Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AGREEMENTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Agreement Execution Process Study: CRADAs and NF-WFO Agreements and the Speed of Business

This report summarizes the findings of a study on the execution of Cooperative Research and Development Agreements (CRADAs) and Non-Federal Work for Others (NF-WFO) agreements across the U.S. Department of Energy (DOE) laboratory complex. The study provides quantitiative estimates of times required to negotiate and execute these agreements across the DOE complex. It identifies factors impacting on cycle times and describes best practicies used at various laboratories and site offices that reduce cycle times.

99 GENERAL AND MISCELLANEOUS↗

Flexible Financial Credit Agreements: NREL Low- and Moderate-Income Solar Flexible Financing Credit Agreement Rubric

Flexible Financial Credit Agreements is a broad term used to describe a suite of solar products with innovative features not currently offered in traditional solar financing programs. The NREL Low- and Moderate-Income Solar Flexible Financing Credit Agreement Rubric brief document is designed to help evaluate innovative strategies for increasing the accessibility of solar and increasing adoption among LMI households. The rubric is modeled after a version developed to support plug-in electric vehicle policy adoption (NASEO and Cadmus).

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Quantifying the agreement between observed and simulated extratropical modes of interannual variability

Using historical simulations of the Coupled Model Intercomparison Project-5 (CMIP5) and multiple observationally-based datasets, we employ skill metrics to analyze the fidelity of the simulated Northern Annular Mode, the North Atlantic Oscillation, the Pacific North America pattern, the Southern Annular Mode, the Pacific Decadal Oscillation, the North Pacific Oscillation, and the North Pacific Gyre Oscillation. We assess the benefits of a unified approach to evaluate these modes of variability, which we call the common basis function (CBF) approach, based on projecting model anomalies onto observed empirical orthogonal functions (EOFs). The CBF approach circumvents issues with conventional EOF analysis, eliminating, for example, corrections of arbitrarily assigned, but inconsistent, signs of the EOF’s/PC’s being compared. It also avoids the problem that sometimes the first observed EOF is more similar to a higher order model EOF, particularly if the simulated EOFs are not well separated. Compared to conventional EOF analysis of models, the CBF approach indicates that models compare significantly better with observations in terms of pattern correlation and root-mean-squared-error (RMSE) than heretofore suggested. In many cases, models are doing a credible job at capturing the observationally-based estimates of patterns; however, errors in simulated amplitudes can be large and more egregious than pattern errors. In the context of the broad distribution of errors in the CMIP5 ensemble, sensitivity tests demonstrate that our results are relatively insensitive to methodological considerations (CBF vs. conventional approach), observational uncertainties in pattern (as determined by using multiple datasets), and internal variability (when multiple realizations from the same model are compared). The skill metrics proposed in this study can provide a useful summary of the ability of models to reproduce the observed EOF patterns and amplitudes. Additionally, the skill metrics can be used as a tool to objectively highlight where potential model improvements might be made. Finally, we advocate more systematic and objective testing of simulated extratropical variability, especially during the non-dominant seasons of each mode, when many models are performing relatively poorly.

58 GEOSCIENCES↗

Amendment to Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on History Preservation Concerning Management of the Historic Properties of Los Alamos National Laboratory, Los Alamos, New Mexico (AGREEMENT)

The Field Office has a cultural resources program manager. The LANL Management and Operating Contractor has a staff of cultural resource specialists who meet the qualifications set forth in the Secretary of the Interior's Standards and Guidelines for Professional Qualifications (36 CFR Part 61), or work under the supervision of individuals who meet these qualifications. Any future Management and Operating Contractor will have a staff of Secretary of the Interior-qualified cultural resource specialists.

