floor integrity and reactor status, dividing entries into four distinct charts to improve usability and safety during lifts. The second project involves designing a specialized forklift attachment for handling an overhead door at the ATR Reactor Building. The attachment is engineered to securely lift and lower a 1200lb, 14ft long door, ensuring safe replacement operations. The design process included research on forklift attachment codes, modeling in Autodesk Inventor, and testing through Finite Element Analysis (FEA) and hand calculations to confirm the attachment's structural integrity. Future work includes completing detailed drawings and an Engineering Calculations Analysis and Review (ECAR) document to proceed with manufacturing and assembly. Together, these projects demonstrate a commitment to optimizing reactor building operations through innovative engineering solutions and safety considerations.

42 - ENGINEERING↗

AGC-2 Specimen Position Adjustment

This engineering calculations and analysis report (ECAR) calculates the Advanced Graphite Creep (AGC)-2 specimen position adjustments that result from (1) as-built dimension corrections of the Advanced Test Reactor (ATR) reactor, experiment, and specimens, (2) thermal growth of the capsule wall and graphite components, and (3) variable specimen elevations as the specimen stacks shrink due to radiation -induced shrinkage and axial load- induced creep. The specimen elevations listed in the experiment assembly documents do not accurately represent the actual specimen positions in relation to the reactor core mid-plane. Prior experiment insertion difficulties have shown that the distance from the reactor top head closure plate to the core is greater than the nominal elevations shown on the ATR facility drawings. Drawing 600001 lists the measured difference between the closure plate and the gearbox support beam as 0.313 in.ches greater than the facility drawings. Thus, the height of the specimens in relation to the core mid-plane is 0.313 in.ches higher than the nominal dimensions. AlsoIn addition, the overall dimension of the experiment is 0.084 in. shorter than the nominal drawing dimension on Drawing 601266 [1]. As a further adjustment, the average weld shrinkage of the three capsule welds is 0.035 each, which affects the as-built position of the lower isolation weld plate (i.e., Part #601266-9) onto which all graphite components are stacked. In addition to the as-built adjustments mentioned above, the specimens also are subject to a stack up error, which is due to their the thickness difference from nominal. This effect is most apparent in the center S-7 stack which that has a large number of specimens (i.e., 170 specimens). Per post-irradiation examination (PIE) measurements, the average S-7 specimen is about 0.0008 in. smaller than nominal. Even though this difference is small, when multiplied by the number specimens, the top specimen experiences an elevation reduction of 0.14 inches. Although dimensional changes were less pronounced in S-1 through S-6, specimen elevations were adjusted based on pre-irradiation length measurements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radiation Effects Related to Repaired BWR Core Shrouds

The material properties of the core shroud and supporting tie rod components are important factors for Boiling Water Reactor (BWR) life extension considerations. Given the variability of nickel and boron content found in 304 stainless steel shroud plates, and XM-19 and Inconel X-750 tie rod materials, this paper combines the latest spectral information in the vicinity of the core shroud to calculate hydrogen and helium gas production limits as well as atomic displacement damage spanning 80 full-power years (FPY) using the SPECTER code. Results indicate that, whereas boron has little effect on the atomic displacement damage, helium production from boron can be important and must be included in weldability assessments. Since the boron concentration is uncertain, helium generation is calculated assuming a composition range based on specifications and reported measurements. The results show that helium production caused by transmutations in the 304 SS shroud material are dominated by the concentration of boron and will have a significant impact on weldability after only a few years of service. For tie rods, the susceptibility to irradiation-assisted stress corrosion cracking (IASCC) has been assessed by determining helium production in Inconel X-750 IASCC specimens irradiated in the Advanced Test Reactor (ATR) reactor and correlating with the helium produced in a BWR. As a tie rod material in a high thermal neutron flux environment, Inconel X-750 is more likely to be IASCC sensitive during service in a BWR due to helium than the XM-19 stainless steel alloy because of a greater nickel content and boron concentration. Weldability of the core shroud plate material, IASCC of the tie rod materials, and the gamma photon contribution to radiation damage are discussed.

radiation damage in materials, BWR↗

Evaluation of Erosion of the Dummy “EE” Plate 19 in YA Type ATR Fuel Element During Reactor PALM Cycles

