Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

MCNP6 and SERPENT2 Performances with Unstructured Mesh Geometry

Traditionally, Monte Carlo codes model a nuclear reactor by combinatorial geometry. In this model, volume primitives (e,g, spheres, cylinders, parallelepipeds...) are combined together by Boolean operations (e.g. union, intersection, and complement) and replicated by lattice definitions to build the core geometry. Recently, high performances computing platforms allowed using unstructured mesh geometry in Monte Carlo codes. When this option is chosen, any type of core geometry can be modeled since the restriction of using volume primitives is removed. In an unstructured mesh geometry, Boolean operations and lattice definitions are not used since each volume is defined by triangular surfaces (facets). This study focuses on two Monte Carlo codes: MCNP (version 6.1.1 beta) developed at Los Alamos National Laboratory since 1957 and written in FORTRAN90, C, and C++ (267,000 total source code lines), and SERPENT (version 2.1.27) developed at VTT Technical Research Centre since 2004 and written in C (195,000 total source code lines). These two codes follow different approaches for the unstructured mesh geometry modeling: MCNP uses ABAQUS format, whereas SERPENT uses the STL format. In the STL (STereoLithographic) geometry model only the surfaces of the volume are meshed; the interior part of the volumes is not meshed. In the STL geometry model, the whole geometry is defined by the sequence of SOLID and ENDSOLID sections. Each volume of the geometry must have a SOLID and ENDSOLID section. The STL file contains no information specifying the materials of the volumes. MCNP and SERPENT can model any kind of complicated geometry using unstructured meshes. MCNP and SERPENT use the ABAQUS and STL file formats, respectively. The STL file format does not have tetrahedrons and has only triangular facets on the volumes boundary. This allows SERPENT simulations to run 10 times faster than MCNP. However, if Monte Carlo results have to be coupled to thermal-hydraulics codes, the interior of the geometry volumes must be meshed, which may reduce SERPENT performances.

97 MATHEMATICS AND COMPUTING↗

Update on Demolition Strategy and Progress at Hanford's Plutonium Finishing Plant - 17161

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently demolishing the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. In November 2016, the project team, partnering with DOE-Richland Operations Office (DOE-RL) began demolition of the building. CH2M and DOE-RL will demolish PFP as a Hazardous Category II nuclear facility (HazCat II). The PFP is considered one of the most hazardous buildings on the Hanford site; employees have performed some of the most hazardous work anywhere across the DOE Environmental Management complex. Since 2008, employees have removed much of the plutonium-processing infrastructure. Four main buildings make up the majority of the PFP complex. As of November 2016, one building is undergoing demolition, another is ready for demolition and, concurrently, demolition preparations continue in the remaining two buildings. That hazard mitigation work includes removing contaminated ventilation duct work, process lines and performing asbestos abatement. To ensure safe and compliant demolition, CH2M employees researched, trained and deployed personal protective equipment never before used on the Hanford Site to complete some of the most hazardous demolition preparations. Project management commissioned the development of an air dispersion model that dictated ready-for-demolition criteria and established conservative demolition parameters. Management also sequenced project work to allow demolition to occur while demolition preparations continue a safe distance away in adjacent buildings. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Code interoperability extends the scope of quantum simulations

The functionality of many materials is critically dependent on the integration of dissimilar components and on the interfaces that arise between them. The description of such heterogeneous components requires the development and deployment of first principles methods, coupled to appropriate dynamical descriptions of matter and advanced sampling techniques, in order to capture all the relevant length and time scales of importance to the materials’ performance. It is thus essential to build simple, streamlined computational schemes for the prediction and design of multiple properties of broad classes of materials, by developing interoperable codes which can be efficiently coupled to each other to perform complex tasks. We discuss the use of interoperable codes to simulate the structural and spectroscopic characterization of materials, including chemical reactions for catalysis, the description of defects for quantum information science, and heat and charge transport.