99 GENERAL AND MISCELLANEOUS↗

Space Act Agreement Maker (SAAM) With Electronic Routing System (ERouter) Developed

Members of the Commercial Technology Office at the NASA Glenn Research Center have developed an exciting new tool that greatly reduces the lead time in creating and routing Space Act Agreements. The Space Act Agreement Maker (SAAM) is an e-government Web-based system that automates the initial drafting of Space Act Agreements by technical and program personnel. SAAM also is used for editing and will be used later for maintaining electronic copies of all Space Act Agreements. During the initial drafting, the software prompts NASA personnel proposing an agreement to answer questions regarding the agreement. On the basis of the answers, the software selects from a matrix of NASA standard clauses to produce a first draft of the agreement. The draft agreement and information submitted by the NASA personnel are electronically routed to Glenn s Commercial Technology Office for review and, where necessary, editing. The final version of the agreement, along with any supporting documentation, is then routed for electronic concurrence/approval to the necessary internal review participants using the electronic routing system (e-router). SAAM was developed cooperatively by Glenn s Commercial Technology Office and Glenn s Office of Chief Counsel. Currently, SAAM is being evaluated by the NASA Headquarters General Counsel Office for use at all NASA centers. This system allows for the effective processing of Space Act Agreements for NASA s internal and external customers. Document control is maintained by a database. With SAAM s electronic routing, review times can be reduced significantly, allowing Glenn to more rapidly establish partnerships with industry. Prior to the creation of SAAM, it took several hours to draft a Space Act Agreement. With SAAM in place, the document can be written in about 30 min. Using the e-router also saves time in determining where the agreement is in the routing process. The document can be tracked easily, and delays can be avoided. Important research with industry partners can commence quickly after preliminary discussions have been held. The development of these products is in line with the expanding e-government initiative that is part of the Presidential Management Agenda. By using this product, NASA researchers can secure greater support from industry and academia partners. The Space Act Agreement Maker has been very well received at NASA Headquarters and at some of the other NASA centers as well. We anticipate that the NASA Ames Research Center will have the system in place very soon, and that some of the other centers will use SAAM in the near future. The General Counsel s office at NASA Headquarters has encouraged the Glenn team to develop a similar system for processing patent licenses. Find out more about Glenn's Technology Transfer & Partnership Office http://technology.grc.nasa.gov/.

Stauber, Laurel J.↗

Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences, which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comfort monitoring? Environmental assessment follow-up under community-industry negotiated environmental agreements

Negotiated environmental agreements are becoming common practice in the mining industry. In principle, negotiated environmental agreements are said to respond to many of the shortcomings of environmental impact assessment by providing for improved follow-up of project impacts through, among other things, data provision, engaging stakeholders in the monitoring and management of project impacts, and building capacity at the local level to deal with project-induced environmental change. In practice, however, little is known about the efficacy of follow-up under negotiated environmental agreements between proponents and communities and the demonstrated value added to project impact management. This paper examines follow-up practice under negotiated environmental agreements with a view to understanding whether and how community-based monitoring under privatized agreements actually contributes to improved follow-up and impact management. Based on lessons emerging from recent experiences with environmental agreements in Canada's uranium industry, we show that follow-up under negotiated agreements may be described as 'comfort monitoring'. While such monitoring does improve community-industry relations and enhance corporate image, it does little to support effects-based management. If follow-up under negotiated agreements is to be credible over the long term, there is a need to ensure that monitoring results are useful for, and integrated with, regulatory-based monitoring and project impact management practices.

54 ENVIRONMENTAL SCIENCES↗

A Large-Scale Analysis to Optimize the Control and V2V Communication Protocols for CDA Agreement-Seeking Cooperation

Cooperative driving automation (CDA) Class C, agreement-seeking cooperation, is an innovative and practical solution that can promote cooperation among general passenger vehicles on the road. However, more comprehensive studies are needed before establishing the standard protocols of agreement-seeking cooperation, such as communication frequency and the duration of cooperation. Here, this article presents an initiative study on the impacts of communication capabilities on agreement-seeking cooperation. Through a large-scale analysis by regulating vehicle-to-vehicle (V2V) communication metrics, this work suggests desirable system parameters that can maximize the benefits of cooperation and ensure reliable operability while avoiding exhaustive communication loads. As the first step, an example agreement-seeking cooperation system is created for a car-following scenario, including decision-making and control algorithms for autonomous vehicles. Then, software-in-the-loop tests explore the performance of the developed system as it encounters various communication risks, such as latency and message packet drops. The system performance metrics are evaluated from various angles, including the time consumed for the agreement-seeking process, cooperation ratio, and the ratio of faulty cooperation. Energy saving from the cooperation is assessed by using simulation software that can run multiple high-fidelity vehicle models simultaneously. Based on the analyses, this article suggests the V2V communication requirements for the reliable operation of CDA agreement-seeking, which can be referred to when developing the standard protocols of agreement-seeking cooperation.