Advanced Test Reactor (ATR) Cycle 153B-1 was a 14-day, high-power, powered axial locator mechanism (PALM) operating cycle that completed on April 12, 2013. Cycle 153B-1 was a typical operating cycle for the ATR, and did not result in any unusual plant transients. ATR was started up and shut down as scheduled. The PALM drive physically moves the selected experiments into and out of the core to simulate reactor startup and heat up, and shutdown and cooldown transients, while the reactor remains in steady-state conditions. However, after the cycle was over, when the fuel elements were removed from the core and inspected, several thousand flow-assisted erosion pits and “horseshoeing” defects were readily observed on the surface of the several YA-type fuel elements (these are aluminum “dummy” plates that contain no fuel). In order to understand these erosion phenomena, a thermal-hydraulic model of coolant channel 20 on a YA-M fuel element was generated. The boundaries of the model were the aluminum EE plate of a YA-M fuel element and a beryllium reflector block with 13 horizontal saw cuts which represented regions of zero flow. The heat generated in fuel plates 1 through 18 was modeled to be passing through the aluminum EE plate. The coolant channel 20 width was set at 0.058 in. (58 mils). It was established that the horizontal saw cuts had a significant effect on the temperature of the coolant. The flow, which was expected to vary linearly with gradual heating of the coolant as it passed through the channel, was extremely turbulent. The temperature rise, which was expected to be a smooth “S” curve, was represented by a series temperature rise “humps,” which occurred at each horizontal saw cut in the beryllium reflector block. Each of the 13 saw cuts had a chamfered edge which resulted in the coolant flow being re-directed as a jet across the coolant channel into the surface of the EE plate, which explained the temperature rise and the observed scalloping and pitting degradation on the YA-M fuel elements. In the case of scalloping (horseshoeing) a surprising similarity of that defect to those appearing on aluminum plate rolled in over-lubrication conditions, were established. In turn, this made us think that the principal feature responsible for the appearance of these defects, was horizontal cuts in the beryllium reflector block created to arrest the propagation of large vertical crack(s) in Be in PALM cycles with higher overall fluence. This assumption was fully confirmed by the results of thermo-hydraulic simulations. The neutronics data for these modeling experiments were provided using advanced irradiation simulations (MCNP, HELIOS). In the case of pitting erosion the following corrective measures were proposed based upon the results of JMatPro v.8.2 modeling (TTT- and CCT-diagrams): change the fabrication process by adding blister anneal before program anneal, immediately after cold rolling of AA6061plate. This step will allow achieving complete recrystallization, eliminating of strengthening due to metastable precipitates, and reduce the possibility of forming sharp microstructural features upon the surface.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AGR-1 Irradiation Test Final As-Run Report, Rev. 3

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39 x 10 25 n/m 2 (E >0.18 MeV). We’ll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10 -7 with only one capsule significantly exceeding this value. A maximum R/B of around 2 x 10 -7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

After Action Report: Advanced Test Reactor Complex 2015 Evaluated Drill October 6, 2015

The Advanced Test Reactor (ATR) Complex, operated by Battelle Energy Alliance, LLC, at the Idaho National Laboratory (INL) conducted an evaluated drill on October 6, 2015, to allow the ATR Complex emergency response organization (ERO) to demonstrate the ability to respond to and mitigate an emergency by implementing the requirements of DOE O 151.1C, “Comprehensive Emergency Management System.”

99 GENERAL AND MISCELLANEOUS↗

Nuclear Requalification of the ATR Core

The Advanced Test Reactor (ATR) creates a unique, high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector. The reflector is eventually required to be replaced during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data, notably 1977-1994 CIC data, to conduct predictive criticality analysis on the new, unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult, and in some cases impossible, to utilize. These inconsistencies arise in various forms of not using correct units, inconsistent diagram usage, and not portraying the same kind of data similarly across the reports. To work around this inconsistency issue, Reactor Engineering is implementing the use of several new neutronic modeling codes that utilize modern computation speeds and methods to model the new core in different criticality environments. Further validation is then conducted by nuclear testing and bringing the reactor critical and conducting various irradiation tests. Upon completion and certification that the reactor passed all testing requirements, ATR can once again re-start normal operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Depletion benchmark for a high-assay low-enriched uranium fuel experiment in the advanced test reactor