36 MATERIALS SCIENCE↗

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. The Test Cell C (TCC) Facility is located in Area 25 of the Nevada Test Site (NTS) approximately 25 miles northwest of Mercury, Nevada (Figure 1). CAU 116 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) of 1996 (as amended February 2008) and consists of two Corrective Action Sites (CASs): (1) CAS 25-23-20, Nuclear Furnace Piping; and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 is described in the FFACO as the TCC Facility but actually includes Building 3210 and attached concrete shield wall only. CAU 116 will be closed by demolishing Building 3210, the attached concrete shield wall, and the nuclear furnace piping. In addition, as a best management practice (BMP), Building 3211 (moveable shed) will be demolished due to its close proximity to Building 3210. This will aid in demolition and disposal operations. Radiological surveys will be performed on the demolition debris to determine the proper disposal pathway. As much of the demolition debris as space allows will be placed into the Building 3210 basement structure. After filling to capacity with demolition debris, the basement structure will be mounded or capped and closed with administrative controls. Prior to beginning demolition activities and according to an approved Sampling and Analysis Plan (SAP), representative sampling of surface areas that are known, suspected, or have the potential to contain hazardous constituents such as lead or polychlorinated biphenyls (PCBs) will be performed throughout all buildings and structures. Sections 2.3.2, 4.2.2.2, 4.2.2.3, 4.3, and 6.2.6.1 address the methodologies employed that assure the solid debris placed in the basement structure will not contain contaminants of concern (COCs) above hazardous waste levels. The anticipated post-closure-posting requirements for the mounded/capped basement structure, as well as for the entire CAU, are addressed in Section 4.2.10. The site contains radiologically impacted surfaces and hazardous materials. Based on review of the historical information for CAU 116 and recent site inspections, there is sufficient process knowledge to close CAU 116 using the SAFER process. CAUs that may be closed using the SAFER process have conceptual corrective actions that are clearly identified. Consequently, corrective action alternatives can be chosen prior to completing a corrective action investigation, given anticipated investigation results. The SAFER process combines elements of the data quality objective (DQO) process and the observational approach to plan and conduct closure activities. The DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the SAFER process. The purpose of the investigation phase is to verify the adequacy of existing information used to determine the chosen corrective action. The observational approach provides a framework for managing uncertainty during the planning and decision-making phases of the project. The SAFER process allows for technical decisions to be made based on information gathered during site visits, interviews, meetings, research, and a consensus of opinion by the decontamination and decommissioning (D&D) team members. Any uncertainties are addressed by documented assumptions that are verified by sampling and analysis, data evaluation, onsite observations, and contingency plans, as necessary. Closure activities may proceed simultaneously with site characterization as sufficient data are gathered to confirm or disprove the assumptions made during selection of the corrective action. If, at any time during the closure process, new information is discovered that indicates that closure activities should be revised, closure activities will be reevaluated as appropriate. Based on a detailed review of historical documentation, there is sufficient process knowledge to close CAU 116 using the SAFER process. The COC have been determined and are discussed in Section 4.1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Emergency Diesel Generator Reliability on Microgrids and Building-Tied Systems

Microgrids are an emerging alternative as an energy backup system for critical electric loads and have improved performance compared to the traditional architecture where a single emergency diesel generator is tied to an individual building. Both architectures are dependent on the reliability of their individual generators and a quantitative and realistic comparison of the overall system reliability of the two architectures is lacking. Using recently published work on emergency diesel generator finite reliability, a quantitative methodology is presented to compare the reliability of a microgrid architecture based on centralized emergency diesel generators to the traditional approach of generators tied to individual buildings. Three system reliability performance metrics are calculated as a function of outage duration: (1) probability to meet 100% of the critical load; (2) expected fraction of lost load; and (3) probability to meet the highest priority critical loads. It is shown that stand-alone building-tied emergency diesel generators systems, even when two emergency diesel generators are used per building, cannot provide the reliability required to sustain critical loads for a grid outage lasting multiple days. Due to their network configuration and ability to share load, diesel generator-based microgrid configurations are estimated to have = 93% probability of powering all buildings for a 2-week outage there the individual building-tied emergency diesel generator architecture has a =20% probability. Microgrids do present other susceptibilities that are site specific and should be considered including vulnerabilities associated with the on-campus distribution system and cybersecurity.

backup power↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency Investments in Public Facilities - Developing a Pilot Mechanism for Energy Performance Contracts (EPCs) in Russia

: Russian public sector buildings tend to be very inefficient, which creates vast opportunities for savings. This report overviews the latest developments in the Russian legislation related to energy efficiency in the public sector, describes the major challenges the regulations pose, and proposes ways to overcome these challenges. Given Russia’s limited experience with energy performance contracts (EPCs), a pilot project can help test an implementation mechanism. This paper discusses how EPCs and other mechanisms can help harness energy savings opportunities in Russia in general, and thus, can be applicable to any Russian region.

