Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reliability analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Applicability of the “Gallet equation” to the vegetation clearances of NERC Reliability Standard FAC-003-2

NERC has proposed a standard to use to specify clearances between vegetation and power lines. The purpose of the rule is to reduce the probability of flashover to a calculably low level. This report was commissioned by FERC’s Office of Electrical Reliability. The scope of the study was analysis of the mathematics and documentation of the technical justification behind the application of the Gallet equation and the assumptions used in the technical reference paper.

clearances↗

Chefornak Energy Configuration Options: Energy Infrastructure Optimization to Reduce Fuel Cost and Dependence in Chefornak, Alaska

The U.S. Department of Energy is funding, through the Grid Modernization Program, the Alaska Microgrid Partnership (AMP), a multi-stakeholder collaborative comprised of national labs and Alaska based partners. The over-arching goal of AMP is to reduce the use of total imported fuel into communities to secure all energy services by at least 50% in Alaska's remote microgrids without increasing system lifecycle costs, while improving overall system reliability, security, and resilience. One goal of AMP is to investigate if a combination of Energy Efficiency (EE) and high contribution (from Renewable Energy (RE)) power systems can reduce total imported energy usage by 50% while lowering Life Cycle Costs (LCC) and improving reliability and resiliency. A techno-economic analysis was conducted for the community of Chefornak to investigate system architectures that could meet the goal of reducing imported fuel consumption by 50% or more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

October 2019 SAPHIRE 8 Software Quality Assurance Oversight Status Report

The software quality assurance oversight consists of updating and maintaining revision control of the System Analysis Program for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE Version 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, Significance Determination Process (SDP) Interface Training Manual, and the SAPHIRE 8 “New Features and Capabilities Overview.” These documents are referred to and can be transmitted upon request of the Nuclear Regulatory Commission (NRC) Contracting Officer’s Representative (COR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost and Performance Analysis for Five Existing Geothermal Heat Pump-Based District Energy Systems in the United States

District energy systems supplied by geothermal heat pumps (GHPs) have been deployed across the United States for both heating and cooling end uses. To better understand their performance and potential, the geothermal research team at the National Renewable Energy Laboratory analyzed cost and performance of five existing GHP-based district energy systems in the United States. The five systems selected are Ball State University in Indiana, Colorado Mesa University in Colorado, Miami University in Ohio, West Union in Iowa, and Whisper Valley in Texas. The necessary information, including district size, operation period, GHP performance, and costs, was collected through literature review and interviews. The survey results indicated the five systems studied consist of geothermal borehole field(s) and ground loop(s) connected to central loop. While the GHPs were in central plants at Ball State University and Miami University, the central loops at Colorado Mesa University, West Wood, and Whisper Valley were connected through service lines to individual heat pumps in each building. Our analysis indicates the systems have been operating reliably and cost-effectively and contributed to a reduction in carbon emissions.

15 GEOTHERMAL ENERGY↗

Information Signals in Automatic Production Control Systems

Attention focuses on the functional relations between the information signals processed in automatic production control systems, with a view to constructing a monitoring system for network interactions that is able to detect abnormal operation. The parameters of information signals, types of functional relations, and methods of determining such relations by statistical analysis are described. The sample size for reliable determination of the basic relations between the information signals is estimated.

42 ENGINEERING↗

NERVA nozzle design status report

The results of the design analyses are presented along with the status of the attained design maturity of the structural elements of the nozzle jacket and various aspects of the coolant passages. The design analyses relating to the nozzle shell were based on design allowables as supported by cursory values obtained from ARMCO 22-13-5 nozzle forgings. The major aspects of the coolant passages considered include: low cycle thermal fatigue, ability to operate at 4500 R gas temperature, tube buckling, and susceptibility to erosion. The scope of the analysis is limited to processes leading to reliability assessments of failure mechanisms.

Williams, J. J.↗

Isotope Brayton electric power system for the 500 to 2500 watt range.

An extensive study was conducted at the Lewis Research Center to evaluate an isotope Brayton electric power system for use in the 500 to 2500 W power range. The study emphasized overall system simplicity in order to reduce parasitic power losses and improve system reliability. The study included detailed parametric cycle analysis, conceptual component designs, and evaluation of system packaging. The study has resulted in the selection of a single-loop system (gas) with six major components including one rotating unit. Calculated net system efficiency varies from 23 to 28% over the power range. The use of the Pu-238 heat source being developed for the Multi-Hundred-Watt Radioisotope Thermoelectric Generator program was assumed.

