KSC Space Station Operations Language (SSOL)

The Space Station Operations Language (SSOL) will serve a large community of diverse users dealing with the integration and checkout of Space Station modules. Kennedy Space Center's plan to achieve Level A specification of the SSOL system, encompassing both its language and its automated support environment, is presented in the format of a briefing. The SSOL concept is a collection of fundamental elements that span languages, operating systems, software development, software tools and several user classes. The approach outlines a thorough process that combines the benefits of rapid prototyping with a coordinated requirements gathering effort, yielding a Level A specification of the SSOL requirements.

Source record↗

Use of Data Comm by Flight Crew to Conduct Interval Management Operations to Parallel Dependent Runways

The Interval Management (IM) concept is being developed as a method to maintain or increase high traffic density airport arrival throughput while allowing aircraft to conduct near idle thrust descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR1) experiment at NASA Langley Research Center used 24 commercial pilots to examine IM procedures to conduct parallel dependent runway arrival operations while maintaining safe but efficient intervals behind the preceding aircraft. The use of IM procedures during these operations requires a lengthy and complex clearance from Air Traffic Control (ATC) to the participating aircraft, thereby making the use of Controller Pilot Data Link Communications (CPDLC) highly desirable as the communication method. The use of CPDLC reduces the need for voice transmissions between controllers and flight crew, and enables automated transfer of IM clearance elements into flight management systems or other aircraft avionics. The result is reduced crew workload and an increase in the efficiency of crew procedures. This paper focuses on the subset of data collected related to the use of CPDLC for IM operations into a busy airport. Overall, the experiment and results were very successful, with the mean time under 43 seconds for the flight crew to load the clearance into the IM spacing tool, review the calculated speed, and respond to ATC. An overall mean rating of Moderately Agree was given when the crews were asked if the use of CPDLC was operationally acceptable as simulated in this experiment. Approximately half of the flight crew reported the use of CPDLC below 10,000 for IM operations was unacceptable, with 83% reporting below 5000 was unacceptable. Also described are proposed modifications to the IM operations that may reduce CPDLC Respond time to less than 30 seconds and should significantly reduce the complexity of crew procedures, as well as follow-on research issues for operational use of CPDLC during IM operations.

Baxley, Brian T.↗

Electronics for Deep Space Cryogenic Applications

Deep space probes and planetary exploration missions require electrical power management and control systems that are capable of efficient and reliable operation in very cold temperature environments. Typically, in deep space probes, heating elements are used to keep the spacecraft electronics near room temperature. The utilization of power electronics designed for and operated at low temperature will contribute to increasing efficiency and improving reliability of space power systems. At NASA Glenn Research Center, commercial-off-the-shelf devices as well as developed components are being investigated for potential use at low temperatures. These devices include semiconductor switching devices, magnetics, and capacitors. Integrated circuits such as digital-to-analog and analog-to-digital converters, DC/DC converters, operational amplifiers, and oscillators are also being evaluated. In this paper, results will be presented for selected analog-to-digital converters, oscillators, DC/DC converters, and pulse width modulation (PWM) controllers.

Patterson, R. L.↗

Updates on CCMC Activities and GSFC Space Weather Services

In this presentation, we provide updates on CCMC modeling activities, CCMC metrics and validation studies, and other CCMC efforts. In addition, an overview of GSFC Space Weather Services (a sibling organization to the Community Coordinated Modeling Center) and its products/capabilities will be given. We show how some of the research grade models, if running in an operational mode, can help address NASA's space weather needs by providing forecasting/now casting capabilities of significant space weather events throughout the solar system.

Zhengm Y.↗

RAPID: Collaboration Results from Three NASA Centers in Commanding/Monitoring Lunar Assets

Three NASA centers are working together to address the challenge of operating robotic assets in support of human exploration of the Moon. This paper describes the combined work to date of the Ames Research Center (ARC), Jet Propulsion Laboratory (JPL) and Johnson Space Center (JSC) on a common support framework to control and monitor lunar robotic assets. We discuss how we have addressed specific challenges including time-delayed operations, and geographically distributed collaborative monitoring and control, to build an effective architecture for integrating a heterogeneous collection of robotic assets into a common work. We describe the design of the Robot Application Programming Interface Delegate (RAPID) architecture that effectively addresses the problem of interfacing a family of robots including the JSC Chariot, ARC K-10 and JPL ATHLETE rovers. We report on lessons learned from the June 2008 field test in which RAPID was used to monitor and control all of these assets. We conclude by discussing some future directions to extend the RAPID architecture to add further support for NASA's lunar exploration program.

