Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Bayesian Tensor Decompositions for Scalable Supervised Learning of Scientific Data (Final Report)

In this document we highlight the detailed accomplishments and progress that we have made in this period. This progress seeks to address the three main objectives to provide new algorithms for quantifying uncertainty in low-multilinear-rank models and to leverage them for data analysis. These include: (1) develop probabilistic models for low-multilinear-rank functions; (2) develop a suite of Bayesian learning approaches to learn the probabilistic models from data; (3) apply the techniques on challenging problems arising in DOE-relevant applications.

97 MATHEMATICS AND COMPUTING↗

Overview of the DESI Legacy Imaging Surveys

The DESI Legacy Imaging Surveys (http://legacysurvey.org/) are a combination of three public projects (the Dark Energy Camera Legacy Survey, the Beijing–Arizona Sky Survey, and the Mayall z-band Legacy Survey) that will jointly image ≈14,000 deg{sup 2} of the extragalactic sky visible from the northern hemisphere in three optical bands (g, r, and z) using telescopes at the Kitt Peak National Observatory and the Cerro Tololo Inter-American Observatory. The combined survey footprint is split into two contiguous areas by the Galactic plane. The optical imaging is conducted using a unique strategy of dynamically adjusting the exposure times and pointing selection during observing that results in a survey of nearly uniform depth. In addition to calibrated images, the project is delivering a catalog, constructed by using a probabilistic inference-based approach to estimate source shapes and brightnesses. The catalog includes photometry from the grz optical bands and from four mid-infrared bands (at 3.4, 4.6, 12, and 22 μm) observed by the Wide-field Infrared Survey Explorer satellite during its full operational lifetime. The project plans two public data releases each year. All the software used to generate the catalogs is also released with the data. This paper provides an overview of the Legacy Surveys project.

79 ASTRONOMY AND ASTROPHYSICS↗

An Information Theory Approach on Deciding Spectroscopic Follow-ups

Classification and characterization of variable phenomena and transient phenomena are critical for astrophysics and cosmology. These objects are commonly studied using photometric time series or spectroscopic data. Given that many ongoing and future surveys are conducted in a time domain, and given that adding spectra provides further insights but requires more observational resources, it would be valuable to know which objects we should prioritize to have a spectrum in addition to a time series. We propose a methodology in a probabilistic setting that determines a priori which objects are worth taking a spectrum of to obtain better insights, where we focus on the insight of the type of the object (classification). Objects for which we query their spectrum are reclassified using their full spectral information. We first train two classifiers, one that uses photometric data and another that uses photometric and spectroscopic data together. Then for each photometric object we estimate the probability of each possible spectrum outcome. We combine these models in various probabilistic frameworks (strategies), which are used to guide the selection of follow-up observations. The best strategy depends on the intended use, whether it is obtaining more confidence or accuracy. For a given number of candidate objects (127, equal to 5% of the data set) for taking spectra, we improve the class prediction accuracy by 37% as opposed to 20% of a non-naive (non-random) best-baseline strategy. Our approach provides a general framework for follow-up strategies and can be extended beyond classification to include other forms of follow-ups beyond spectroscopy.

79 ASTRONOMY AND ASTROPHYSICS↗

Faint Object Detection in Multi-Epoch Observations via Catalog Data Fusion

Astronomy in the time-domain era faces several new challenges. One of them is the efficient use of observations obtained at multiple epochs. The work presented here addresses faint object detection and describes an incremental strategy for separating real objects from artifacts in ongoing surveys. The idea is to produce low-threshold single-epoch catalogs and to accumulate information across epochs. This is in contrast to more conventional strategies based on co-added or stacked images. We adopt a Bayesian approach, addressing object detection by calculating the marginal likelihoods for hypotheses asserting that there is no object or one object in a small image patch containing at most one cataloged source at each epoch. The object-present hypothesis interprets the sources in a patch at different epochs as arising from a genuine object; the no-object hypothesis interprets candidate sources as spurious, arising from noise peaks. We study the detection probability for constant-flux objects in a Gaussian noise setting, comparing results based on single and stacked exposures to results based on a series of single-epoch catalog summaries. Our procedure amounts to generalized cross-matching: it is the product of a factor accounting for the matching of the estimated fluxes of the candidate sources and a factor accounting for the matching of their estimated directions. We find that probabilistic fusion of multi-epoch catalogs can detect sources with similar sensitivity and selectivity compared to stacking. The probabilistic cross-matching framework underlying our approach plays an important role in maintaining detection sensitivity and points toward generalizations that could accommodate variability and complex object structure.

