Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system engineering system process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

A Review of Coupled Geochemical–Geomechanical Impacts in Subsurface CO 2 , H 2 , and Air Storage Systems

Increased demand for decarbonization and renewable energy has led to increasing interest in engineered subsurface storage systems for large-scale carbon reduction and energy storage. In these applications, a working fluid (CO 2 , H 2 , air, etc.) is injected into a deep formation for permanent sequestration or seasonal energy storage. The heterogeneous nature of the porous formation and the fluid–rock interactions introduce complexity and uncertainty in the fate of the injected component and host formations in these applications. Interactions between the working gas, native brine, and formation mineralogy must be adequately assessed to evaluate the efficiency, risk, and viability of a particular storage site and operational regime. This study reviews the current state of knowledge about coupled geochemical–geomechanical impacts in geologic carbon sequestration (GCS), underground hydrogen storage (UHS), and compressed air energy storage (CAES) systems involving the injection of CO 2 , H 2 , and air. Specific review topics include (1) existing injection induced geochemical reactions in these systems; (2) the impact of these reactions on the porosity and permeability of host formation; (3) the impact of these reactions on the mechanical properties of host formation; and (4) the investigation of geochemical-geomechanical process in pilot scale GCS. This study helps to facilitate an understanding of the potential geochemical–geomechanical risks involved in different subsurface energy storage systems and highlights future research needs.

08 HYDROGEN↗

Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.

none↗

Testing Results from the Low Activity Waste Pretreatment System (LAWPS) Full-Scale Ion Exchange Column Test and Engineering Scale Integrated System Test - 18634

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003- 02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Overarching technical objectives of performing the full-scale ion exchange test and the engineering-scale integrated test are to: 1. Test interactions between unit process operations; 2. Test removal of non-radioactive cesium from process stream; 3. Test removal of undissolved solids from process stream; 4. Confirm operational flow rate range and stability; 5. Confirm volumetric throughput of waste stream over flow operating range; 6. Confirm range of process temperatures over planned operating range; 7. Establish system hydraulics and process criteria; 8. Coordinate key control and monitoring components; 9. Establish treated product chemistry meets requirements (cesium, solids, and pH); and 10. Test the hazard control strategy for a no flow condition through the IX column. Data collected during testing will be used by WRPS to validate the preliminary design, inform the final design of the permanent plant equipment, and demonstrate that the critical technology elements have advanced to a technology readiness level of 6 (prototypical system validation in a relevant environment). Testing on both platforms started in fall of 2016 generating NQA-1 data. This paper covers test results from the first five phases of testing on the 1/9. scale integrated test platform. A further three phases of testing are currently being executed, these including a 5.6 M sodium simulant containing foulant, a high viscosity simulant and finally a run performed with a lower Cs concentration (all earlier tests were spiked to 4 x Cs to reduce volume and cost). Results from these tests were not available at the time of writing available. Results are also presented from the full scale IX testing. Eight test were performed covering column loading, elution and regeneration; column loading, elution and regeneration with upflow displacement; IX column loading and gas migration; resin removal; solids accumulation; and IX column emergency recirculation and vent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE SBIR 2014 Topic 2.C – Phase I Final Report

