Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ARC CHAMBER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Experimental studies of the arc chamber short circuit failure mechanism on the DIII-D neutral beam system

Here we report on efforts to improve performance and longevity of the Neutral Beam Injection (NBI) system by initiating a R&D program aimed at studying the most common failure mechanism for the ion sources. To this end a filament driven plasma chamber has been constructed with plasma parameters similar to the arc chamber of NBI ion sources. A preliminary report of an investigation into the most common failure is presented here: The failure mechanism observed during helium operations on DIII-D is the result of electrical breakdown of the insulation material that separates the filament plates from the anode. The fault is reproduced in a table top experiment analogous to the DIII-D NBI ion source in key parameters and proposals for amelioration of the issue are discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterization of Boron Contamination in Fluorine Implantation using Boron Trifluoride as a Source Material

Fluorine implantation process purity was considered on different types of high current implanters. It was found that implanters equipped with an indirectly heated cathode ion source show an enhanced deep boron contamination compared to a high current implanter using a cold RF-driven multicusp ion source when boron trifluoride is used for fluorine implantations. This contamination is directly related to the source technology and thus, should be considered potentially for any implanter design using hot cathode/hot filament ion source, independently of the manufacturer.The boron contamination results from the generation of double charged boron ions in the arc chamber and the subsequent charge exchange reaction to single charged boron ions taking place between the arc chamber and the extraction electrode. The generation of the double charged boron ions depends mostly on the source parameters, whereas the pressure in the region between the arc chamber and the extraction electrode is mostly responsible for the charge exchange from double charged to single charged ions. The apparent mass covers a wide range, starting at mass 11. A portion of boron ions with energies of (19/11) times higher than fluorine energy has the same magnetic rigidity as fluorine beam and cannot be separated by the analyzer magnet. The earlier described charge exchange effects between the extraction electrode and the entrance to the analyzer magnet, however, generates boron beam with a higher magnetic rigidity compared to fluorine beam and cannot cause boron contamination after mass-separation.The energetic boron contamination was studied as a function of the ion source parameters, such as gas flow, arc voltage, and source magnet settings, as well as analyzing magnet aperture resolution. This allows process optimization reducing boron contamination to the level acceptable for device performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Numerical study of turbulence-influence mechanism on arc characteristics in an air direct current circuit breaker

This paper focuses on the numerical investigation of arc characteristics in an air direct current circuit breaker (air DCCB). Using magneto-hydrodynamics (MHD) theory, 3D laminar model and turbulence model are constructed and calculated. The standard k-epsilon model is utilized to consider the turbulence effect in the arc chamber of the DCCB. Several important phenomena are found: the arc column in the turbulence-model case is more extensive, moves much more slowly than the counterpart in the laminar-model case, and shows stagnation at the entrance of the chamber, unlike in the laminar-model case. Moreover, the arc voltage in the turbulence-model case is much lower than in the laminar-model case. However, the results in the turbulence-model case show a much better agreement with the results of the breaking experiments under DC condition than in the laminar-model case, which is contradictory to the previous conclusions from the arc researches of both the low-voltage circuit breaker and the sulfur hexafluoride (SF6) nozzle. First, in the previous air-arc research of the low-voltage circuit breaker, it is assumed that the air plasma inside the chamber is in the state of laminar, and the laminar-model application gives quite satisfactory results compared with the experiments, while in this paper, the laminar-model application works badly. Second, the turbulence-model application in the arc research of the SF6-nozzle performs much better and gives higher arc voltage than the laminar-model application does, whereas in this paper, the turbulence-model application predicts lower arc voltage than the laminar-model application does. Based on the analysis of simulation results in detail, the mechanism of the above phenomena is revealed. The transport coefficients are strongly changed by turbulence, which will enhance the arc diffusion and make the arc volume much larger. Consequently, the arc appearance and the distribution of Lorentz force in the turbulence-model case substantially differ from the arc appearance and the distribution of Lorentz force in the laminar-model case. Thus, the moving process of the arc in the turbulence-model case is slowed down and slower than in the laminar-model case. Moreover, the more extensive arc column in the turbulence-model case reduces the total arc resistance, which results in a lower arc voltage, more consistent with the experimental results than the arc voltage in the laminar-model case. Therefore, the air plasma inside this air DCCB is believed to be in the turbulence state, and the turbulence model is more suitable than the laminar model for the arc simulation of this kind of air DCCB.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Long-pulse production of high current negative ion beam by using actively temperature controlled plasma grid for JT-60SA negative ion source