79 ASTRONOMY AND ASTROPHYSICS↗

An automated integrated web-based smart tool for open stope design

The Stability Graph is a widely used tool for the design of open stopes in underground mining. Many users of the Stability Graph still apply this design method manually. Although the manual approach has benefits, using multiple graphs and stability number computation charts for each stope surface is time-consuming, even for the experienced mining engineer. Current practice in the use of the method also limits data sharing. This paper presents a StopeSoft web-based tool for open stope stability prediction that is developed on the basis of the Stability Graph method and is available at openstope.com. StopeSoft incorporates flexibility in terms of Stability Graph options and incorporates additional critical factors often overlooked. As a web-based tool, StopeSoft encourages and makes data sharing possible globally, focused on expanding the database and improving the current limitations of the Stability Graph to provide practical, reliable solutions for mining engineers, consultants, and academics. The StopeSoft automated process facilitates the process of open stope stability prediction, saving time and minimizing potential human errors. Statistical treatment of the data accounts for the variability of input parameters to emphasize the probabilistic nature of the Stability Graph method. The probabilistic interpretation of the stability states of stope surfaces eliminates the false feeling of absolute stope performance based on its location on the Stability Graph , as implied by the deterministic approach.

58 GEOSCIENCES↗

IMPACT, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite as it nears its System Acceptance Review (SAR). It will review IMPACT’s constituent parts, briefly discuss typical outputs and outline the plans for transitioning to operations, currently scheduled for later in FY23. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedule.

IMPACT↗

IMPLEMENTING THE NFPA 805 PROCESS: Observations of a Technical Reviewer

In June 2004 the U.S. Nuclear Regulatory Commission (NRC) amended its fire protection requirements to permit existing nuclear power reactor licensees to voluntarily adopt fire protection requirements contained in National Fire Protection Association (NFPA) Standard 805. NFPA 805 is a performance-based standard for nuclear power plant fire protection that is an alternative to the deterministic, prescriptive fire protection requirements, such as 10 CFR 50 Appendix R, that was issued in 1980. One aspect of implementing NFPA 805 is that the licensee adopts the performance goals, objectives, and criteria for nuclear safety specified in the Standard. These goals, objectives, and criteria can be met through the implementation of deterministic approaches or performance-based approaches, including engineering analyses, probabilistic risk assessment, and fire modeling. Licensees voluntarily adopting the fire protection requirements in NFPA 805 must submit a license amendment request (LAR) to the NRC. The LAR provides the new proposed fire protection licensing basis, including the methodology and results of required evaluations and analyses that show how the NFPA 805 performance criteria are met. As of August 2014, licensees have submitted LARs for 26 nuclear power plants, representing 42 nuclear reactor units. Of these, 7 nuclear power plants, representing 10 nuclear reactor units, have been issued a safety evaluation (SE) by the NRC approving transition of their fire protection licensing basis to one that complies with NFPA 805. Pacific Northwest National Laboratory (PNNL) supports the NRC staff’s technical review of the LARs in the areas of fundamental fire protection, safe shutdown analysis, and Probabilistic Risk Assessment (PRA). PNNL, of course, cannot speak for the nuclear industry and its choice of implementation strategies or the NRC staff’s assessment of the approaches being taken to adopt NFPA 805. However, as a reviewer of the technical details of these submittals, PNNL is in a position to observe the array of implementation tactics taken in these submittals, and observe different ways licensees are making the NFPA 805 process work. For example, we see differences in how fire areas are being transitioned, the kinds of plant modifications being implemented, the changes being made to plant procedures, the number and types of recovery actions being credited, and the kinds and extent of detailed modeling being performed in support of the Fire PRAs. As a caveat, we note that it is probably too early to comment on the overall success or limitations of the NFPA 805 process or provide lessons learned for the future. Furthermore, it is not our intention to endorse any particular approach taken in a submittal over another or to critique the industry or the regulator. Rather our goal in this paper is to summarize a set of interesting and useful differences across submittals that may provide context for further future discussions about what we (i.e., reviewers, industry, and regulators) have learned in being part of the NFPA process; and how to best use that information to inform future NFPA 805 activities or other risk-informed endeavors.

