Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TRACKING STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

NASA Conjunction Assessment Risk Analysis (CARA) Ground Systems, Software and Operations Infrastructure Cloud Implementation

The growing number of large-scale constellations and the improvements made in the tracking and detection of resident space objects have contributed to the increase of satellite conjunction events. As a result of the increase of objects in Earth orbit, the timeline for risk analysis computations for satellite collision avoidance is more urgent when conjunctions occur. It is imperative NASA maintains a space environment safety functionality for the agency that allows CARA remote access to the ground system while maintaining redundancy. CARA’s On-premises (On-prem) ground system would no longer be able to meet these access and redundancy requirements, hence the investigation and eventual implementation of a Cloud-based ground station infrastructure as a viable solution. This paper will provide an overview of the principal parts of the Conjunction Assessment (CA) risk analysis process used at CARA, summarize the key drivers towards the Cloud solution, and share key lessons learned that are significant for any operational entity considering a cloud solution for real-time satellite operations to ensure a sustainable space traffic environment for all.

Sustainability↗

Evaluation of Lower East Fork Poplar Creek Mercury Sources

This report summarizes a 3-year research project undertaken to better understand the nature and magnitude of mercury (Hg) fluxes in East Fork Poplar Creek (EFPC). This project addresses the requirements of Action Plan 1 in the 2011 Oak Ridge Reservation-wide Comprehensive Environmental Response, Compensation, and Liability Act Five Year Review (FYR). The Action Plan is designed to address a twofold 2011 FYR issue: (1) new information suggests mobilization of mercury from the upper and lower EFPC streambeds and stream banks is the primary source of mercury export during high-flow conditions, and (2) the current Record of Decision did not address the entire hydrologic system and creek bank or creek bed sediments. To obtain a more robust watershed-scale understanding of mercury sources and processes in lower EFPC (LEFPC), new field and laboratory studies were coupled with existing data from multiple US Department of Energy programs to develop a dynamic watershed and bioaccumulation model. LEFPC field studies for the project focused primarily on quantification of streambank erosion and an evaluation of mercury dynamics in shallow groundwater adjacent to LEFPC and potential connection to the surface water. The approach to the stream bank study was innovative in using imagery from kayak floats’ surveys from the headwaters to the mouth of EFPC to estimate erosion, coupled with detailed bank soil mercury analyses. The goal of new field assessments and modeling was to generate a more holistic and quantitative understanding of the watershed and the sources, flux, concentration, transformation, and bioaccumulation of inorganic mercury (IHg) and methylmercury (MeHg). Model development used a hybrid approach that dynamically linked a spreadsheet-based physical and chemical watershed model to a systems dynamics, mercury bioaccumulation model for key fish species. The watershed model tracks total Hg and MeHg fluxes and concentrations by examining upstream inputs, floodplain runoff, floodplain leaching, bank soil erosion, and periphyton matrix dynamics. The bioaccumulation model tracks the feeding, growth, and mercury assimilation of representative individual fish through their typical life span using key inputs of fish size, water temperature, and diet. The LEFPC watershed was divided into five modeling reaches, and fluxes and concentrations are assessed at this spatial scale. Following are the key findings of the field and laboratory studies and the watershed and bioaccumulation modeling: • The greatest flux of total mercury (HgT) in LEFPC is related to stormflow transport of Hg-contaminated solids entering the creek because of bank erosion in the upper reaches of the creek. • The second greatest flux originates from upper EFPC (Station 17 representing the exit stream sampling point near the boundary of the Y-12 Complex), and appears to control base flow fluxes. • The observed increase in MeHg concentration and flux from upstream to downstream is related primarily to instream methylation by periphyton and other biological activity. • A meaningful substantial reduction of the HgT flux in LEFPC would require addressing the flux of HgT originating from bank erosion and from Station 17. • Actions to reduce LEFPC floodplain leaching and runoff would not produce much of an impact on HgT or MeHg concentrations or fluxes unless other major sources are eliminated first. This project addresses the Action Plan goal to evaluate the role of LEFPC bank soil sources and to consider the entire EFPC hydrologic system. Model conclusions are dependent on the data available at the time of this assessment. However, a robust understanding and quantification for some mercury-related parameters and relationships is still lacking; there is a continued need for field data collection and modeling improvements. Model predictions should be viewed cautiously, with comparisons of the magnitude of predictions between scenarios being more valid than absolute predictions of concentrations or fluxes. With continued updates and refinement, the watershed-scale model can be a useful, valuable tool for future EFPC research prioritization, technology development, and remedial decision-making.