42 ENGINEERING↗

Agency Agreements Process Champion Support Intern

This document will provide information on the 2018 Spring semester NIFS Intern who represented the Office of Chief Financial Officer (OCFO) as a Reimbursable Accountant at Kennedy Space Center (KSC). This intern supported the Agency Agreements Process Champions and Team Lead, Susan Kroskey, Sandy Massey and Mecca Murphy, with major initiatives to advance the KSC OCFO's vision of creating and innovating healthy financial management practices that maximize the value of resources entrusted to NASA. These initiatives include, but are not limited to: updating the Agency Guidance and NASA Procedural Guidance 9090.1 Agreements, implementing a new budget structure to be utilized across all centers, submitting a Call Request (CRQ) to enhance non-federal customer reporting, initiating a discussion to incorporate a 3-year funding program for NASA agreements, and undertaking the Office of Inspector General (OIG) Audit. In support of these initiatives, this intern identified technical methods to enhance and reduce the workload of financial processes for reimbursable and non-reimbursable agreements, prepared reports in support of accounting functions, and performed administrative work and miscellaneous technical tasks in support of the OCFO as requested. In conclusion of the internship, the intern will become knowledgeable on reimbursable accounting, reimbursable policy, types of reimbursable agreements, the agreements process, estimated pricing reports, and the roles and responsibilities of the Financial Accounting and Financial Services offices.

Process Champion↗

Inter-radiologist agreement using Society of Abdominal Radiology-American Gastroenterological Association (SAR-AGA) consensus nomenclature for reporting CT and MR enterography in children and young adults with small bowel Crohn disease

Purpose: To assess inter-radiologist agreement using the Society of Abdominal Radiology-American Gastroenterological Association (SAR-AGA) consensus recommendations for reporting CT/MR enterography exams in pediatric and young adult small bowel Crohn disease (CD). Methods: Institutional review board approval was obtained for this HIPAA-compliant retrospective investigation; the requirement for informed consent was waived. 25 CT and 25 MR enterography exams performed in children and young adults (age range: 6–23 years) between January 2015 and April 2017 with a distribution of ileal CD severity (phenotype) were identified: normal or chronic CD without active inflammation (40%), active inflammatory CD (20%), stricturing CD (20%), and penetrating CD (20%). Five fellowship-trained pediatric radiologists, blinded to one another, documented key imaging findings and standardized impressions based on SAR-AGA consensus recommendations. Inter-radiologist agreement was evaluated using Fleiss’ multi-rater kappa statistic (κ) with 95% confidence intervals (CI). Results: Inter-radiologist agreement was moderate for all key imaging findings except presence of ulcerations (κ 0.37 [95% CI 0.28–0.46]) and sacculations (κ 0.31 [95% CI 0.23–0.40]). Agreement for standardized impressions was substantial for stricturing disease (κ 0.79 [95% CI 0.70–0.87]) and moderate for presence of inflammation (κ 0.49 [95% CI 0.44–0.56]) and penetrating disease (κ 0.58 [95% CI 0.49–0.67]). No significant difference in agreement was found between CT and MRI. Conclusions: Agreement among five pediatric radiologists was moderate to substantial for SAR-AGA standardized impressions and fair to moderate for key imaging findings of pediatric and young adult CD.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Retroperitoneal Sarcoma Target Volume and Organ at Risk Contour Delineation Agreement Among NRG Sarcoma Radiation Oncologists