Freshwater is a vital resource for human survival as well as a key component of a wide range of industrial and agricultural needs. However, only 0.65% of the world’s water resources are available as freshwater, and the demand on the world’s water reserves continues to increase, with the demand beginning to outpace the supply in many areas. A water-energy nexus is being reached that requires low –cost and –energy solutions for various degrees of treated water. In a 2012 survey, 88% of Americans were concerned about potential water shortages and approximately two-thirds of the world’s population will be suffering a water shortage over the next few years. Seawater and other saline water materials make up around 98% of the available water, representing an almost unlimited supply of water. The energy, cost and maintenance to remove salts and other unwanted compounds is a barrier to widespread implementation of salt-to-freshwater facilities. These facilities most commonly use reverse osmosis (RO) systems. Due to the high required pressures and moving parts these facilities consume much grid energy and require constant maintenance leading to high capital and operational costs. RO also generates highly concentrated brine that is costly to safely return to the ocean. Capacitive desalination (or capacitive deionization [CDI]) has no moving parts (aside from a low pressure pump and valves), operates at low pressure and does not generate brine that is hazardous to marine life. Not only can the capacitive charge/discharge be cycled almost indefinitely but the system uses low energy and capacitive discharge electrical current can be co-generated back to the system. However, CDI has not seen widespread use for large- or small- scale desalination because electrode efficiency limits the extraction rate below what is useful for most applications. Mainstream Engineering Corporation (MEC) has demonstrated an innovative new electrode structure for the high efficiency desalination of brackish water by capacitive deionization. Electrode manufacturing (nanomanufacturing) is a highly scalable and low-cost electrochemical self-assembly method using a templated process that Mainstream has pioneered and leveraged for several energy technologies over the last decade. The primary accomplishment for Phase I is the fabrication and demonstration of CDI electrode structures are: • Demonstrating the linear scalability of templated approach to the fabrication scaling the electrode structure. • Demonstrated the ability to tune the fabrication of the electrode structures to produce electrodes with a highly controllable aligned nanopore diameter and nanopore depth. • Demonstrated the efficient removal of a sodium chloride salt from brackish water with a 60 times improvement in mg-salt removed/g-carbon compared to a commercial system under the same conditions. • Demonstrated good reproducibility and stability of the electrode structure under realistic CDI operating conditions. • Demonstrated charge efficiency as high as 93% with an expected system level energy requirement of 0.7 to 1.5 kWh/m3 of water; significantly lower than the 2.9 to 3.7 kWh/m3 observed for RO systems Based on the performance characteristics of the electrodes, Mainstream was able to propose a modular and scalable capacitive deionization design that can be adapted to a wide range of conditions providing energy efficient desalination of brackish water.

36 MATERIALS SCIENCE↗

RANGERS: Modeling Report on Integrity and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF

The Engineered Barrier System (EBS) plays an important role in ensuring the long-term safety and containment of high-level waste (HLW) and spent nuclear fuel (SNF) in deep geological repositories in salt formation. As part of a multi-barrier system, the EBS works alongside the natural barrier, which is the salt formation itself and the technical barrier comprising the disposal casks. The primary function of the EBS is to maintain containment during a defined period until the backfill used in the repository made of crushed salt, develops its sealing capacity through compaction. Over the time, the backfill eventually compacts to a state of low porosity and permeability, acting as a long-term seal. However, until this process is complete, the EBS must retain its structural and functional integrity. Regulatory guidelines in Germany currently require the EBS to remain effective for up to next ice age, that is expected in 50,000 years. The significant hydro-geological and topographic changes expected during an ice age could make it impossible to accurately predict the hydro-chemical conditions within the repository system at that time. In response to these challenges, BGE TECHNOLOGY GmbH (BGE TEC) and Sandia National Laboratories (SNL) have jointly developed a comprehensive methodology for the design and safety assessment of engineered barrier systems within the scope of the RANGERS project. This methodology is tailored for repositories in salt formations. The developed methodology provides a structured approach for designing and assessing the performance of the EBS in salt-based repositories. It begins with defining a sealing concept based on the geological characteristics of the selected site and the overall repository design. The entire repository system, comprising the geological site, repository infrastructure, and EBS, is then subjected to a Features, Events, and Processes (FEP) analysis, focusing solely on those FEPs that affect the EBS. The derived FEPs help identify the loads and stresses acting on the EBS, which serve as the foundation for conducting an integrity assessment. This analysis helps predict the EBS’s evolution and performance over the regulatory time frame, feeding into integrated performance assessment simulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of prechamber enabled mixing-controlled combustion strategy for ultra-low methane emissions from lean burn natural gas engines

