At least 1,783 records · Page 99

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Fire Station #2, Former Sewage Treatment Plant #17, and Towway Area-SWMU 114 PFAS Site Assessment Progress Report Kennedy Space Center, Florida

This PFAS Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from November 2021 through August 2022 at Solid Waste Management Unit (SWMU) 114 located within Kennedy Space Center (KSC), Florida. SWMU 114 includes area around Fire Station #2, Former Sewage Treatment Plant #17, the southern portion of the Shuttle Landing Facility Runway, Remote Launch Vehicle Hangar, and the Towway area. Fire Station #2 was constructed in 2008 and is currently active, housing fire station personnel and equipment, including aqueous film forming foam (AFFF). Releases of AFFF has occurred at SWMU 114. Previous environmental assessments have been performed at SWMU 114, including soil, groundwater, and surface water sampling for volatile organic compounds, polycyclic aromatic hydrocarbons, total petroleum hydrocarbons, and metals. No active remediation has been performed at the SWMU 114. PFAS site assessment field activities were conducted at SWMU 114 from November 2021 through August 2022. During the 2021-2022 Site Assessment, 124 direct-push samples were collected from 27 locations, 17 surface water samples were collected from 15 locations, 41 groundwater samples were collected from 37 newly installed monitoring wells, five concrete samples were collected from four locations, and one asphalt sample was collected. Additionally, two soil borings were advanced to 60 feet for lithologic descriptions, ten staff gauges were installed, and one round of water level measurements were collected from monitoring wells and staff gauges for groundwater flow determination. All groundwater and surface water samples were analyzed for 25 PFAS analytes by USEPA Method 537M. Concrete, and asphalt samples were analyzed by synthetic precipitation leaching procedure (SPLP) PFAS analysis by USEPA Modified Method 537M. Groundwater results were compared to the most recent Regional Screening Levels (RSLs) published by USEPA for residential tap water (USEPA, 2022a) to determine the extent of PFAS contamination at SWMU 114 for six PFAS analytes (PFOA, PFNA, PFBS, PFHxS, PFOS, and GenX). Surface water results were compared to the FDEP surface water screening levels (SW SLs) (FDEP, 2020) for PFOA and PFOS. The PFAS investigation concluded that groundwater exceeding RSLs extends east and south to Banana Creek and west to approximately the center of the SLF runway. The extent of PFAS is approximated to the north, to an area between Sharkey Road and Astronaut Road, where samples below the RSLs do not fully bound SWMU 114. At least two distinct PFAS source areas are located near Fire Station #2 and along Towway, at S114-MW0007S, within SWMU 114. Groundwater head measurements indicate that flow at SWMU 114 is generally similar across the shallow and intermediate water tables. A northeast to southwest trending groundwater divide is located near the middle of Towway where groundwater southeast of the divide flows to the south and groundwater northwest of the divide flows to the west. The groundwater divide generally separates the two areas of higher PFAS concentrations. Surface water samples indicated concentrations of PFOS above the SW SLs in surface water bodies across the site. Further assessment and sampling are required to better understand the interaction between groundwater and surface water at SWMU 114. Concrete and asphalt samples collected confirm that a significant release of AFFF occurred near the stormwater pond northwest of Fire Station #2. Additional concrete samples surrounding Fire Station #2 and at the northwest and southeast edges of the SLF tarmac indicate elevated PFOS concentrations. These results indicate that discharges of AFFF in these locations have infiltrated into asphalt and concrete and may act as a continuing source of PFAS to groundwater and surface water after rain events. Additional direct-push samples are required to delineate PFAS at SWMU 114. Samples may need to extend beyond the Former SLF Rescue Building and Morpheous Test Site to delineate PFAS in groundwater. Monitoring wells should be sampled and gauged quarterly to determine if seasonal impacts are observable, especially in shallow wells near surface water features. Furthermore, surface water samples should be collected from additional ditches to further define the extent of surface water impacts at SWMU 114 and extending along the SLF runway. Staff gauges should be gauged quarterly with groundwater gauging to determine surface water flow and interaction with groundwater. The PFAS sampling results and path forward for SWMU 114 were presented to the KSC Remediation Team in October 2022. Once the PFAS SAPR is approved, it will be submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Simplified Structure Models for Premixed n-Alkane Cool Flames