Purpose: The purpose of this study was to evaluate the variability in target volume and organ at risk (OAR) contour delineation for retroperitoneal sarcoma (RPS) among 12 sarcoma radiation oncologists. Methods and Materials: Radiation planning computed tomography (CT) scans for 2 cases of RPS were distributed among 12 sarcoma radiation oncologists with instructions for contouring gross tumor volume (GTV), clinical target volume (CTV), high-risk CTV (HR CTV: area judged to be at high risk of resulting in positive margins after resection), and OARs: bowel bag, small bowel, colon, stomach, and duodenum. Analysis of contour agreement was performed using the simultaneous truth and performance level estimation (STAPLE) algorithm and kappa statistics. Results: Ten radiation oncologists contoured both RPS cases, 1 contoured only RPS1, and 1 contoured only RPS2 such that each case was contoured by 11 radiation oncologists. The first case (RPS 1) was a patient with a de-differentiated (DD) liposarcoma (LPS) with a predominant well-differentiated (WD) component, and the second case (RPS 2) was a patient with DD LPS made up almost entirely of a DD component. Contouring agreement for GTV and CTV contours was high. However, the agreement for HR CTVs was only moderate. For OARs, agreement for stomach, bowel bag, small bowel, and colon was high, but agreement for duodenum (distorted by tumor in one of these cases) was fair to moderate. Conclusions: For preoperative treatment of RPS, sarcoma radiation oncologists contoured GTV, CTV, and most OARs with a high level of agreement. HR CTV contours were more variable. Further clarification of this volume with the help of sarcoma surgical oncologists is necessary to reach consensus. More attention to delineation of the duodenum is also needed.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Application Agreement and Integration Services

Application agreement and integration services are required by distributed, fault-tolerant, safety critical systems to assure required performance. An analysis of distributed and hierarchical agreement strategies are developed against the backdrop of observed agreement failures in fielded systems. The documented work was performed under NASA Task Order NNL10AB32T, Validation And Verification of Safety-Critical Integrated Distributed Systems Area 2. This document is intended to satisfy the requirements for deliverable 5.2.11 under Task 4.2.2.3. This report discusses the challenges of maintaining application agreement and integration services. A literature search is presented that documents previous work in the area of replica determinism. Sources of non-deterministic behavior are identified and examples are presented where system level agreement failed to be achieved. We then explore how TTEthernet services can be extended to supply some interesting application agreement frameworks. This document assumes that the reader is familiar with the TTEthernet protocol. The reader is advised to read the TTEthernet protocol standard [1] before reading this document. This document does not re-iterate the content of the standard.

Driscoll, Kevin R.↗

REVIEW OF THE NEGOTIATION OF THE MODEL PROTOCOL ADDITIONAL TO THE AGREEMENT(S) BETWEEN STATE(S) AND THE INTERNATIONAL ATOMIC ENERGY AGENCY FOR THE APPLICATION OF SAFEGUARDS,INFCIRC/540 (Corrected) VOLUME I/III SETTING THE STAGE: 1991-1996.

Events in Iraq at the beginning of the 1990s demonstrated that the safeguards system of the International Atomic Energy Agency (IAEA) needed to be improved. It had failed, after all, to detect Iraq's clandestine nuclear weapon program even though some of Iraq's's activities had been pursued at inspected facilities in buildings adjacent to ones being inspected by the IAEA. Although there were aspects of the implementation of safeguards where the IAEA needed to improve, the primary limitations were considered to be part of the safeguards system itself. That system was based on the Nuclear Nonproliferation Treaty of 1970, to which Iraq was a party, and implemented on the basis of a model NPT safeguards agreement, published by the IAEA 1972 as INFCIRC/153 (corrected). The agreement calls for states to accept and for the IAEA to apply safeguards to all nuclear material in the state. Iraq was a party to such an agreement, but it violated the agreement by concealing nuclear material and other nuclear activities from the IAEA. Although the IAEA was inspecting in Iraq, it was hindered by aspects of the agreement that essentially limited its access to points in declared facilities and provided the IAEA with little information about nuclear activities anywhere else in Iraq. As a result, a major review of the NPT safeguards system was initiated by its Director General and Member States with the objective of finding the best means to enable the IAEA to detect both diversions from declared stocks and any undeclared nuclear material or activities in the state. Significant improvements that could be made within existing legal authority were taken quickly, most importantly a change in 1992 in how and when and what design information would be reported to the IAEA. During 1991-1996, the IAEA pursued intensive study, legal and technical analysis, and field trials and held numerous consultations with Member States. The Board of Governors discussed the issue of strengthening safeguards at almost all of its meeting.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Hand me the franchise agreement: municipalities add another policy tool to their clean energy toolbox