This numerical study explores the optimization of Prechamber Enabled Mixing-Controlled Combustion (PC-MCC) using natural gas in heavy-duty engines, aiming to enhance combustion efficiency to minimize methane slip and NOx emissions. The approach involves a prechamber ignition system, distinct from conventional spark ignition (SI) systems, to initiate combustion of direct injected natural gas. By leveraging the robust ignition characteristics of the prechamber, the PC-MCC method demonstrates significant potential in achieving efficient combustion akin to diesel engines but with lower greenhouse gas emissions. The research evaluates the effects of various geometric and operational parameters on the combustion process and emissions, including prechamber volume, nozzle diameter, direct injector (DI) geometry, and engine operating strategies. Computational Fluid Dynamics (CFD) simulations are utilized, focusing on a heavy-duty, single-cylinder engine modeled after the Caterpillar C9.3B engine. Key findings indicate that a prechamber volume of 3 cc, coupled with a nozzle diameter of 2.75 mm for two prechamber holes, strikes an optimal balance between combustion efficiency and emissions reduction. This configuration ensures robust combustion across a range of operating conditions while maintaining methane slip within targeted limits. Further investigation into DI geometry shows the significance of the injector umbrella angle and nozzle diameter in shaping the fuel-air mixing and combustion dynamics. An umbrella angle of 130° and a nozzle diameter of 300 microns are identified as optimal, promoting rapid and efficient combustion with minimized methane and NOx emissions. The study also investigates the impact of injection timing and pressure, highlighting their roles in controlling combustion timing and influencing emissions levels. Advanced injection timing is found to be crucial in achieving the desired low methane slip, whereas retarded injection timing assists to reduce NOx emissions while having a slight increase in methane emissions. Operating strategies incorporating various levels of Exhaust Gas Recirculation (EGR) are assessed for their effectiveness in further reducing emissions. The research demonstrates that a judicious combination of internal hot EGR and careful calibration of DI pressure and SOI timing can achieve significant reductions in NOx emissions while keeping methane slip under control. Specifically, an internal EGR level of 15%–25%, combined with DI pressures of 200–300 bar and injection timings at or after top dead center, is recommended. These findings contribute valuable insights into the development of advanced combustion techniques for natural gas engines, offering a viable pathway to reduce methane slip without compromising engine efficiency or performance. The PC-MCC system presents a promising solution for the future of heavy-duty natural gas engine technology to reduce methane emissions.

Nsaif, Osama↗

Redirection of metabolism for hydrogen production

This project is to develop and apply techniques in metabolic engineering to improve the biocatalytic potential of the bacterium Rhodopseudomonas palustris for nitrogenase-catalyzed hydrogen gas production. R. palustris, is an ideal platform to develop as a biocatalyst for hydrogen gas production because it is an extremely versatile microbe that produces copious amounts of hydrogen by drawing on abundant natural resources of sunlight and biomass. Anoxygenic photosynthetic bacteria, such as R. palustris, generate hydrogen and ammonia during a process known as biological nitrogen fixation. This reaction is catalyzed by the enzyme nitrogenase and normally consumes nitrogen gas, ATP and electrons. The applied use of nitrogenase for hydrogen production is attractive because hydrogen is an obligatory product of this enzyme and is formed as the only product when nitrogen gas is not supplied. Our challenge is to understand the systems biology of R. palustris sufficiently well to be able to engineer cells to produce hydrogen continuously, as fast as possible and with as high a conversion efficiency as possible of light and electron donating substrates. For many experiments we started with a strain of R. palustris that produces hydrogen constitutively under all growth conditions. We then identified metabolic pathways and enzymes important for removal of electrons from electron-donating organic compounds and for their delivery to nitrogenase in whole R. palustris cells. For this we developed and applied improved techniques in 13C metabolic flux analysis. We identified reactions that are important for generating electrons for nitrogenase and that are yield-limiting for hydrogen production. We then increased hydrogen production by blocking alternative electron-utilizing metabolic pathways by mutagenesis. In addition we found that use of non-growing cells as biocatalysts for hydrogen gas production is an attractive option, because cells divert all resources away from growth and to hydrogen. Also R. palustris cells remain viable in a non-growing state for long periods of time.