54 ENVIRONMENTAL SCIENCES↗

Large area emulsion chamber experiments for the Space Shuttle

Emulsion-chamber experiments employing nuclear-track emulsions, etchable plastic detectors, metal plates, and X-ray films continue to demonstrate high productivity and potential in the study of cosmic-ray primaries and their interactions. Emulsions, with unsurpassed track-recording capability, provide an appropriate medium for the study of nucleus-nucleus interactions at high energy, which will likely produce observations of a phase change in nuclear matter. The many advantages of emulsion chambers (excellent multitrack recording capability, large geometry factor, low apparatus cost, simplicity of design and construction) are complemented by the major advantages of the Space Shuttle as an experiment carrier. A Shuttle experiment which could make a significant advance in both cosmic-ray primary and nucleus-nucleus interaction studies is described. Such an experiment would serve as a guide for use of emulsions during the Space Station era. Some practical factors that must be considered in planning a Shuttle exposure of emulsion chambers are discussed.

Parnell, T. A.↗

One Dimensional Analysis Model of a Condensing Spray Chamber Including Rocket Exhaust Using SINDA/FLUINT and CEA

Modeling droplet condensation via CFD codes can be very tedious, time consuming, and inaccurate. CFD codes may be tedious and time consuming in terms of using Lagrangian particle tracking approaches or particle sizing bins. Also since many codes ignore conduction through the droplet and or the degradating effect of heat and mass transfer if noncondensible species are present, the solutions may be inaccurate. The modeling of a condensing spray chamber where the significant size of the water droplets and the time and distance these droplets take to fall, can make the effect of droplet conduction a physical factor that needs to be considered in the model. Furthermore the presence of even a relatively small amount of noncondensible has been shown to reduce the amount of condensation. It is desirable then to create a modeling tool that addresses these issues. The path taken to create such a tool is illustrated. The application of this tool and subsequent results are based on the spray chamber in the Spacecraft Propulsion Research Facility (B2) located at NASA's Plum Brook Station that tested an RL-10 engine. The platform upon which the condensation physics is modeled is SINDAFLUINT. The use of SINDAFLUINT enables the ability to model various aspects of the entire testing facility, including the rocket exhaust duct flow and heat transfer to the exhaust duct wall. The ejector pumping system of the spray chamber is also easily implemented via SINDAFLUINT. The goal is to create a transient one dimensional flow and heat transfer model beginning at the rocket, continuing through the condensing spray chamber, and finally ending with the ejector pumping system. However the model of the condensing spray chamber may be run independently of the rocket and ejector systems detail, with only appropriate mass flow boundary conditions placed at the entrance and exit of the condensing spray chamber model. The model of the condensing spray chamber takes into account droplet conduction as well as the degrading effect of mass and heat transfer due to the presence of noncondensibles. The one dimension model of the condensing spray chamber makes no presupposition on the pressure profile within the chamber, allowing the implemented droplet physics of heat and mass transfer coupled to the SINDAFLUINT solver to determine a transient pressure profile of the condensing spray chamber. Model results compare well to the RL-10 engine pressure test data.