A growing list of the more than 20,000 municipalities in the United States are considering pathways to achieve renewable energy goals. One emerging trend is for municipalities to incorporate energy objectives into their franchise agreements with an electric service provider. Franchise agreements are contracts between municipalities and utilities that grant the utility authority to serve customers in the municipality. In some cases, municipalities have negotiated renewable energy objectives into these agreements. It is still unclear how many municipalities have exercised this authority and to what effect. From a national dataset of 3500 franchise agreements, we selected five cities that adopted renewable energy or energy efficiency objectives into or alongside their franchise agreements for deeper analysis: Chicago, Illinois; Denver, Colorado; Sarasota, Florida; Minneapolis, Minnesota; and Salt Lake City, Utah. We generated seven key takeaways for other cities considering this pathway to achieve their energy objectives. In summary, municipalities can leverage franchise negotiations to pursue both modest and ambitious clean energy goals (i.e. 100% renewable electricity). This study provides municipalities with critical insight on how they can use this potentially formidable tool to achieve their own energy objectives.

14 SOLAR ENERGY↗

Bayesian probability of predictive agreement for comparing the outcome of two separate regressions

The concept of a Bayesian probability of agreement was recently introduced to give the posterior probabilities that the response surfaces for two different groups are within δ of one another. For example, a difference of less than δ in the mean response at fixed levels of the predictor variables might be thought to be practically unimportant. In such a case, we would say that the mean responses are in agreement. The posterior probability of this is called the Bayesian probability of agreement. In this article, we quantify the probability that new response observations from two groups will be within δ for a continuous response, and the probability that the two responses agree completely for categorical cases such as logistic regression and Poisson regression. We call these Bayesian comparative predictive probabilities, with the former being the predictive probability of agreement. We use Markov chain Monte Carlo simulation to estimate the posterior distribution of the model parameters and then the predictive probability of agreement. Here, we illustrate the use of this methodology with three examples and provide a freely available R Shiny app that automates the computation and estimation associated with the methodology.

97 MATHEMATICS AND COMPUTING↗

Reader agreement and accuracy of ultrasound features for hepatic steatosis

Purpose: The purpose of the study is to assess the reader agreement and accuracy of eight ultrasound imaging features for classifying hepatic steatosis in adults with known or suspected hepatic steatosis. Methods: This was an IRB-approved, HIPAA-compliant prospective study of adult patients with known or suspected hepatic steatosis. All patients signed written informed consent. Ultrasound images (Siemens S3000, 6C1HD, and 4C1 transducers) were acquired by experienced sonographers following a standard protocol. Eight readers independently graded eight features and their overall impression of hepatic steatosis on ordinal scales using an electronic case report form. Duplicated images from the 6C1HD transducer were read twice to assess intra-reader agreement. Intra-reader, inter-transducer, and inter-reader agreement were assessed using intraclass correlation coefficients (ICC). Features with the highest intra-reader agreement were selected as predictors for dichotomized histological steatosis using Classification and Regression Tree (CART) analysis, and the accuracy of the decision rule was compared to the accuracy of the radiologists’ overall impression. Results: 45 patients (18 males, 27 females; mean age 56 ± 12 years) scanned from September 2015 to July 2016 were included. Mean intra-reader ICCs ranged from 0.430 to 0.777, inter-transducer ICCs ranged from 0.228 to 0.640, and inter-reader ICCs ranged from 0.014 to 0.561. The CART decision rule selected only large hepatic vein blurring and achieved similar accuracy to the overall impression (74% to 75% and 68% to 72%, respectively). Conclusions: Large hepatic vein blurring, liver–kidney contrast, and overall impression provided the highest reader agreement. Large hepatic vein blurring may provide the highest classification accuracy for dichotomized grading of hepatic steatosis.

62 RADIOLOGY AND NUCLEAR MEDICINE↗