NFPA 805, PRA, PSA, probabilistic risk assessment,↗

Safety design approach for external events in Japan sodium-cooled fast reactor

This paper describes a safety design approach for external events in the design study of Japan sodium-cooled fast reactor. An emphasis is introduction of a design extension external condition (DEEC). In addition to seismic design, other external events such as tsunami, strong wind, abnormal temperature, etc. were addressed in this study. From a wide variety of external events consisting of natural hazards and human-induced ones, a screening method was developed in terms of siting, consequence, frequency to select representative events. Design approaches for these events were categorized on the probabilistic, statistical and deterministic basis. External hazard conditions were considered mainly for DEECs. In the probabilistic approach, the DEECs of earthquake, tsunami and strong wind were defined as 1/10 of exceedance probability of the external design bases. The other representative DEECs were also defined based on statistical or deterministic approaches. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Exploration of high-dimensional scalar function for nuclear reactor safety analysis and visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user's guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving data from a nuclear reactor safety simulation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving Site-Specific Radiological Performance Assessments - 13431

An improved approach is presented for conducting complete and defensible radiological site-specific performance assessments (PAs) to support radioactive waste disposal decisions. The basic tenets of PA were initiated some thirty years ago, focusing on geologic disposals and evaluating compliance with regulations. Some of these regulations were inherently probabilistic (i.e., addressing uncertainty in a quantitative fashion), such as the containment requirements of the U.S. Environmental Protection Agency's (EPA's) 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes, Chap. 191.13 [1]. Methods of analysis were developed to meet those requirements, but at their core early PAs used 'conservative' parameter values and modeling approaches. This limited the utility of such PAs to compliance evaluation, and did little to inform decisions about optimizing disposal, closure and long-term monitoring and maintenance, or, in general, maintaining doses 'as low as reasonably achievable' (ALARA). This basic approach to PA development in the United States was employed essentially unchanged through the end of the 20. century, principally by the U.S. Department of Energy (DOE). Performance assessments developed in support of private radioactive waste disposal operations, regulated by the U.S. Nuclear Regulatory Commission (NRC) and its agreement states, were typically not as sophisticated. Discussion of new approaches to PA is timely, since at the time of this writing, the DOE is in the midst of revising its Order 435.1, Radioactive Waste Management [2], and the NRC is revising 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste [3]. Over the previous decade, theoretical developments and improved computational technology have provided the foundation for integrating decision analysis (DA) concepts and objective-focused thinking, plus a Bayesian approach to probabilistic modeling and risk analysis, to guide improvements in PA. This decision-making approach, [4, 5, 6] provides a transparent formal framework for using a value- or objective-focused approach to decision-making. DA, as an analytical means to implement structured decision making, provides a context for both understanding how uncertainty affects decisions and for targeting uncertainty reduction. The proposed DA approach improves defensibility and transparency of decision-making. The DA approach is fully consistent with the need to perform realistic modeling (rather than conservative modeling), including evaluation of site-specific factors. Instead of using generic stylized scenarios for radionuclide fate and transport and for human exposures to radionuclides, site-specific scenarios better represent the advantages and disadvantages of alternative disposal sites or engineered designs, thus clarifying their differences as well as providing a sound basis for evaluation of site performance. The full DA approach to PA is described, from explicitly incorporating societal values through stakeholder involvement to model building. Model building involves scoping by considering features, events, processes, and exposure scenarios (FEPSs), development of a conceptual site model (CSM), translation into numerical models and subsequent computation, and model evaluation. These are implemented in a cycle of uncertainty analysis, sensitivity analysis and value of information analysis so that uncertainty can be reduced until sufficient confidence is gained in the decisions to be made. This includes the traditional focus on hydrogeological processes, but also places emphasis on other FEPSs such as biotically-induced transport and human exposure phenomena. The significance of human exposure scenarios is emphasized by modifying the traditional acronym 'FEPs' to include them, hence 'FEPSs'. The radioactive waste community is also recognizing that disposal sites are to be considered a national (or even global) resource. As such, there is a pressing need to optimize their utility within the constraints of protecting human health and the environment. Failing to do so will result in the need for additional sites or options for storing radioactive waste temporarily, assuming a continued need for radioactive waste disposal. Optimization should be performed using DA, including economic analysis, invoked if necessary through the ALARA process. The economic analysis must recognize the cost of implementation (disposal design, closure, maintenance, etc.), and intra- and inter-generational equity in order to ensure that the best possible radioactive waste management decisions are made for the protection of both current and future generations. In most cases this requires consideration of population or collective risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decision Analyses Related to Groundwater Remediation - 17051