The temperature control system of the large-size plasma grid has been developed to realize the long pulse production of high-current negative ions for JT-60SA. By using this prototype system for the JT-60SA ion source, 15 A negative ions has been sustained for 100 s for the first time, which is three times longer than that obtained in JT-60U. In this system, a high-temperature fluorinated fluid with a high boiling point of 270 degree Celsius is circulated in the cooling channels of the plasma grids (PG) where a cesium (Cs) coverage is formed to enhance the negative ion production. Because the PG temperature control had been applied to only 10% of the extraction area previously, the prototype PG with the full extraction area (110 cm × 45 cm) was developed to increase the negative ion current in this time. In the preliminary results of long pulse productions of high-current negative ions at a Cs conditioning phase, the negative ion production was gradually degraded in the last half of 100 s pulse where the temperature of an arc chamber wall was not saturated. From the spectroscopic measurements, it was found that the Cs flux released from the wall might affect to the negative ion production, which implied the wall temperature should be kept low to control the Cs flux to the PG for the long-pulse high-current production. The obtained results of long-pulse production and the PG temperature control method contributes the design of the ITER ion source.

43 PARTICLE ACCELERATORS↗

Negative hydrogen ion beam extraction from an AC heated cathode driven Bernas-type ion source

A plasma grid structure was installed to a Bernas-type ion source used for ion implantation equipment. A negative hydrogen (H{sup −}) ion beam was extracted by an AC driven ion source by adjusting the bias to the plasma grid. The extracted electron current was reduced by positively biasing the plasma grid, while an optimum plasma grid bias voltage for negative ion beam extraction was found to be positive 3 V with respect to the arc chamber. Source operations with AC cathode heating show extraction characteristics almost identical to that with DC cathode heating, except a minute increase in H{sup −} current at higher frequency of cathode heating current.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Performance of positive ion based high power ion source of EAST neutral beam injector

The positive ion based source with a hot cathode based arc chamber and a tetrode accelerator was employed for a neutral beam injector on the experimental advanced superconducting tokamak (EAST). Four ion sources were developed and each ion source has produced 4 MW @ 80 keV hydrogen beam on the test bed. 100 s long pulse operation with modulated beam has also been tested on the test bed. The accelerator was upgraded from circular shaped to diamond shaped in the latest two ion sources. In the latest campaign of EAST experiment, four ion sources injected more than 4 MW deuterium beam with beam energy of 60 keV into EAST.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Impedance optimization for EIC

This report provides a summary of the longitudinal impedance optimization performed to date for the following vacuum components: pump slots, transition from the octagonal shape of the arc chambers to the circular shape of the straight section chambers and the main detector chamber. The cut off frequency for E 01 –mode has been estimated for different cross sections of the vacuum chambers. The advantages of using bunch lengthening to decrease the loss factor and reduce the heating effects for the vacuum components is also examined.

43 PARTICLE ACCELERATORS↗

SU-E-P-35: Real-Time Patient Transit Dose Verification of Volumetric Modulated Arc Radiotherapy by a 2D Ionization Chamber Array

Purpose: To explore the real-time dose verification method in volumetric modulated arc radiotherapy (VMAT) with a 2D array ion chamber array. Methods: The 2D ion chamber array was fixed on the panel of electronic portal imaging device (EPID). Source-detector distance (SDD)was 140cm. 8mm RW3 solid water was added to the detector panel to achieve maximum readings.The patient plans for esophageal, prostate and liver cancers were selected to deliver on the cylindrical Cheese phantom 5 times in order to validate the reproducibility of doses. Real-time patient transit dose measurements were performed at each fraction. Dose distributions wereevaluated using gamma index criteria of 3mm DTA and 3% dose difference referred to the firsttime Result. Results: The gamma index pass rate in the Cheese phantom were about 98%; The gamma index pass rate for esophageal, liver and prostate cancer patient were about 92%,94%, and 92%, respectively; Gamma pass rate for all single fraction were more than 90%. Conclusion: The 2D array is capable of monitoring the real time transit doses during VMAT delivery. It is helpful to improve the treatment accuracy.

