Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Communication Platform Payload Definition (CPPD) study. Volume 2: Technical report

This is Volume 2 (Technical Report) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

Hunter, E. M.↗

Scientific and technical papers presented or published by JSC authors in 1985

The Lyndon B. Johnson Space Center contributions to the scientific and technical literature in aerospace and life sciences made during calendar year 1985 are described. Citations include NASA formal series reports, journal articles, conference and symposium presentations, papers published in proceedings or other collective works, and seminar and workshop results.

Source record↗

Guidelines for improving illustrated technical talks

The steps in planning, preparing, and presenting a high-quality illustrated technical talk are presented. Related factors such as audience consideration, defining objectives, storyboarding, developing a written text, rehearsal, final editing, and delivery are covered. Suggestions are made for improving clarity, for achieving proper emphasis, and for easily assimilating information. Detailed considerations for reducing the complexity of visual aids are provided.

Pinelli, T. E.↗

Toward the development of guidelines for technical report preparation

American National Standards Institute (ANSI) standard Z39.18, 'Guidelines for Format and Production of Scientific and Technical Reports', is undergoing revision. Background describing the standard's evolution is presented as is the strategy used for undertaking the revision. The issues central to revising the standard are presented along with an explanation of how each issue will be handled. Related research and literature relevant to the standard's revision are included.

Pinelli, T. E.↗

Technical progress in silicon sheet growth under DOE/JPL FSA program, 1975-1986

The technical progress made in the Silicon Sheet Growth Program during its 11 years was reviewed. At present, in 1986, only two of the original 9 techniques have survived to the start-up, pilot-plant stage in industry. These two techniques are the edge-defined, film-fed growth (EFG) technique that produces closed shape polygons, and the WEB dendritic technique that produces single ribbons. Both the status and future concerns of the EFG and WEB techniques were discussed.

Kalejs, J. P.↗

Advanced space communications architecture study. Volume 2: Technical report

The technical feasibility and economic viability of satellite system architectures that are suitable for customer premise service (CPS) communications are investigated. System evaluation is performed at 30/20 GHz (Ka-band); however, the system architectures examined are equally applicable to 14/11 GHz (Ku-band). Emphasis is placed on systems that permit low-cost user terminals. Frequency division multiple access (FDMA) is used on the uplink, with typically 10,000 simultaneous accesses per satellite, each of 64 kbps. Bulk demodulators onboard the satellite, in combination with a baseband multiplexer, convert the many narrowband uplink signals into a small number of wideband data streams for downlink transmission. Single-hop network interconnectivity is accomplished via downlink scanning beams. Each satellite is estimated to weigh 5600 lb and consume 6850W of power; the corresponding payload totals are 1000 lb and 5000 W. Nonrecurring satellite cost is estimated at $110 million, with the first-unit cost at $113 million. In large quantities, the user terminal cost estimate is $25,000. For an assumed traffic profile, the required system revenue has been computed as a function of the internal rate of return (IRR) on invested capital. The equivalent user charge per-minute of 64-kbps channel service has also been determined.

Horstein, Michael↗

Technical background for a demonstration magnetic levitation system

A preliminary technical assessment of the feasibility of a demonstration Magnetic Levitation system, required to support aerodynamic models with a specified clear air volume around them, is presented. Preliminary calculations of required sizes of electromagnets and power supplies are made, indicating that the system is practical. Other aspects, including model position sensing and controller design, are briefly addressed.

Britcher, Colin P.↗

Scientific and technical papers presented or published by JSC authors in 1986

A compilation of Lyndon B. Johnson Space Center contributions to the scientific and technical literature in aerospace and life sciences made during calender year 1985 is presented. Citations include NASA formal series reports, journal articles, conference and symposium presentations, papers published in proceedings or other collective works, and seminar and workshop results.

Source record↗

Programmatic and technical parameters associated with Shuttle/Centaur development and operations

The cost, schedule, technical, integration, and performance parameters associated with the development of the Shuttle/Centaur configurations, Centaur G and Centaur G-Prime, for compatibility with various elements of the STS are discussed. It is noted that the design concepts for these configurations involved the use of as much flight-proven hardware from the Atlas/Centaur program as possible. Forward and aft adapters were designed using graphite/epoxy composite structures for strength, weight, and thermal flow considerations. The Centaur integrated support system serves as the system interface for all systems between the Shuttle and Centaur from prelaunch through deployment of the Centaur in LEO. As a result of the Shuttle accident of January 28, 1986, the earliest possible flight for the Centaur mission appears to be December 1987.

Clark, Harry J.↗

Technical and Management Information System (TMIS)

The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

Rau, Timothy R.↗

Lidar windshear detection and avoidance: Performance and technical assessment

The objective of this study is to evaluate competing lidars for use in an airborne forward-looking system to enable aircraft to avoid the hazards of low altitude wind shear. Information is presented in vugraph form on lidar general requirements, tentative technical requirements, comparison of velocity errors and signal to noise ratios in clear weather for 2.1 and 10.6 micron lidars, a wind shear display, and preliminary results.

Targ, Russell↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

MSAT-X: A technical introduction and status report

A technical introduction and status report for the Mobile Satellite Experiment (MSAT-X) program is presented. The concepts of a Mobile Satellite System (MSS) and its unique challenges are introduced. MSAT-X's role and objectives are delineated with focus on its achievements. An outline of MSS design philosophy is followed by a presentation and analysis of the MSAT-X results, which are cast in a broader context of an MSS. The current phase of MSAT-X has focused notably on the ground segment of MSS. The accomplishments in the four critical technology areas of vehicle antennas, modem and mobile terminal design, speech coding, and networking are presented. A concise evolutionary trace is incorporated in each area to elucidate the rationale leading to the current design choices. The findings in the area of propagation channel modeling are also summarized and their impact on system design discussed. To facilitate the assessment of the MSAT-X results, technology and subsystem recommendations are also included and integrated with a quantitative first-generation MSS design.

Dessouky, Khaled↗

[NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 1, part 2:] Technical communications in aeronautics: Results of an exploratory study

A study was undertaken that explored several aspects of technical communications in aeronautics. The study, which utilized survey research in the form of a self-administered questionnaire, was sent to 2,000 randomly selected members of the American Institute of Aeronautics and Astronautics. Six hundred and six usable questionnaires (30.3 percent) were received by the established cut off date. Part 2 of this study lists appendices to part 1, including survey instrument, aggregate totals, cross tabulations, and open-ended comments.

Pinelli, Thomas E.↗