Chemical Equilibrium↗

NASA Scout ST-1 Flight-Test Results and Analyses, Launch Operations, and Test Vehicle Description

The first of a series of flight tests for the development of the four-stage, solid-propellant Scout vehicle was conducted at the NASA Wallops Station under the direction of the Langley Research Center. Vehicle designation for the test was NASA Scout ST-1. Performance characteristics of the vehicle and components were recorded during a high-altitude probe mission. Flight-simulation studies are presented and show that the accuracy of the guidance system during the flight was within control-system design specifications. The control system functioned normally during the flight with the exception of an overpowering of the reaction-control roll jets near burnout of the third-stage rocket motor. The resulting roll displacement of the vehicle is shown to have caused the monitor tracking radar which had been erroneously tracking a radar beacon in the vehicle on a side lobe to reorient to the major lobe of the receiving antenna. This tracking switch falsely indicated a violent turning maneuver on the monitor plot board and resulted in a hold-fire decision for the fourth-stage rocket motor. Although data for the final thrusting and coast phase of the flight were not obtained, the majority of the test objectives were achieved. In-flight thrust misalignment angles for the second- and third-stage rocket motors derived from control-system error data and for the first-stage motor determined from flight-simulation studies are presented. All rocket-motor thrust misalignment angles were well within the tolerances used for control-system design. Rocket-motor flight performance is presented, and velocity increments attained from the first three stages substantiated the predicted nominal performance. Operation of the rocket motors was satisfactory with the exception of high-level vibrations which were encountered during third-stage motor burning. Rolling moments which overpowered the reaction-control jets are also attributed to the burning characteristics of the third-stage motor. A discussion of the premature loss of the third-stage heat shield is given and shows that the heat-shield latching mechanism failed from pressure loads as the vehicle entered the transonic speed range. Although venting was provided to relieve the high negative pressures known to exist on the heat shield at these speeds, a field modification of the wiring tunnel had the same effect as opening the inside of the heat shield to ambient pressures. Consequently, the latching mechanism failed from pressure loads which were of about the same magnitude as the latching-mechanism yield loads. Skin temperatures were recorded at several locations on the vehicle and were generally in good agreement with theoretical values. Aerodynamic heating presented no problem during the flight since the maximum temperatures recorded during the flight were only about half the design values because of the high-launch-angle trajectory. Environmental vibrations recorded in the vicinity of the guidance package showed that no significant continuous amplitude levels above the general instrumentation noise level were present during first- and second-stage burning. Large vibration amplitudes were recorded during third-stage burning which coincided with the large roll disturbance experienced by the vehicle near burnout of the third-stage motor.

Scout Launch Vehicle↗

Wallops Low Elevation Link Analysis for the Constellation Launch/Ascent Links

To execute the President's Vision for Space Exploration, the Constellation Program (CxP) was formed to build the next generation spacecraft Orion and launch vehicles Ares, to transport human and cargo to International Space Station (ISS), moon, and Mars. This paper focuses on the detailed link analysis for Orion/Ares s launch and ascent links with Wallops 11.3m antenna (1) Orion's Dissimilar Voice link: 10.24 Kbps, 2-way (2) Ares Developmental Flight Instrument link, 20 Mbps, downlink. Three launch trajectories are considered: TD7-E, F (Feb), and G (Aug). In certain launch scenarios, the critical events of main engine cutoff (MECO) and Separation occur during the low elevation regime of WFF s downrange -- less than 5 degree elevation angle. The goal of the study is to access if there is enough link margins for WFF to track the DV and DFI links.

Constellation↗

One Dimensional Analysis Model of a Condensing Spray Chamber Including Rocket Exhaust Using SINDA/FLUINT and CEA