Reactor physics depletion benchmarks for high-assay low-enriched uranium (HALEU) fuel are limited in number. In particular, there is limited data for HALEU benchmarks for U-10Mo (uranium-10% molybdenum) plate fuel that is being developed for use in the United States’ high performance research reactors including the Advanced Test Reactor (ATR), Advanced Test Reactor Critical Facility (ATR-C), High Flux Isotope Reactor (HFIR), Massachusetts Institute of Technology Reactor (MITR), University of Missouri Research Reactor (MURR), National Bureau of Standards Reactor (NBSR). These six reactors currently operate with highly enriched uranium dispersed fuel in an aluminum matrix. In support of conversion to a HALEU fuel, qualification of U-10Mo formed into a monolithic foil is being performed. Fuel qualification involves irradiating fuel specimens in the ATR. The irradiation tests provide an opportunity to benchmark depletion capabilities of reactor physics codes in support of the ATR operation, as well as develop benchmarks that can be used by other institutions to benchmark other reactor physics codes. This paper documents the development of a benchmark model of the irradiation of the ATR Full-size plate In center flux trap Position 7 (AFIP-7) experiment using the depletion codes MC21 and Advanced Dimensional Depletion for Engineering of Reactors (ADDER).

Nielsen, Joseph W. [Idaho National Laboratory (INL↗

Depletion Benchmark of the AFIP-7 Experiment in the Advanced Test Reactor

Reactor physics depletion benchmarks for low-enriched uranium fuel are limited in number. In particular, there is very limited data for LEU benchmarks for U-10Mo (Uranium-10% Molybdenum) plate fuel developed for use in U.S. high-performance research reactors (USHPRR). USHPRR includes the Advanced Test Reactor (ATR), Advanced Test Reactor Critical Facility (ATR-C), High Flux Isotope Reactor (HFIR), University of Missouri Research Reactor (MURR), Massachusetts Institute of Technology Reactor (MITR), and National Bureau of Standards Reactor (NBSR) at the National Institute of Science and Technology. These reactors are fueled with high-enriched uranium dispersed fuel in a silicon/aluminum matrix. In support of conversion to a HALEU fuel, qualification of U-10Mo formed into a monolithic foil is being performed. Fuel qualification involves irradiated fueled specimens in the ATR. The irradiation tests provide an opportunity to benchmark depletion capabilities of reactor physics codes in support of the ATR operation, as well as develop benchmarks that can be used by other institutions to benchmark other reactor physics codes. This report documents the development of a benchmark model of the irradiation of the ATR Full -size plate In center flux trap Position 7 (AFIP-7) experiment.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Requalification of the New ATR Core

The Advanced Test Reactor (ATR) creates a unique high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector eventually requiring a replacement during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data to model and predict criticality scenarios for the new unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult to find data trends that could be useful for the modeling and prediction process. So nuclear requalification testing is conducted using different flux and irradiation tests to accurately verify the models and to recalibrate nuclear monitoring instrumentation in the ATR core allowing for safe re-start of normal operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Predicting Safety Rod Reactivity Insertion in the Advanced Test Reactor

The Advanced Test Reactor (ATR), and complimentary zero-power ATR Critical (ATRC) reactor, located at Idaho National Labs (INL), are undergoing conversion from Highly Enriched Uranium (HEU) to Low Enriched Uranium (LEU). Both have a variety of testing locations that can receive large variations in flux due to its unique serpentine design, consisting of five lobes surrounding nine flux traps (see Figure 1). Initial criticality and power distribution throughout the core are controlled by core-external outer shim control cylinders (OSCCs). Distinct test loops allow for testing at specific temperatures, pressures, and irradiation conditions such as flux and fission density. The ATR is one of the key nuclear engineering research and testing facilities within the DOE National Laboratory Complex, and the ATRC supports its operation [1]. Currently, the Office of Material Management and Minimization (M3) within the National Nuclear Security Administration of the DOE is working to convert the remaining research reactors, including the ATR, from 93% HEU fuel to 19.75% LEU fuel (LEU) to support non-proliferation [2]. Extensive materials testing at INL and internationally has demonstrated that a high-density uranium molybdenum (U 10Mo) alloy can meet the performance requirements of the remaining high powered research reactors. The current LEU fuel element design is named the LOWE element. However, there are many technical challenges to address before the conversion to LEU can be successful, including the accurate characterization of the reactor core physics with LEU fuel. To ensure safe operation of the ATR, reactor engineers prepare a CSAP (Core Safety Assurance Package) before each cycle. The purpose of the CSAP is to verify the reactor performance calculation used to determine if the selected fuel loading meets operational, experimental, and safety criteria. Many of the criteria in the CSAP are limits on reactivity insertion in various accident scenarios.

42 ENGINEERING↗