Traditional decision analyses of groundwater remediation scenarios frequently fail because the probability of adverse, unanticipated events occurring is often high. This is driven by many factors including that (1) the models developed to represent the flow and transport in contaminated aquifers are typically simpler than reality and do not account for all the important governing processes, (2) probability distributions are assigned to critical performance parameters (such as model inputs or characteristics of the engineered remediation systems) even though some of these parameters might be unknown or not be very well constrained. However, there is a novel decision analysis methodology and a computational tool based on Bayesian Information-Gap Decision Theory (BIG-DT) that are designed to mitigate the shortcomings of the models and probabilistic decision analyses by leveraging a non-probabilistic decision theory -- information-gap decision theory. The new decision analysis methodology considers possible models that have not been explicitly enumerated and does not require us to commit to a particular probability distribution for model and remediation-design parameters. Both the set of possible models and the set of possible probability distributions grow as the degree of uncertainty increases. The fundamental question that BIG-DT asks is 'How large can these sets be before a particular decision results in an undesirable outcome?'. The decision that allows these sets to be the largest is considered to be the best option. In this way, BIG-DT enables robust decision-support for groundwater remediation problems. Here, we apply BIG-DT to a representative groundwater remediation scenario where different options for hydraulic containment and pump and treat are being considered. BIG-DT requires many model runs and high-performance computing resources are needed when complex models are used. We demonstrate the BIG-DT analyses on a series of synthetic problems that are designed to be consistent with real-world problems such as Los Alamos National Laboratory (LANL) contamination sites. We also discuss a general framework for how the BIG-DT analyses will be carried out at the chromium groundwater contamination site at LANL. BIG-DT is implemented in Julia (a high-level, high-performance dynamic programming language for technical computing) and is part of the MADS framework (http://mads.lanl.gov and http://madsjulia.github.io/Mads.jl). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decision and Modeling Strategy for a Radiological Risk Assessment at Area G, Los Alamos, New Mexico - 17258