Modeling droplet condensation via CFD codes can be very tedious, time consuming, and inaccurate. CFD codes may be tedious and time consuming in terms of using Lagrangian particle tracking approaches or particle sizing bins. Also since many codes ignore conduction through the droplet and or the degradating effect of heat and mass transfer if noncondensible species are present, the solutions may be inaccurate. The modeling of a condensing spray chamber where the significant size of the water droplets and the time and distance these droplets take to fall, can make the effect of droplet conduction a physical factor that needs to be considered in the model. Furthermore the presence of even a relatively small amount of noncondensible has been shown to reduce the amount of condensation [Ref 1]. It is desirable then to create a modeling tool that addresses these issues. The path taken to create such a tool is illustrated. The application of this tool and subsequent results are based on the spray chamber in the Spacecraft Propulsion Research Facility (B2) located at NASA's Plum Brook Station that tested an RL-10 engine. The platform upon which the condensation physics is modeled is SINDAFLUINT. The use of SINDAFLUINT enables the ability to model various aspects of the entire testing facility, including the rocket exhaust duct flow and heat transfer to the exhaust duct wall. The ejector pumping system of the spray chamber is also easily implemented via SINDAFLUINT. The goal is to create a transient one dimensional flow and heat transfer model beginning at the rocket, continuing through the condensing spray chamber, and finally ending with the ejector pumping system. However the model of the condensing spray chamber may be run independently of the rocket and ejector systems detail, with only appropriate mass flow boundary conditions placed at the entrance and exit of the condensing spray chamber model. The model of the condensing spray chamber takes into account droplet conduction as well as the degrading effect of mass and heat transfer due to the presence of noncondensibles. The one dimension model of the condensing spray chamber makes no presupposition on the pressure profile within the chamber, allowing the implemented droplet physics of heat and mass transfer coupled to the SINDAFLUINT solver to determine a transient pressure profile of the condensing spray chamber. Model results compare well to the RL-10 engine pressure test data.

Condensing Spray Model↗

Can the standard radiosonde system meet special atmospheric research needs

As a part of a rather comprehensive study of instrument reliability and error analysis, 21 balloon-borne dual radiosonde flights were launched and tracked with a precision C-band (FPS-16) radar as well as with the usual radiosonde tracking system. Radar provides an independent means for obtaining altitude data of order 10 meter accuracy. The 18 successful flights were investigated to determine repeatability of the pressure and temperature measurements. The obtained results show that the current aneroid pressure cell is the least repeatable member of the radiosonde's measurement components. Generally, the rms differences of the pressure measurements were found to be between 1 and 2 mbar throughout the altitude range of the instrument. Although these errors are large, they are not serious in the context of synoptic use. However, serious consideration must be given to these instrumental characteristics in connection with single station, nonsynoptic research objectives.

Schmidlin, F. J.↗

An autonomous rendezvous and docking system using cruise missile technologies

In November 1990 the Autonomous Rendezvous & Docking (AR&D) system was first demonstrated for members of NASA's Strategic Avionics Technology Working Group. This simulation utilized prototype hardware from the Cruise Missile and Advanced Centaur Avionics systems. The object was to show that all the accuracy, reliability and operational requirements established for a space craft to dock with Space Station Freedom could be met by the proposed system. The rapid prototyping capabilities of the Advanced Avionics Systems Development Laboratory were used to evaluate the proposed system in a real time, hardware in the loop simulation of the rendezvous and docking reference mission. The simulation permits manual, supervised automatic and fully autonomous operations to be evaluated. It is also being upgraded to be able to test an Autonomous Approach and Landing (AA&L) system. The AA&L and AR&D systems are very similar. Both use inertial guidance and control systems supplemented by GPS. Both use an Image Processing System (IPS), for target recognition and tracking. The IPS includes a general purpose multiprocessor computer and a selected suite of sensors that will provide the required relative position and orientation data. Graphic displays can also be generated by the computer, providing the astronaut / operator with real-time guidance and navigation data with enhanced video or sensor imagery.