Evans, Meredydd↗

Moisture and Structural Analysis for High Performance Hybrid Wall Assemblies

Based on past experience in the Building America program, BSC has found that combinations of materials and approaches—in other words, systems—usually provide optimum performance. Integration is necessary, as described in this research project. The hybrid walls analyzed utilize a combination of exterior insulation, diagonal metal strapping, and spray polyurethane foam and leave room for cavity-fill insulation. These systems can provide effective thermal, air, moisture, and water barrier systems in one assembly and provide structure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exploring Cloud Computing for Large-scale Scientific Applications

This paper explores cloud computing for large-scale data-intensive scientific applications. Cloud computing is attractive because it provides hardware and software resources on-demand, which relieves the burden of acquiring and maintaining a huge amount of resources that may be used only once by a scientific application. However, unlike typical commercial applications that often just requires a moderate amount of ordinary resources, large-scale scientific applications often need to process enormous amount of data in the terabyte or even petabyte range and require special high performance hardware with low latency connections to complete computation in a reasonable amount of time. To address these challenges, we build an infrastructure that can dynamically select high performance computing hardware across institutions and dynamically adapt the computation to the selected resources to achieve high performance. We have also demonstrated the effectiveness of our infrastructure by building a system biology application and an uncertainty quantification application for carbon sequestration, which can efficiently utilize data and computation resources across several institutions.

Lin, Guang↗

Automatic Building Feature Extraction Toolkit (AutoBFE) v1.0

In recent years advances in the performance of machine learning methods have considerably improved the ability to accurately extract information from images. Identification of building characteristics from imagery is an example of an application that is time consuming and costly to perform manually, and where automatic feature extraction holds great promise. A major contribution of the work conducted in this project is the provision of open, transparent, and replicable solutions for buildings features extraction from images (e.g., satellite/aerial images). In this first version of the toolkit we are focussing on extracting building footprints from satellite/aerial images using state of the art deep learning image segmentation algorithms.

Touzani, Samir↗

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technology Solutions Case Study: Air-To-Water Heat Pumps with Radiant Delivery in Low Load Homes, Tucson, Arizona and Chico, California

Space conditioning represents nearly 50% of average residential household energy consumption, highlighting the need to identify alternative cost-effective, energy-efficient cooling and heating strategies. As homes are better built, there is an increasing need for strategies that are particularly well suited for high performance, low load homes. ARBI researchers worked with two test homes in hot-dry climates to evaluate the in-situ performance of air-to-water heat pump (AWHP) systems, an energy efficient space conditioning solution designed to cost-effectively provide comfort in homes with efficient, safe, and durable operation. Both systems were fully instrumented and have been monitored over one year to capture complete performance data over the cooling and heating seasons. Results are used to quantify energy savings, cost-effectiveness, and system performance using different operating modes and strategies. This strategy is most effective in tight, insulated homes with high levels of thermal mass (i.e. exposed slab floors).

air conditioning↗

Analysis of Aurora's Performance Simulation Engine for Three Systems

Aurora Solar Inc. is building a cloud-based optimization platform to automate the design, engineering, and permit generation process of solar photovoltaic (PV) installations. They requested that the National Renewable Energy Laboratory (NREL) validate the performance of the PV system performance simulation engine of Aurora Solar’s solar design platform, Aurora. In previous work, NREL performed a validation of multiple other PV modeling tools 1, so this study builds upon that work by examining all of the same fixed-tilt systems with available module datasheets that NREL selected and used in the aforementioned study. Aurora Solar set up these three operating PV systems in their modeling platform using NREL-provided system specifications and concurrent weather data. NREL then verified the setup of these systems, ran the simulations, and compared the Aurora-predicted performance data to measured performance data for those three systems, as well as to performance data predicted by other PV modeling tools.