The U.S. Department of Energy (DOE) owns a low-level radioactive waste (LLW) disposal site at Material Disposal Area G, in Los Alamos, New Mexico, USA. Area G has been the primary LLW disposal site for Los Alamos National Laboratory (LANL) since the 1960's, and is now approaching the end of its service life. In addition to LLW, Area G is host to a variety of other wastes, the disposition of which must be determined before closure of the site. A probabilistic Radiological Risk Assessment (RRA) for Area G is used in order to support decision making regarding some wastes that are not addressed in the extant Area G Performance Assessment (PA) and Composite Analysis (CA). Between 1979 and 1987, 33 special shafts were augered into the Bandelier Tuff at Area G. This tuff is present across Pajarito Plateau on the eastern slopes of the Jemez Mountains, and varies widely in its consistency, from weakly indurated non-welded layers to welded layers that uphold the mesa cliffs of the Plateau. These mesas are home to LANL, Area G, and the town of Los Alamos. The 33 Shafts were lined with steel casing, and contain remote-handled (RH) transuranic wastes (TRU) resulting from experiments and analysis performed in special glove boxes at the Chemistry and Metallurgy Research (CMR) facility at LANL. Some of these wastes originated as used ('spent') nuclear fuel. The purpose of the Area G RRA is to evaluate the potential future risk to humans and the environment from the RH TRU in the 33 Shafts in the context of the risk associated with the surrounding wastes at Area G. The analysis is responsive to expectations outlined in DOE Order 458.1, Radiation Protection of the Public and the Environment, and is informed by the Manual and Guidance accompanying DOE O 435.1, Radioactive Waste Management. Because the waste meets the definition of TRU, the regulatory context also takes into consideration the regulation governing the disposal of TRU from the U.S. Environmental Protection Agency (EPA): 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Given the broader regulatory context for the RRA, the analysis is subject to different assumptions from those made in the existing DOE O 435.1 PA and CA, such as allowing for future occupation of the site. The analysis begins with a comprehensive evaluation of features, events, processes, and exposure scenarios (FEPS) for Area G and the wastes it contains. These FEPS are screened to eliminate from further consideration those of extremely low probability and/or consequence, and a conceptual site model (CSM) is subsequently developed. The scope and structure of the Area G RRA Model is informed by this CSM, and the Area G RRA Model is developed using the GoldSim systems analysis modeling platform. This paper outlines the development of a defensible, transparent, and reasonably realistic model, which is based on the state of knowledge of the wastes, the site, and the FEPS that govern contaminant transport and human exposures. Probabilistic model input distributions represent uncertainties inherent in the real and modeled systems. The results of the Area G RRA Model will inform decision analysis regarding the disposition of the RH TRU in the 33 Shafts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Longevity of geo-synthetic cover components - 15450

Geo-synthetics form many of the key components in modern landfill cell and final cover designs. Models for the long-term performance assessment of systems incorporating these components have traditionally relied on a small number of standard assumptions originally developed to address the needs of the Resource Conservation and Recovery Act (RCRA) Subtitle D solid waste industry. These past estimates demonstrated that, even under a series of highly conservative factors, the longevity of these components far exceeds the requirements for typical solid waste facilities. Traditionally, the interpretation of the geo-synthetic degradation research has been deterministic as opposed to probabilistic, often due to the relative scarcity of degradation data for particular formulations and environmental conditions. Long-term studies of the mechanical and chemical properties of geo-synthetics subjected to accelerated aging processes have been conducted in an attempt to better quantify their longevity to address applications where performance may be required for 1,000 years or more. Of the many cover system geo-synthetic components, geo-membranes appear to have the most significant impact on the long-term performance of cover systems. Based on available long-term aging studies, a series of property degradation curves and their corresponding model parameters are available for geo-membranes. A strong area of need in the performance assessment of shallow disposal facilities is how to connect these research findings with inputs to probabilistic models. Significantly, factors affecting geo-membrane performance, such as geo-membrane thickness, anti-oxidant package, molecular weight, oxygen exposure, and drainage, can be adjusted and re-engineered using a proposed approach to meet specific performance targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ZEM: Integrated Framework for Real-Time Data and Model Analyses for Robust Environmental Management Decision Making - 16438