Jones, Ruel Edwin↗

Climatological Study of the Short-Term Variation of the 0 C, -10 C, AND -20 C Altitude Levels Over the Florida Spaceport

For evaluation of the potential of cloud electrification, it is necessary to know the altitude of the 0, -10 and -20 degree Celsius levels. Cape Canaveral Air Force Station has recorded balloon launch data back to 1989. In support of rocket launches, often multiple balloons are launched within minutes of each other in the 4-6 hours leading up to launch. In the past, temperature data from sondes was typically available every hour or so through the launch countdown, allowing for frequent updates of these critical temperature thresholds. Recently, launch customers are relying on jimsphere and wind profiler data that do not have a thermodynamic component in the latter 4-6 hours of a countdown. This study compares the altitude differences of the 0, -10 and -20 degree Celsius levels from GPS-tracked consecutive balloon pairs not to exceed 6 hours apart. The analysis uses 3,198 soundings from 2001 to 2013. Approximately 20, 17, and 13 percent of the time the altitude of the temperature level in question (0, -10, -20 degrees C respectively), varies by more than 500 feet (operationally significant threshold) within 6 hours. This study analyzes the altitude variability as a function of several meteorological parameters, such as dew point depression and solar zenith angle. Additionally, the study concludes with impacts to launch operations.

altitude of 0 degree C temperature level↗

Southeast Greenland Winter Precipitation Strongly Linked to the Icelandic Low Position

Greenland's largest precipitation flux occurs in its southeast (SE) region during the winter, controlled primarily by easterly winds and frequent cyclogenesis in the North Atlantic. Several studies have attempted to link SE Greenland precipitation to the North Atlantic Oscillation (NAO) but results are inconsistent. This work uses reanalysis, automatic weather station data, and regional climate model output to show that the east-west position of the Icelandic low is a better predictor of SE Greenland precipitation (average correlation of r equals -0.48 in DJF (December January February)) than climate indices such as the NAO (r equals -0.06 in DJF). In years when the Icelandic low is positioned extremely west, moisture transport increases up to approximately 40 percent (or up to 40 kilograms per meter per second) off the SE Greenland coast compared to when the low is in an extreme east position. Furthermore, in years when the Icelandic low is positioned extremely west, storm track density and intensity increase just off the SE coast of Greenland. Thus, the Icelandic low's longitudinal position dominates SE Greenland ice sheet's wintertime precipitation, a positive term in the ice sheet mass balance. Given SE Greenland's importance in the overall ice sheet mass balance, the position of the Icelandic low is therefore important for making projections of future sea level.

Arctic↗

Evaluation of OMV ranging and docking systems

The Orbital Maneuvering Vehicle (OMV) will serve as a shuttle-based or permanent space station-based vehicle designed to rendezvous and soft dock with various other free-flying space vehicles for purposes of inspection, support, and retrieval. This study is concerned primarily with the eventual need for the OMV to rendezvous and dock softly with the Edwin P. Hubble Space Telescope (ST). Utilizing the available capabilities of the large microwave anechoic chamber facility at Marshall Space Flight Center for simulating docking target vehicle motions in a free-space environment, a program is being devised for benchmark testing of rendezvous and docking sensor systems proposed for use on the OMV. A testing regimen suitable for evaluating the accuracy and tracking agility in sensing range, range rate, and angle information at close ranges (0 R 30m) has been developed.

Mcdonald, M. W.↗

Preliminary control system design and analysis for the Space Station Furnace Facility thermal control system

This report presents the Space Station Furnace Facility (SSFF) thermal control system (TCS) preliminary control system design and analysis. The SSFF provides the necessary core systems to operate various materials processing furnaces. The TCS is defined as one of the core systems, and its function is to collect excess heat from furnaces and to provide precise cold temperature control of components and of certain furnace zones. Physical interconnection of parallel thermal control subsystems through a common pump implies the description of the TCS by coupled nonlinear differential equations in pressure and flow. This report formulates the system equations and develops the controllers that cause the interconnected subsystems to satisfy flow rate tracking requirements. Extensive digital simulation results are presented to show the flow rate tracking performance.