60 APPLIED LIFE SCIENCES↗

SU-E-T-337: Dosimetric Study of TMI Using Helical Tomotherapy

Purpose: The purpose of this study is to evaluate the dosimtry of TMI using Helical Tomotherapy (HT). Methods: Whole body CT data sets of 4 patients (median age : range:12–37 years) with 5mm slice thickness were used for planning in HT (TPS version 4.2.3). The contouring of the target and organ at risks (OAR) were delineated ( Oncentra Master Plan v 4.1). Two plans were generated using 5cm and 2.5 cm field widths.The modulation factor and pitch was 3 and 0.3 respectively. Dose to PTV, OARs and the dose homogeneity were evaluated. The doses obtained were compared with the existimg literature. Dose delivery verification was carried out by point dose and 2D array measurements with ion chamber and Arc check dosimetry (Sun NuclearTM) system repectively. The prescribed dose was 14.4 Gy in 8 fractions. Results: The mean PTV volume was 7341.28cc (sd=2353) The dose homogeneity index of PTV was 12.03(sd=2.98) for 2.5cm-FW and 14.61 (sd=1.33) for 5cm-FW.The conformation number for 2.5 and 5 cm plans are 0.6328(sd=0.09) and 0.5915 (sd=0.0376) respectively. The mean dose(Gy) to the OARs were as follows for 2.5cm-FW : eyes, lens, lungs, kidneys, heart, liver,thyroid and testes for are 4.12,1.9,6.61,4.04,4.85,6.06,7.17 and 1.27. The mean dose(Gy) to the OARs were as follows for 5cm-FW :eyes, lens, lungs, kidneys, heart, liver,thyroid and testes for are 4.45,3.14,6.79,4.02,5.01,6.01,10.8 and 1.33. The mean variation of the point dose as compared to the expected dose was within 2% and the gamma analysis was at 91%. Conclusion: It was concluded that 5cm field width plans produces optimal dose volume parameters with deliverable treatment time. From this initial dissymmetric study, it was concluded that the treatment planning and the dose delivery verification was feasible considering the complexity of the TMI.

60 APPLIED LIFE SCIENCES↗

Update on NREL Outdoor Exposure Campaign of Solar Mirrors

Beginning in 2018, the National Renewable Energy Laboratory restarted exposure campaigns on new and archived samples as part of a multiyear project, some with outdoor exposure for more than a decade. By resuming exposure and collecting and analyzing data on thousands of samples going back decades, several goals can be advanced that can be difficult to determine within the timeline of most projects: 1) correlating an accelerated exposure campaign to outdoor aging, specifically with xenon arc lamp exposure chambers; 2) drawing conclusions between specific corrosion mechanisms and weather patterns; and 3) finding novel relationships between mirror composition and performance. In addition to building and mining a database, we will experiment with new characterization techniques, primarily focused on macroscopic and microscopic imaging. In introducing these techniques more broadly, it may be possible to reveal a more direct line between optical performance and exposure campaigns by better understanding the degradation mechanisms occurring.

characterization techniques↗

Effect of TE Mode Power on the PEP II LER BPM System

The beam chamber of the PEP-II B-Factory Low Energy Ring (LER) arc sections is connected to an antechamber for the absorption of synchrotron radiation on discrete photon stops. The presence of the antechamber substantially reduces the cutoff frequency of the vacuum chamber and, in particular, allows the propagation of higher-order-mode (HOM) TE power generated by beamline components at the BPM signal processing frequency. Calculations of the transmission properties of the TE mode in different sections of the vacuum chamber show that the power is trapped between widely separated bellows in the arc sections. Because of the narrow signal bandwidth and weak coupling of the TE mode to the BPM buttons, the noise contributed by the HOM TE power will not produce a noticeable effect on the BPM position signal voltage. The LER arc vacuum chamber employs an antechamber with a discrete photon stop for absorption of synchrotron radiation and with pumps for maintaining pressure below 10 nTorr [1]. The horizontal dimensions of the antechambers at the pumping chamber section and the magnet chamber section are larger or comparable to that of the beam chamber. Because of the increase in the horizontal dimension, the cutoff frequency of the TE10-like mode (in rectangular coordinates) of the vacuum chamber is considerably reduced and, in particular, is less than the BPM signal processing frequency at 952 MHz. TE power propagating in the vacuum chamber will penetrate through the BPM buttons and will affect the pickup signal if its magnitude is not properly controlled. It is the purpose of this note to clarify various issues pertaining to this problem. TE power is generated when the beam passes a noncylindrically symmetric beamline component such as the RF cavity, the injection region, the IR crotch and the IP region. The beampipes connected to these components have TE cutoff frequencies greater than 952 MHz (for example, the TE cutoff frequency of the RF cavity beampipe is 1.8 GHz), and hence no TE power at this frequency propagates from the component. TE power can also be generated by the scattering of TM power through these beamline components. Since the cutoff frequency of the TM mode is in general higher than that of the TE mode, this mechanism is not pertinent to the problem related to the BPM signal. Consequently, the TE power that needs to be considered is mainly generated by components of the LER arc vacuum chamber, where the TE cutoff frequency is less than the BPM processing frequency.

43 PARTICLE ACCELERATORS↗

A BEAM SCREEN TO PREPARE THE RHIC VACUUM CHAMBER FOR EIC HADRON BEAMS: CONCEPTUAL DESIGN AND REQUIREMENTS

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will use the existing Relativistic Heavy Ion Collider storage rings, including the superconducting magnet arcs [1]. The vacuum chambers in the superconducting magnets and the cold mass interconnects were not designed for EIC beams and so must be updated to reduce resistive-wall heating and to suppress e-clouds. To do so without compromising the EIC luminosity goal, a stainless steel beam screen with colaminated copper and a thin layer of amorphous carbon will be installed. This paper describes the main requirements that our solution for the hadron ring vacuum chamber needs to satisfy, including impedance, aperture limitations, vacuum, thermal and structural stability, mechanical design, installation and operation. The conceptual design of the beam screen currently under development is introduced.

