Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Automating Embedded Analysis Capabilities and Managing Software Complexity in Multiphysics Simulation, Part I: Template-Based Generic Programming

An approach for incorporating embedded simulation and analysis capabilities in complex simulation codes through template-based generic programming is presented. This approach relies on templating and operator overloading within the C++ language to transform a given calculation into one that can compute a variety of additional quantities that are necessary for many state-of-the-art simulation and analysis algorithms. An approach for incorporating these ideas into complex simulation codes through general graph-based assembly is also presented. These ideas have been implemented within a set of packages in the Trilinos framework and are demonstrated on a simple problem from chemical engineering.

Pawlowski, Roger P.↗

Program Helps Standardize Documentation Of Software

Intelligent Documentation Management System, IDMS, computer program developed to assist project managers in implementing information system documentation standard known as NASA-STD-2100-91, NASA STD, COS-10300, of NASA's Software Management and Assurance Program. Standard consists of data-item descriptions or templates, each of which governs particular component of software documentation. IDMS helps program manager in tailoring documentation standard to project. Written in C language.

Howe, G.↗

The application of remote sensing to resource management and environmental quality programs in Kansas

Specific assistance to state agencies and public bodies on over 15 remote sensing projects concerned with (1) urban and regional analysis, (2) rural development, and (3) habitat management and environmental analysis is discussed. Specific problems of officials are considered and a basis for communication by demonstration is provided. In addition to data products in support of specific agency projects; consultation and training in use of satellite and aircraft imagery is provided to personnel from several state, regional, and county agencies. Effective communication and confidence is established through these efforts and users now routinely seek information and advice about the application of remote sensing technology to solution of their agency problems.

Barr, B. G.↗

Comparison of Optimal Energy Management Strategies Using Dynamic Programming, Model Predictive Control, and Constant Velocity Prediction

Due to the recent advancements in autonomous vehicle technology, future vehicle velocity predictions are becoming more robust which allows fuel economy (FE) improvements in hybrid electric vehicles through optimal energy management strategies (EMS). A realworld highway drive cycle (DC) and a controls-oriented 2017 Toyota Prius Prime model are used to study potential FE improvements. We proposed three important metrics for comparison: (1) perfect full drive cycle prediction using dynamic programming, (2) 10-second prediction horizon model predictive control (MPC), and (3) 10-second constant velocity prediction. These different velocity predictions are put into an optimal EMS derivation algorithm to derive optimal engine torque and engine speed. The results show that the constant velocity prediction algorithm outperformed the baseline control strategy but underperformed the MPC strategy with an average 1.58% and 2.45% of FE improvement with highway and city-highway DC. Also, using a 10-second prediction window MPC strategy provided FE improvement results close to the full drive cycle prediction case. MPC has the potential to achieve 60%-65% and 70% - 80% of global FE improvement over highway and city-highway DC respectively.

Patel, Amol Arvind↗

Comparison of Optimal Energy Management Strategies Using Dynamic Programming, Model Predictive Control, and Constant Velocity Prediction

Due to the recent advancements in autonomous vehicle technology, future vehicle velocity predictions are becoming more robust which allows fuel economy (FE) improvements in hybrid electric vehicles through optimal energy management strategies (EMS). A real- world highway drive cycle (DC) and a controls-oriented 2017 Toyota Prius Prime model are used to study potential FE improvements. We proposed three important metrics for comparison: (1) perfect full drive cycle prediction using dynamic programming, (2) 10-second prediction horizon model predictive control (MPC), and (3) 10-second constant velocity prediction. These different velocity predictions are put into an optimal EMS derivation algorithm to derive optimal engine torque and engine speed. The results show that the constant velocity prediction algorithm outperformed the baseline control strategy but underperformed the MPC strategy with an average 1.58% and 2.45% of FE improvement with highway and city-highway DC. Also, using a 10-second prediction window MPC strategy provided FE improvement results close to the full drive cycle prediction case. MPC has the potential to achieve 60%-65% and 70% - 80% of global FE improvement over highway and city-highway DC respectively.