59 BASIC BIOLOGICAL SCIENCES↗

Mathematical modeling of a moving bed reactor for post-combustion CO 2 capture

A mathematical model for a moving bed reactor with embedded heat exchanger has been developed for application to solid sorbent-based capture of carbon dioxide from flue gas emitted by coal-fired power plants. The reactor model is one-dimensional, non-isothermal, and pressure-driven. The two-phase (gas and solids) model includes rigorous kinetics and heat and mass transfer between the two phases. Flow characteristics of the gas and solids in the moving bed are obtained by analogy with correlations for fixed and fluidized bed systems. From the steady-state perspective, this work presents the impact of key design variables that can be used for optimization. From the dynamic perspective, the article shows transient profiles of key outputs that should be taken into account while designing an effective control system. Additionally, the article also presents performance of a model predictive controller for the moving bed regenerator under process constraints.

42 ENGINEERING↗

Real-time monitoring, prognosis, and resilient control for wind turbine systems

This special issue aims to provide a platform for academic and industrial communities to report recent results and emerging research in real-time monitoring, fault diagnosis, prognosis, and resilient control and design of wind turbine systems. After a strict peer-review process, 20 papers were selected, which represent the most recent progress of the real-time monitoring, diagnosis, prognosis, and resilient control methods/techniques in wind turbine systems.

17 WIND ENERGY↗

Acoustic waveguiding in a silicon carbide phononic crystals at microwave frequencies

Two dimensional SiC–air phononic crystals have been modeled, fabricated, and tested with a measured bandgap ranging from 665 to 693 MHz. Snowflake air inclusions on a hexagonal lattice were used for the phononic crystal. By manipulating the phononic crystal lattice and inserting circular inclusions, a waveguide was created at 680 MHz. The combined insertion loss and propagation loss for the waveguide is 8.2 dB, i.e., 39% of the energy is guided due to the high level of the confinement afforded by the phononic crystal. In conclusion, the SiC–air phononic crystals and waveguides were fabricated using a CMOS-compatible process, which allows for seamless integration of these devices into wireless communication systems operating at microwave frequencies.

42 ENGINEERING↗

Inferring the Dynamics of the State Evolution During Quantum Annealing

To solve an optimization problem using a commercial quantum annealer, one has to represent the problem of interest as an Ising or a quadratic unconstrained binary optimization (QUBO) problem and submit its coefficients to the annealer, which then returns a user-specified number of low-energy solutions. It would be useful to know what happens in the quantum processor during the anneal process so that one could design better algorithms or suggest improvements to the hardware. However, existing quantum annealers are not able to directly extract such information from the processor. Hence, in this work we propose to use advanced features of D-Wave 2000Q to indirectly infer information about the dynamics of the state evolution during the anneal process. Specifically, D-Wave 2000Q allows the user to customize the anneal schedule, that is, the schedule with which the anneal fraction is changed from the start to the end of the anneal. Furthermore, using this feature, we design a set of modified anneal schedules whose outputs can be used to generate information about the states of the system at user-defined time points during a standard anneal. With this process, called "slicing", we obtain approximate distributions of lowest-energy anneal solutions as the anneal time evolves. We use our technique to obtain a variety of insights into the annealer, such as the state evolution during annealing, when individual bits in an evolving solution flip during the anneal process and when they stabilize, and we introduce a technique to estimate the freeze-out point of both the system as well as of individual qubits.

42 ENGINEERING↗

Automated Monitoring System for Self-Synchronizing Vibrational Drives

An automated monitoring system has been designed to maintain stable operation of self-synchronizing vibrational drives. By means of the system, information is collected and automatically processed. A built-in electrical feedback loop ensures synchronous drive operation.

42 ENGINEERING↗

Integrated Off-Gas System Tests on the DM1200 Melter with RPP-WTP LAW Sub-Envelope Bl Simulants, VSL-03R3851-1, Rev. 0 (Oct 2003)

The report documents melter and off-gas performance results obtained on the DM1200 melter during processing of LAW Sub-Envelope B1 feed. The principal objectives of the DM1200 melter testing were to demonstrate suitable processing and production rates for LAW B1 feed; characterize the glass product for elemental composition; measure elemental emission rates and decontamination factors (DFs) across the melter and off-gas treatment components; and provide additional data on the performance of the thermal catalytic oxidation and selective catalytic reduction (TCO/SCR) unit efficiency in treating organic emissions. The feed was spiked with organic compounds for part of the testing duration. All data were collected for use in engineering and system design purposes. No sampling and analysis to collect environmental data was performed during these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