Typically environmental management (EM) problems require analysis of large and complex data sets originating from concurrent data streams with different data collection frequencies and pedigree. These big data sets require on-the-fly analysis, assimilation and integration into a series of models with different complexity for various types of model-based analyses. This is needed to provide fast iterative model analyses based on the latest available data to guide decision-making. Furthermore, the data and model are associated with uncertainties. The uncertainties are probabilistic (e.g. measurement errors) and non-probabilistic (unknowns, e.g. alternative conceptual models characterizing site conditions). To address all of these issues, we have developed an integrated framework for real-time data and model analyses for environmental decision-making called ZEM. The framework allows for seamless and on-the-fly integration of data and modeling results for robust and scientifically-defensible decision-making applying advanced decision analyses tools such as Bayesian-Information-Gap Decision Theory (BIG-DT). The framework also includes advanced methods for optimization that are capable of dealing with a large number of unknown model parameters, and surrogate (reduced order) modeling capabilities based on support vector regression techniques. The framework is predominantly coded in Julia, a state-of-the-art high-performance programing language (http://julialang.org) and incorporates the MADS computational tools (Model Analysis and Decision Support; http://mads.lanl.gov). We demonstrate the application of ZEM for data and model analyses at the LANL Chromium site. The ZEM framework will be released as open-source code and can be applied to any environmental management site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Self-Navigating Robotic Assistant for Long-term Wide Area Floor Contamination Monitoring - 18213

For Routine Contamination Testing (RCT) of an operational nuclear facility or one undergoing Decontamination and Decommissioning (D and D), workers utilize specified travel corridors (enclosed hallways or areas designated with tape or rope in open spaces) to minimize the risk of spreading contamination. Radiation health technicians must continually monitor these areas for contamination to minimize worker dose and prevent its spread to uncontrolled areas. For many sites, it is impractical for the technician to adequately survey such areas. The Nuclear Robotics Group (NRG) at UT Austin has developed a self-navigating robotic platform equipped with radiation detectors to augment the technician to improve both survey coverage and frequency. While maintaining a controlled velocity and floor-to-sensor distance, the system takes radiation measurements to identify and/or localize contamination sources. Readings above background levels are reported to a remote workstation to allow technicians to then respond accordingly. The completion of these mundane tasks by a robot allows the trained technicians to focus instead on operational tasks, D and D, or responding to alarms. The robot generates a map using a Lidar range sensor with established Simultaneous Localization and Mapping (SLAM) techniques. Range data is then compared to previously generated maps for robot localization and autonomous navigation. To maximize coverage, the robot executes a Complete Coverage Path Planning (CCPP) algorithm using a static map that is discretized into cells to assure comprehensive yet efficient coverage. As the system executes the generated plan, it builds a radiation map of the area for the technician to validate and verify the results. If contamination is detected, the robot will minimize the spread of contamination by stopping, sounding an alarm, and alerting the remote technician. The proposed system allows for long-term deployment with minimal human intervention. It is robust to both highly dynamic obstacles (i.e. personnel) and low dynamic changes (i.e. temporally stored cart) in the environment. This is accomplished through continuous spatiotemporal updating of the static map, and the utilization of a supervisory controller that allows the system to reliably respond to unexpected events or states (i.e. low battery, closed door, etc.). While the supervisory controller can respond to temporary complications, the system also recognizes the environment can change slowly over time necessitating that the CCPP automatically be updated to account for observed 'permanent' changes to the environment. To do this, the robot uses intermediate probabilistic data to make intelligent planning decisions offline while still maintaining local reactive obstacle avoidance and safety features. The self-updating of the map allows the robot to run longer without the need to remake the map, leading to more consistent monitoring data and less maintenance from the human technician. This paper will review the current system hardware, the CCPP algorithm, the supervisory controller, the probabilistic algorithm for identifying permanent changes, and recent experiments at UT Austin to experimentally validate the reported sensor coverage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Capturing the 'Representative Person' Using Exposure Equations and Input Variable Distributions - 18416