14 SOLAR ENERGY↗

High‐Performance Low‐Emissivity Paints Enabled by N‐Doped Poly(benzodifurandione) (n‐PBDF) for Energy‐Efficient Buildings

Abstract Low‐emissivity (low‐e) paints reduce radiative heat exchange between buildings and the environment, stabilizing indoor climates and lowering air conditioning demand. However, low‐cost, durable, and colored low‐e paints have yet to be demonstrated. Here, an approach is proposed using n‐doped poly(benzodifurandione) (n‐PBDF), a transparent organic conducting polymer, coated over colored commercial paints. This achieves a low thermal emissivity of 0.19 in the mid‐infrared spectrum, attributed to the efficient charge transport of delocalized π‐electrons in n‐PBDF structure. The reduction in thermal emissivity aids in regulating building temperatures by minimizing heat transfer between buildings and their surroundings across diverse climate zones and seasons. The n‐PBDF coating preserves the underlying paint's color due to its high visible transparency, meeting aesthetic requirements. It also shows strong stability in accelerated indoor weathering tests, ensuring long‐term performance. Simulations estimate annual HVAC energy savings of over 10,800 kWh in San Francisco and 5,500 kWh in Chicago for the typical mid‐rise apartments. The paint's versatility, scalability, and durability make it suitable for buildings, vehicles, and greenhouses, aiding urban heat island mitigation.

Liu, Xiaojie [School of Mechanical Engineering and↗

Potential benefits of cool walls on residential and commercial buildings across California and the United States: Conserving energy, saving money, and reducing emission of greenhouse gases and air pollutants

Solar-reflective “cool” walls reduce absorption of sunlight by the building envelope, which may decrease cooling load in warm weather and increase heating load in cool weather. Changes to annual heating, ventilation, and air conditioning (HVAC) energy use depend on climate, wall construction, wall orientation, building geometry, HVAC efficiency, and operating schedule. Changes to annual energy cost and energy-related emissions further vary with local energy prices and emission factors. In this work, we used EnergyPlus to perform over 100,000 whole-building energy simulations, spanning 10 different building categories, three building vintages, 16 California climate zones, and 15 United States (U.S.) climate zones. We find that cool walls yielded annual source energy, energy cost, and emission savings in all California climate zones and in warm U.S. (ASHRAE) climate zones. In California, annual whole-building HVAC energy cost savings were 4.0–27% in single-family homes, 0.5–3.8% in medium office buildings, and 0.0–8.5% in stand-alone retail stores. In warm U.S. climates—zones 1A (Miami, FL) through 4B (Albuquerque, NM)—annual HVAC energy cost savings were 1.8–8.3% in single-family homes, 0.3–4.6% in medium office buildings, and 0.5–11% in stand-alone retail stores. California and U.S. fractional source energy and emission savings were comparable to fractional energy cost savings. Per unit surface area modified, cool-wall savings often exceeded cool-roof savings because building codes typically prescribe much less wall insulation than roof insulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Energy Retrofit Guide: Practical Ways to Improve Energy Performance, K-12 Schools (Book)

The U.S. Department of Energy developed the Advanced Energy Retrofit Guides (AERGs) to provide specific methodologies, information, and guidance to help energy managers and other stakeholders plan and execute energy efficiency improvements. Detailed technical discussion is fairly limited. Instead, we emphasize actionable information, practical methodologies, diverse case studies, and unbiased evaluations of the most promising retrofit energy efficiency measures for each building type. A series of AERGs is under development, addressing key segments of the commercial building stock. K-12 schools were selected as one of the highest priority building sectors, because schools affect the lives of most Americans. They also represent approximately 8% of the energy use and 10% of the floor area in commercial buildings nationwide. U.S. K-12 school districts spend more than $8 billion each year on energy - more than they spend on computers and textbooks combined. Most occupy older buildings that often have poor operational performance - more than 30% of schools were built before 1960. The average age of a school is about 42 years - which is nearly the expected serviceable lifespan of the building. K-12 schools offer unique opportunities for deep, cost-effective energy efficiency improvements, and this guide provides convenient and practical guidance for exploiting these opportunities in the context of public, private, and parochial schools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Engineering monitoring expert system's developer

This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.

Lo, Ching F.↗