Torres, R. Jay↗

Operational training for the mission operations at the Brazilian National Institute for Space Research (INPE)

This paper describes the selection and training process of satellite controllers and data network operators performed at INPE's Satellite Tracking and Control Center in order to prepare them for the mission operations of the INPE's first (SCD1) satellite. An overview of the ground control system and SCD1 architecture and mission is given. Different training phases are described, taking into account that the applicants had no previous knowledge of space operations requiring, therefore, a training which started from the basics.

Rozenfeld, Pawel↗

The Concept Verification Testing of a materials science payload

The Concept Verification Testing (CVT) project at the Marshall Space Flight Center, Alabama is a developmental activity that supports Shuttle Payload projects such as Spacelab. It provides an operational one-g environment for testing NASA and other agency experiment and support systems concepts that may be used in Shuttle. A dedicated Materials Science Payload was tested in the General Purpose Laboratory (GPL) in December 1974 in order to assess the requirements of a Space Processing payload on a Spacelab type facility. Physical and functional integration of the experiments into the facility was studied, and the impact of the experiments on the facility (and vice versa) was evaluated. The Principal Investigators (PI) who had proposed experiments were onboard and in a consulting status on the ground. The significant results of the week-long simulation will be discussed.

Griner, C. S.↗

Space Launch System (SLS) Human Factors Engineering Modeling & Analysis

The Human Systems Integration & Engineering (HSI&E) team at NASA’s Marshall Space Flight Center (MSFC) strives to advocate for the humans in the loop of Space Launch System’s (SLS) ground operations. Using assessment methods like human simulation, virtual reality, and physical mockups, both flight hardware and ground support equipment (GSE) are evaluated for human integration. Those ranging from 5th percentile female (approximately 5’2” tall) to 95th percentile male (approximately 6’2” tall) should be able to perform all SLS stacking operations. Operations include element physical mates, element electrical mates, and testing activities. The primary human simulation software used is Process Simulate Human (PSH) made by Siemens. This software supplies highly accurate human manikins that can interact with CAD models. PSH was used to evaluate the Transportation and Integration Platform’s (TIP) side opening that was designed for access to the Payload Adapter (PLA) cables. Technicians will need to access these cables for testing purposes before element stacking at Kennedy Space Center (KSC). After performing an analysis in PSH using the TIP side opening, it was found that neither a 5th percentile female or a 95th percentile male could perform the task as the designers had intended. There is a C-beam that blocks access to the cables (both physically and visually). An alternative analysis was performed using PSH to look at another access point to the PLA cables. Although this method would disrupt already established procedures and produce more work, the designers confirmed it was an option. Instead of technicians accessing the cables through the side opening in the TIP, a human simulation was performed for going through a panel opening in the bottom of the TIP. This method requires removal of a TIP panel and a stepladder of at least 36 inches for a 5th percentile female to access the cables.

human factors↗

Robotic control and inspection verification

Three areas of possible commercialization involving robots at the Kennedy Space Center (KSC) are discussed: a six degree-of-freedom target tracking system for remote umbilical operations; an intelligent torque sensing end effector for operating hand valves in hazardous locations; and an automatic radiator inspection device, a 13 by 65 foot robotic mechanism involving completely redundant motors, drives, and controls. Aspects concerning the first two innovations can be integrated to enable robots or teleoperators to perform tasks involving orientation and panal actuation operations that can be done with existing technology rather than waiting for telerobots to incorporate artificial intelligence (AI) to perform 'smart' autonomous operations. The third robot involves the application of complete control hardware redundancy to enable performance of work over and near expensive Space Shuttle hardware. The consumer marketplace may wish to explore commercialization of similiar component redundancy techniques for applications when a robot would not normally be used because of reliability concerns.

Davis, Virgil Leon↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

Safety in the operating theatre--part 1: interpersonal relationships and team performance

The authors examine the application of interpersonal human factors training on operating room (OR) personnel. Mortality studies of OR deaths and critical incident studies of anesthesia are examined to determine the role of human error in OR incidents. Theoretical models of system vulnerability to accidents are presented with emphasis on a systems approach to OR performance. Input, process, and outcome factors are discussed in detail.

Non-NASA Center↗

Lunar laser ranging data deposited in the National Space Science Data Center: Filtered observations for 1971 July through 1971 December and unfiltered photon detections for 1972 January through 1972 June

Documentation to be used in conjunction with data deposited in the National Space Science Data Center is presented which concerns the filtered observations obtained during laser ranging operations between the McDonald Observatory and the Apollo 11, 14, and 15 reflectors, and the unfiltered photon detections. As part of the Lunar Laser Ranging Experiment, three widely separated reflector arrays were placed on the moon. Laser ranging equipment, both ground based on lunar based, is described, and coordinates of the intersection of the polar and transverse axes of the telescope are given. Filtered and unfiltered data are defined and discussed.