43 PARTICLE ACCELERATORS↗

Modular hybrid plasma reactor and related systems and methods

A device, method and system for generating a plasma is disclosed wherein an electrical arc is established and the movement of the electrical arc is selectively controlled. In one example, modular units are coupled to one another to collectively define a chamber. Each modular unit may include an electrode and a cathode spaced apart and configured to generate an arc therebetween. A device, such as a magnetic or electromagnetic device, may be used to selectively control the movement of the arc about a longitudinal axis of the chamber. The arcs of individual modules may be individually controlled so as to exhibit similar or dissimilar motions about the longitudinal axis of the chamber. In another embodiment, an inlet structure may be used to selectively define the flow path of matter introduced into the chamber such that it travels in a substantially circular or helical path within the chamber.

36 MATERIALS SCIENCE↗

Final Design And Manufacturing of the PEP II High Energy Ring Arc Bellows Module

A novel RF shield bellows module developed at SLAC has been successfully manufactured and installed in the PEP-II High Energy Ring (HER). Tests indicate that the module meets its performance and operational requirements. The primary function of the bellows module is to allow for thermal expansion of the chambers and for lateral, longitudinal and angular offsets due to tolerances and alignment, while providing RF continuity between adjoining chambers. An update on the Arc bellows module for the PEP-II High Energy Ring is presented. Final design, manufacturing issues, material and coating selection, and tribological and RF testing are discussed. Performance and operational requirements are also reviewed. The RF shield design has been proven during assembly to allow for large manufacturing tolerances without reducing the mechanical spring force below required values. In addition, the RF shield maintains electrical contact even with large misalignments across the module.

43 PARTICLE ACCELERATORS↗

Report on High-Contrast Advanced Radiographic Capability Review

The Advanced Radiographic Capability (ARC) project at the National Ignition Facility (NIF) is designed to generate picosecond duration, kilo-Joule laser pulses to produce xrays for backlighting NIF experiments. The baseline concept (Figure 1), utilizing a single NIF beam quad, diverts the beamline(s) using insertable pick-off mirrors to a compressor chamber in the target bay and focuses it to target chamber center. When fully implemented, ARC will use a quad of NIF beamlines to deliver eight Petawatt-class, high-intensity pulses in a split aperture configuration (2 short pulse apertures per NIF beamline). These short pulses will be adjustable in energy (up to 13.2 kJ in full implementation), delays (0-80 ns) and pulse durations (1-50 ps) and can be individually pointed to targets. ARC will enable dynamic, multi-frame x-ray imaging (radiography) on NIF for applications in laser driven fusion and other high-energy density science missions. The near-term missions in support of the SSP program are described below.

42 ENGINEERING↗

Time-resolved dosimetry using a pinpoint ionization chamber as quality assurance for IMRT and VMAT

Purpose: To develop a method to verify the dose delivery in relation to the individual control points of intensity modulated radiotherapy (IMRT) and volumetric modulated arc therapy (VMAT) using an ionization chamber. In addition to more effective problem solving during patient-specific quality assurance (QA), the aim is to eventually map out the limitations in the treatment chain and enable a targeted improvement of the treatment technique in an efficient way. Methods: Pretreatment verification was carried out for 255 treatment plans that included a broad range of treatment indications in two departments using the equipment of different vendors. In-house developed software was used to enable calculation of the dose delivery for the individual beamlets in the treatment planning system (TPS), for data acquisition, and for analysis of the data. The observed deviations were related to various delivery and measurement parameters such as gantry angle, field size, and the position of the detector with respect to the field edge to distinguish between error sources. Results: The average deviation of the integral fraction dose during pretreatment verification of the planning target volume dose was −2.1% ± 2.2% (1 SD), −1.7% ± 1.7% (1 SD), and 0.0% ± 1.3% (1 SD) for IMRT at the Radboud University Medical Center (RUMC), VMAT (RUMC), and VMAT at the Wellington Blood and Cancer Centre, respectively. Verification of the dose to organs at risk gave very similar results but was generally subject to a larger measurement uncertainty due to the position of the detector at a high dose gradient. The observed deviations could be related to limitations of the TPS beam models, attenuation of the treatment couch, as well as measurement errors. The apparent systematic error of about −2% in the average deviation of the integral fraction dose in the RUMC results could be explained by the limitations of the TPS beam model in the calculation of the beam penumbra. Conclusions: This study showed that time-resolved dosimetry using an ionization chamber is feasible and can be largely automated which limits the required additional time compared to integrated dose measurements. It provides a unique QA method which enables identification and quantification of the contribution of various error sources during IMRT and VMAT delivery.

60 APPLIED LIFE SCIENCES↗