Radiological performance assessments (PAs) for radioactive waste employ the concept of future human receptors, or persons potentially exposed to radiation releases. The International Commission on Radiological Protection (ICRP) has defined the 'representative person' as a receptor, to replace the earlier concept of an 'average member of the critical group', for use in individual dose assessments and comparisons to regulatory criteria. A representative person can be assessed in PAs by defining a critical group, which is a relatively highly exposed subpopulation; and then estimating average exposures, doses, and risks for that group. Probabilistic PA models employ probability distributions to characterize uncertainty in exposure characteristics/variables at a scale aligned with contaminant transport and other aspects of the PA model. The concept of a representative person from a critical group, in the context of the first stage of an iterative approach and a probabilistic PA model, is illustrated using a receptor scenario and a set of exposure equations that incorporate probability distributions for input variables. Different scenarios may require different equations and distributions, but the approach taken is broadly generalizable. PA practitioners and regulators may benefit from such a generalizable method, as it may simplify approaches as well as facilitate reviews and comparisons between different PAs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grizzly: A Multi-scale and Multi-Physics Tool to Model Aging of Nuclear Power Plant Components

Grizzly is a multi-scale multi-physics tool being developed at Idaho National Laboratory (INL) as part of the US Department of Energy's Light Water Reactor Sustainability program to provide improved safety assessments of systems, components, and structures in nuclear power plants subjected to age-related degradation. Its goal is to provide an improved scientific basis for decisions surrounding license renewal, which would permit operation of commercial nuclear power plants beyond 60 years. Grizzly is based on INL's MOOSE framework, which enables multi-physics simulations in a massively parallel computing environment. The reactor pressure vessel (RPV) has been chosen as the initial application for Grizzly. The primary concern for the RPV is that it becomes increasingly susceptible to fracture initiation at the sites of pre-existing flaws over time. This is because exposure to irradiation and high temperatures embrittles the steel. Assessing the safety of an RPV under transient conditions involves simulations at multiple scales. At the engineering scale, strongly coupled equations of heat conduction and solid mechanics are solved to simulate the global response of the RPV to accident conditions. Sub-models are used to represent regions with pre-existing flaws and the stress intensity factors are evaluated from the domain integrals. Crack propagation is then determined using a model that provides the temperature and neutron fluence dependent fracture toughness of the RPV steel. The ability of Grizzly to provide accurate engineering scale estimates of RPV safety beyond 60 years of operation strongly relies on the predictability of the embrittlement model. Multiple models for embrittlement have been proposed, and the physically based empirical model is implemented in Grizzly. However, the formation of late blooming phases greatly reduces the confidence on the extrapolated values obtained from embrittlement model, which is further exacerbated by the absence of real field data for validation. Experimentally validated lower length scale models can significantly improve the predictability of the embrittlement model beyond the calibrated range and the development of such models is another ongoing effort in Grizzly. The modeling activity in Grizzly spans across different length scales, and can be divided into: (i) Irradiation induced microstructure evolution at the atomistic and single crystal length scale using molecular dynamics, atomistic kinetic Monte-Carlo, phase-field and rate theory; (ii) Effect of the irradiation induced defects on the flow stress and fracture processes at the polycrystalline scale using crystal plasticity. Subsequently, the prediction from these models can be used to obtain irradiation induced ductile-to-brittle transition temperature (DBTT) shifts from specimen-scale simulations; (iii) Global thermo-mechanical response of the RPV under normal and accident scenarios, and probabilistic risk analyses at the engineering scale using the DBTT shifts obtained from the lower length scale models. The item (i) has been discussed in a previous report. In this extended abstract an overview of items (ii) and (iii) is provided. The extended abstract summarizes the current status of the modeling effort under Grizzly. At the engineering scale, reduced order model development is underway using the statistical tool RAVEN. This will allow probabilistic analysis considering a wide range of flaw topologies in a computationally efficient manner. Coupling the irradiation induced defect growth predictions to crystal plasticity is also in progress. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