Patel, Amol Arvind↗

City of Phoenix - Energize Phoenix Program

Energize Phoenix (EPHX) was designed as an ambitious, large-scale, three-year pilot program to provide energy efficiency upgrades in buildings, along Phoenix’s new Light Rail Corridor – part of a federal effort to reduce energy consumption and stimulate job growth, while simultaneously reducing the country’s carbon footprint and promoting a shift towards a green economy. The program was created through a 2010 competitive grant awarded to the City of Phoenix who managed the program in partnership with Arizona State University (ASU), the state’s largest university, and Arizona Public Service (APS), the state’s largest electricity provider. The U.S. Department of Energy (DOE) Better Buildings Neighborhood Program (BBNP) and the American Recovery and Reinvestment Act (ARRA) of 2009 provided $25M in funding for the EPHX program. The Light Rail Corridor runs through the heart of downtown Phoenix, making most high-rise and smaller commercial buildings eligible to participate in the EPHX program, along with a diverse mix of single and multi-family residential buildings. To ensure maximum impact and deeper market penetration, Energize Phoenix was subdivided into three unique parts: i. commercial rebate program, ii. commercial financing program, and iii. residential program Each component was managed by the City of Phoenix in partnership with APS. Phoenix was fortunate to partner with APS, which already operated robust commercial and residential rebate programs within its service territory. Phoenix tapped into the existing utility contractor network, provided specific training to over 100 contracting firms, and leveraged the APS rebate program structure (energy efficiency funding) to launch the EPHX commercial and residential rebate programs. The commercial finance program was coordinated and managed through a contract with National Bank of Arizona, NBAZ, which also provided project capital leveraging EPHX finance funds. Working in unison, approved contractors jointly produced more than 161,000 labor hours in pursuit of EPHX goals over the life of the project. Labor hours were spread among electricians, heating, ventilating and air-conditioning (HVAC) technicians, marketing professionals, engineers, sales, and administrative support staff across the approved contractor workforce. Program participants received both the utility rebate along with the EPHX rebate, and depending on project size and utility rebate structure some projects resulted in low to no-cost upgrades for customers. Phoenix also partnered with ASU, a grant sub-recipient, to leverage the institution’s expertise in research and data analysis. In this partnership, ASU accepted marketing responsibilities for the grant and partnered with DRA Communications (DRA), a Phoenix-based marketing firm, to create and communicate the message out to the marketplace. The EPHX program has completed its energy upgrade activities. A review of the work completed by ASU revealed that the EPHX program substantially exceeded the program’s stated goals by retrofitting/upgrading over 33 million sq ft of commercial space (30 million sq ft goal exceeded by 11%) and 2,014 residential units (1,700 unit goal exceeded by 18%) along the Light Rail Corridor. The program helped stimulate economic growth by adding $31million to the local economy and enhanced an already robust energy efficiency contractor network. This contractor network will continue to promote utility energy incentives to sustain energy efficiency upgrade activities in the future. Finally, EPHX helped reduce participants annual energy consumption by 135 million kilowatt-hour (kWh) translating into over $12.5 million of annual energy cost avoidance for the community. This also resulted in projected payback period of 4.5 years for total investment by all parties and reduced greenhouse gas emissions by over 95,000 metric tons of carbon dioxide equivalent (CO2e).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NS&T Managment Observations - 1st Quarter

The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements’ expectations as they relate to safety, security, quality, and work performance. Management observations (observations) are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of management’s observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&T’s MOP.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NS&T Management Observations: Quarterly Performance Analysis

The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements’ expectations as they relate to safety, security, quality, and work performance. Management observations (observations) are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY-14. This quarterly report is intended to (a) summarize the participation and quality of management’s observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&T’s MOP.

99 GENERAL AND MISCELLANEOUS↗

NS&T Management Observations - 3rd Quarter

The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements’ expectations as they relate to safety, security, quality, and work performance. Management observations are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of management’s observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&T’s MOP.

99 GENERAL AND MISCELLANEOUS↗

NS&T Management Observations

The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements’ expectations as they relate to safety, security, quality, and work performance. Management observations (observations) are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of management’s observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&T’s MOP.

99 GENERAL AND MISCELLANEOUS↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

If power systems transition to integrate higher amounts of variable renewable energy sources, storage technologies, and distributed energy resources (DERs), new risk management frameworks are necessary to ensure cost-effective and reliable power system operations. Projects funded by the Advanced Research Projects Agency-Energy (ARPA-E) Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program aim to contribute new risk management frameworks by developing methods to quantify and manage risk at grid asset and system levels. The National Renewable Energy Laboratory (NREL) led a PERFORM project in collaboration with the Johns Hopkins University, the Electric Power Research Institute (EPRI), kWh Analytics, Packetized Energy, and Imperial Consultants (ICON). The project addressed two challenges related to risk management in electricity markets: managing net load imbalances and flexibility from DERs. This final technical report presents a list of project accomplishments, activities, and outputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grays River Watershed Restoration Status Report 2007, May 1, 2007 - October 30, 2008.

The Bonneville Power Administration (BPA) Project 2003-013-00, 'Grays River Watershed Restoration', began in FY04 and continues into FY09. This status report is intended to summarize accomplishments during the period 1 May 2007 through 30 October 2008. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). The Pacific Northwest National Laboratory (PNNL) is collaborating with the Columbia River Estuary Task Force (CREST) on implementation of the Grays River Restoration Project. The Grays River is vitally important to the recovery of Lower Columbia River (LCR) chum salmon because it currently has the most viable population remaining in the LCR region. The Grays River watershed is also important to the recovery of salmon and steelhead in the LCR ecosystem. Today, numbers of naturally spawning salmon and steelhead have declined to levels far below historical numbers because of habitat limiting factors that include but are not limited to the lack of habitat connectivity, diversity, channel stability, riparian function and altered stream flow conditions. The objective of this project is to restore habitat-forming processes to enhance salmon and steelhead populations in the Grays River, following recommendations developed during the FY04-06 BPA-sponsored Grays River Watershed Assessment (BPA Project No. 2003-013-00). Specifically, this project will be the first step in restoring channel structure and function that will increase instream habitat diversity, channel stability, and riparian integrity in the critical response reach upstream and adjacent to critical salmon spawning areas of the Grays River. The major component of this strategy is the planning, design, installation, and monitoring of engineered logjams (ELJ) that will rejuvenate historic channel and floodplain processes. Additional restoration measures include reforesting the riparian corridor to enhance future large woody debris recruitment and investigation of conservation activities within ecologically critical areas. These activities include land acquisition and levee removal to protect critical areas and reconnect floodplain areas. Finally, monitoring integrated with restoration activities is proposed to evaluate restoration effectiveness and allow for adaptive management of future restoration treatments in the project area as well as other degraded watersheds in the Lower Columbia River.

13 HYDRO ENERGY↗