Jackson, M. E.↗

Lunar Navigation Architecture Design Considerations

The NASA Constellation Program is aiming to establish a long-term presence on the lunar surface. The Constellation elements (Orion, Altair, Earth Departure Stage, and Ares launch vehicles) will require a lunar navigation architecture for navigation state updates during lunar-class missions. Orion in particular has baselined earth-based ground direct tracking as the primary source for much of its absolute navigation needs. However, due to the uncertainty in the lunar navigation architecture, the Orion program has had to make certain assumptions on the capabilities of such architectures in order to adequately scale the vehicle design trade space. The following paper outlines lunar navigation requirements, the Orion program assumptions, and the impacts of these assumptions to the lunar navigation architecture design. The selection of potential sites was based upon geometric baselines, logistical feasibility, redundancy, and abort support capability. Simulated navigation covariances mapped to entry interface flightpath- angle uncertainties were used to evaluate knowledge errors. A minimum ground station architecture was identified consisting of Goldstone, Madrid, Canberra, Santiago, Hartebeeshoek, Dongora, Hawaii, Guam, and Ascension Island (or the geometric equivalent).

D'Souza, Christopher↗

Manual Crew Override of Vehicle Landings Following G-Transitions

BACKGROUND Manual control during exploration spaceflight consists of both planned automated supervisory control and unplanned crew override. This crew override capability is critical to enable overall mission success during landing contingencies. However, the introduction of manual override capabilities must be implemented to enable crews to mitigate risks introduced by human error. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. While training and landing aids enable successful landing through disorientation, these adaptive changes may increase cognitive demand that needs to be accounted for in the manual control strategy. It is important to characterize these effects as soon as possible following the G-transition to develop appropriate countermeasures. METHODS The following study seeks to inform the risk associated with altered sensorimotor and vestibular function impacting critical mission tasks. We aim to characterize the effects of short and long-duration weightlessness on manual control following G-transitions using simulated lunar landing on a six-degree-of-freedom (6DOF) motion base, a fixed base simulation, and a supervisory control tablet task. The primary goal is to understand the impact of spaceflight on crew ability to perform manual crew override and supervisory control. This aim will be assessed by comparing pre- versus postflight simulation performance in crewmembers assigned to either short duration (< 30 day) or long duration (~6- month) missions to the International Space Station (ISS). We hypothesize there will be postflight increases in the percent time that pilots are outside of the acceptable range for recommended vehicle state parameters and the reaction time for secondary cognitive tasks. Ground-based control subjects, who are demographically matched to the crew considering age (± 5 years) and gender, will undergo the same testing schedule as the crew to examine the effects of flight phase independent of microgravity exposure. The second aim is to examine how adaptive changes in vestibular and cognitive function relate to changes in manual crew override proficiency. Crew performance for a sensorimotor perceptual test battery will evaluate motion perception tracking, roll nulling, and/or vection sensitivity using the 6DOF motion base. We hypothesize that a higher severity of vestibular alterations will be associated with increased percent time outside of guidance limits. Motion sickness severity and sleepiness will also be evaluated. To determine the impact of “just-in-time” training, the third aim seeks to compare performance during on-board lunar landing tasks conducted late in-flight to early postflight. We hypothesize that proficiency on the “just-in-time” laptop trainer late in mission will be positively correlated with early postflight proficiency on the same task. The final aim will establish assessments of performance, training protocols, and the learning progression in a ground-control cohort of first-time users. RESULTS The assessment of the learning progression associated with the piloting task on the motion base system with thirty ground subjects will be reported. Learning curves will be established across four distinct sessions and within session considering trial difficulty. The difficulty of the landing task can be modulated with the landing divert distance and cross or downrange difficulty. Results may include changes in performance across multiple trials of a multi-attribute lunar tablet supervisory control task. Preliminary investigations of eighteen subjects who completed vestibular threshold and motion perception tasks offer expected performance ranges for upcoming preflight crew evaluations. The results yielded an average roll threshold of 0.46 ± 0.30 deg/s and an average roll nulling root mean square error performance of 2.52 ± 0.52 deg/s. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the manual control risks associated with sensorimotor alterations. Ground testing will evaluate learning progression, refine training protocols, and serve as a control cohort for comparisons to crew performance. ACKNOWLEDGEMENTS: The authors acknowledge contributions from Draper, the Dynamic Skills Trainer (DST) Lab, and the Software, Robotics, and Simulation Division toward the development of the lunar landing simulation platforms. This project is funded by the Human Health Countermeasures Element.