Macosko, R. P.↗

The applicability of frame imaging from a spinning spacecraft. Volume 1: Summary report

A detailed study was made of frame-type imaging systems for use on board a spin stabilized spacecraft for outer planets applications. All types of frame imagers capable of performing this mission were considered, regardless of the current state of the art. Detailed sensor models of these systems were developed at the component level and used in the subsequent analyses. An overall assessment was then made of the various systems based upon results of a worst-case performance analysis, foreseeable technology problems, and the relative reliability and radiation tolerance of the systems. Special attention was directed at restraints imposed by image motion and the limited data transmission and storage capability of the spacecraft. Based upon this overall assessment, the most promising systems were selected and then examined in detail for a specified Jupiter orbiter mission. The relative merits of each selected system were then analyzed, and the system design characteristics were demonstrated using preliminary configurations, block diagrams, and tables of estimated weights, volumes and power consumption.

Botticelli, R. A.↗

Statistical analysis

A discussion is presented on the use of statistical analysis to develop a technique that will reliably predict the life of a battery.

Mains, D.↗

Orbital Transfer Vehicle (OTV) engine study. Phase A: Extension

An orbital transfer vehicle OTV engine study program was undertaken to provide additional expander and staged combustion cycle data in the design definition of the OTV engine. The proposed program effort optimizes the expander cycle engine concept (consistent with identified OTV engine requirements), investigates the feasibility of kitting the staged combustion cycle engine to provide extended low thrust operation, and conducts in-depth analysis of development risk, crew safety, and reliability for both cycles. Additional tasks to establish the cost of a 10K thrust expander cycle engine and to render support of OTV systems study contractors are reported.

Sobin, A. J.↗

Orbital Transfer Vehicle (OTV) engine study phase A, extension

The current Phase A-Extension of the OTV engine study program seeks to provide additional expander and staged combustion cycle data that will lead to design definition of the OTV engine. The proposed program effort will optimize the expander cycle engine concept (consistent with identified OTV engine requirements), investigate the feasibility of kitting the stage combustion cycle engine to provide extended low thrust operation, and conduct in-depth analysis of development risk, crew safety, and reliability for both cycles. Additional task will address costing of a 10k thrust expander cycle engine and support of OTV systems study contractors.

Sobin, A. J.↗

Orbital Transfer Vehicle (OTV) engine study. Phase A: Extension

The current Phase A-Extension of the OTV engine study program aims to provide additional expander and staged combustion cycle data that will lead to design definition of the OTV engine. The proposed program effort seeks to optimize the expander cycle engine concept (consistent with identified OTV engine requirements), investigate the feasibility of kitting the staged combustion cycle engine to provide extended thrust operation, and conduct in-depth analysis of development risk, crew safety, and reliability for both cycles. Additional tasks address the costing of a 10/K thrust expander cycle engine and support of OTV systems study contractors.

Sobin, A. J.↗

Photovoltaic module and array reliability

Several statistical reliability studies have been conducted in areas of photovoltaic component design covering cell failure, interconnect fatigue, glass breakage and electrical insulation breakdown. This paper integrates the results from these various studies and draws general conclusions relative to optimal reliability features for future modules. The described analysis is based on designing for specified low levels of component failures and then controlling the degrading effects of the failures through the use of fault tolerant circuitry and module replacement. Means of selecting the cost-optimal level of component failures, circuit redundancy, and module replacement are described.

Ross, R. G., Jr.↗

Sensitivity analysis by approximation formulas - Illustrative examples

This paper examines the reliability of three architectures for six components. For each architecture, the probabilities of the failure states are given by algebraic formulas involving the component fault rate, the system recovery rate, and the operating time. The dominant failure modes are identified, and the change in reliability is considered with respect to changes in fault rate, recovery rate, and operating time. The major conclusions concern the influence of system architecture on failure modes and parameter requirements. Without this knowledge, a system designer may pick an inappropriate structure.

White, A. L.↗

Operations planning and analysis handbook for NASA/MSFC phase B development projects

Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

Batson, Robert C.↗