Mulholland, J. D.↗

Real time solar magnetograph Skylab mission Atlas

An atlas of all magnetic field observations made during the Skylab missions with the Real Time Solar Magnetograph system located at the Marshall Space Flight Center is presented. Also included are a description of the system and its operation; an outline of the data reductions performed; and a discussion of probable errors, noise, magnetic sensitivity, and system reliability.

Hagyard, M. J.↗

Cryogenic recovery

Because of the low boiling temperature of cryogenic propellants to be used on the Space Shuttle, loss of cryogens from boiloff could become very costly. This paper describes how this shuttle problem is being solved at Kennedy Space Center. Cryogenic losses are categorized relative to the particular cryogenic involved, the Space Shuttle servicing operation causing boiloff and the magnitude of the loss. The techniques under consideration are discussed in detail. These techniques include reclaiming the boiloff by reliquefaction, upgrading the reclaimed boiloff by purification, and interim boiloff storage in metal hydride prior to reprocessing. One of the reliquefaction processes discussed in detail utilizes the cooling effect of venting some of the liquid hydrogen boiloff to provide a simple hydrogen reliquefaction unit. Possible future applications of these cryogenics recovery techniques to industry and transportation systems using liquid hydrogen for energy storage and fuel are also discussed.

Howard, F. S.↗

ESTL tracking and data relay satellite /TDRSS/ simulation system

The Tracking Data Relay Satellite System (TDRSS) provides single access forward and return communication links with the Shuttle/Orbiter via S-band and Ku-band frequency bands. The ESTL (Electronic Systems Test Laboratory) at Lyndon B. Johnson Space Center (JSC) utilizes a TDRS satellite simulator and critical TDRS ground hardware for test operations. To accomplish Orbiter/TDRSS relay communications performance testing in the ESTL, a satellite simulator was developed which met the specification requirements of the TDRSS channels utilized by the Orbiter. Actual TDRSS ground hardware unique to the Orbiter communication interfaces was procured from individual vendors, integrated in the ESTL, and interfaced via a data bus for control and status monitoring. This paper discusses the satellite simulation hardware in terms of early development and subsequent modifications. The TDRS ground hardware configuration and the complex computer interface requirements are reviewed. Also, special test hardware such as a radio frequency interference test generator is discussed.

Kapell, M. H.↗

Uprated OMS engine status and future applications

The baseline Orbital Maneuvering Engine (OME) of the Space Shuttle has the potential for significant performance uprating, leading to increased Shuttle performance capability. The approach to uprating that is being pursued at the NASA Lyndon B. Johnson Space Center is the use of a gas generator-driven turbopump to increase OME operating pressure. A higher pressure engine can have a greater nozzle expansion ratio in the same envelope and at the same thrust level, giving increased engine Isp. The results of trade studies and analyses that have led to the preferred uprated OME configuration are described. The significant accomplishments of a pre-development component demonstration program are also presented, including descriptions of test hardware and discussion of test results. It is shown that testing to date confirms the capability of the preferred uprated OME configuration to meet or exceed performance and life requirements. Potential future activities leading up to a full-scale development program are described, and the capability for the uprated OME to be used in future storable propellant upper stages is discussed.

Boyd, W. C.↗

Automated matching of pairs of SIR-B images for elevation mapping

During the SIR-B mission in October 1984, a significant number of overlapping synthetic aperture radar (SAR) images of various ground areas was collected. This has offered the first opportunity to perform stereo analyses on images from space that cover large ground areas to determine elevation information. This paper presents the preliminary results of an investigation to obtain elevation data from stereo pairs of SIR-B images. First, the accuracy with which elevation information can be derived from SIR-B image pairs is evaluated theoretically. It is shown that elevation accuracy is a function of the slant range resolution, the incidence angles with which the stereo pair is obtained, the accuracies in spacecraft state estimation, and determination of corresponding pixels in the stereo pair. Next, a hierarchical method is developed to match the corresponding pixels. This method involves iterative removal of local distortions and correlations of pairs of local neighborhoods in the two images. Since it is necessary to perform the matching at every pixel in the image, it is very computationally intensive. Therefore, it has been implemented on the Massively Parallel Processor (MPP) at the Goddard Space Flight Center (GSFC). The MPP's speed permits two iterations of this technique to operate on a pair of 512 x 512 images within 7 s. Results of applying this algorithm of SIR-B images of Mount Shasta, CA, are shown. The matching algorithm performs well in regions of the image with significant features. An approximate elevation image derived from the matching process corresponds to published topographic map data, except for certain obvious discontinuities.

Ramapriyan, H. K.↗