Hannah M. Weiss↗

GEM detectors for the CMS endcap muon system: status of three new detector stations

The High-Luminosity LHC (HL-LHC, or Phase-2 LHC) will deliver proton-proton collisions at 5–7.5 times the nominal LHC luminosity, with an expected number of 140–200 pp-interactions per bunch crossing (Pile-up or PU). To maintain the performance of muon triggering and reconstruction under high background, the forward part of the Muon Spectrometer of the CMS experiment will be upgraded with Gas Electron Multipliers (GEM) and improved Resistive Plate Chambers (iRPC) detectors. A first GEM station (GE1/1) was installed during Long Shutdown 2 (LS2, 2019–2021), a 2 nd station (GE2/1) of Triple-GEM detectors will be installed in winter 2023–24 and 2024–25, while a new 6-layer station (ME0) will be installed in the third Long Shutdown (LS3, 2026–2028). GE11 is considered an early Phase-2 upgrade as it will reduce the p T threshold by combining GEM and Cathode Strip Chamber (CSC) hits in the forward muon system at twice the LHC design luminosity ($\mathcal{L}$ = 2 · 10 34 cm -2 s -1 , 50 PU). After a successful start of Run-3 in 2022, with almost 40 fb -1 collected, the commissioning of the GE1/1 detector is nearly complete. Most chambers are operated stably with an efficiency in excess of 95%, next being the demonstration of the combined CSC-GEM trigger in 2023. The lessons learnt with the first large-area GEM station have lead to improvements in detector and electronics design for the Phase 2 detectors GE2/1 and ME0. This proceeding will discuss the progress made since last MPGD Conference (MPGD 2019), discussing the commissioning and early performance of GE1/1; the design improvements and start of construction of GE2/1; and the R&D currently ongoing for ME0.

47 OTHER INSTRUMENTATION↗

The advanced tracking and data relay satellite system - The next generation

NASA is currently performing cost and feasibility studies for the next generation of TDRSS spacecraft. These spacecraft are needed to replenish the current generation of spacecraft and will be available in the 1997 time frame. The next generation of NASA satellites will perform tracking and data relay functions well into the next century. The challenge facing NASA is to provide new services in an evolutionary way without disrupting services provided to current users. Furthermore, these new services must be carefully coordinated with other similar international data relay activities to facilitate efficient and cost effective operation and to avoid interference. This orderly evolution requires careful planning and coordination. This paper describes the reference architecture and the new services under consideration by NASA including data rates and selected frequencies of operation. The paper also describes the planned implementation schedule and defines the evolutionary process from the current TDRSS system through the Space Station Freedom era and the implementation of the Advanced TDRSS.

Brandel, Daniel↗

Charge, energy, and LET spectra measurements of charged particles in P0006 experiment of LDEF

Measurements are under way of the charged particle radiation environment of the LDEF satellite using stacks of plastic nuclear track detectors (PNTDs) placed in different locations of the satellite. In the initial work, the charge, energy, and linear energy transfer (LET) spectra of charged particles were measured with CR-39 double layer PNTDs located on the west end of the satellite. Primary and secondary stopping heavy ions as well as relativistic galactic cosmic rays (mostly iron particles) were measured separately. The results will be compared with similar measurements in other locations on LDEF with different orientation and shielding conditions. The remarkably detailed study of the charged particle radiation environment of the LDEF satellite will lead to a better understanding of the radiation environment of the Space Station Freedom. It will enable more accurate prediction of single event upsets (SEUs) in microelectronics and, especially, more accurate assessment of the risk, contributed by the different components of the radiation field to the health and safety of crew members.

Benton, E. V.↗