The chemical kinetics of cool flames in mixtures of normal alkanes, oxygen, and nitrogen recently have been reduced to obtain simplified asymptotic flame-structure models that can be used to compare theoretical predictions with experimental measurements. A key step that affects flame structures strongly, namely the abstraction of a hydrogen atom from the alkyl radical by an oxygen molecule, had not been taken into account in those models. This deficiency has now been remedied for diffusion flames. The present contribution reports the corresponding remedy for premixed-flame analyses. In the new model, non-zero chemical reaction rates are restricted to narrow regions in the vicinity of the maximum temperature, whereas previously they extended throughout the preheat zone. Comparisons of the new predictions with experimental burning-velocity measurements seem favorable.

premixed cool flames↗

Activities in Support of Continuing the Service of Nuclear Power Plant Safety-Related Concrete Structures

Nuclear power plant concrete structures are described. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status provided. Operating experience related to performance of the concrete structures is presented. Basic components of a program to manage aging of the concrete structures are identified and described: degradation mechanisms, damage models, and material performance; assessment and remediation (i.e., component selection, in-service inspection, non-destructive examinations, and remedial actions); and estimation of performance at present or some future point in time (i.e., application of structural reliability theory to the design and optimization of in-service inspection/maintenance strategies, and determination of the effects of degradation on plant risk). Finally, areas are noted where additional research would be of benefit to aging management of nuclear power plant concrete structures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

STRATEGIES FOR IMMOBILIZATION OF DEEP VADOSE ZONE CONTAMINANTS AT THE HANFORD CENTRAL PLATEAU

Deep vadose zone contamination poses some of the most difficult remediation challenges for the protection of groundwater at the Hanford Site in Richland, Washington. This paper describes processes and technologies being developed to use in the ongoing effort to remediate the contamination in the deep vadose zone at the Hanford Site.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimentally Measured Interfacial Area during Gas Injection into Saturated Porous Media: An Air Sparging Analogy

The amount of interfacial area (awn) between air and subsurface liquids during air-sparging can limit the rate of site remediation. Lateral movement within porous media could be encountered during air-sparging operations when air moves along the bottom of a low-permeability lens. This study was conducted to directly measure the amount of awn between air and water flowing within a bench-scale porous flow cell during the lateral movement of air along the upper edge of the cell during air injections into an initially water-saturated flow cell. Four different cell orientations were used to evaluate the effect of air injection rates and porous media geometries on the amount of awn between fluids. Air was injected at flow rates that varied by three orders of magnitude, and for each flow cellover this range of injection rates little change in awn was noted. A wider variation in awn was observed when air moved through different regions for the different flow cell orientations. These results are in good agreement with the experimental findings of Waduge et al. (2007), who performed experiments in a larger sand-pack flow cell, and determined that air-sparging efficiency is nearly independent of flow rate but highly dependent on the porous structure. By directly measuring the awn, and showing that awn does not vary greatly with changes in injection rate, we show that the lack of improvement to remediation rates is because there is a weak dependence of the awn on the air injection rate.

58 GEOSCIENCES↗

RADIOACTIVE WASTE MANAGEMENT IN THE CHERNOBYL EXCLUSION ZONE - 25 YEARS SINCE THE CHERNOBYL NUCLEAR POWER PLANT ACCIDENT

Radioactive waste management is an important component of the Chernobyl Nuclear Power Plant accident mitigation and remediation activities of the so-called Chernobyl Exclusion Zone. This article describes the localization and characteristics of the radioactive waste present in the Chernobyl Exclusion Zone and summarizes the pathways and strategy for handling the radioactive waste related problems in Ukraine and the Chernobyl Exclusion Zone, and in particular, the pathways and strategies stipulated by the National Radioactive Waste Management Program. The brief overview of the radioactive waste issues in the ChEZ presented in this article demonstrates that management of radioactive waste resulting from a beyond-designbasis accident at a nuclear power plant becomes the most challenging and the costliest effort during the mitigation and remediation activities. The costs of these activities are so high that the provision of radioactive waste final disposal facilities compliant with existing radiation safety requirements becomes an intolerable burden for the current generation of a single country, Ukraine. The nuclear accident at the Fukushima-1 NPP strongly indicates that accidents at nuclear sites may occur in any, even in a most technologically advanced country, and the Chernobyl experience shows that the scope of the radioactive waste management activities associated with the mitigation of such accidents may exceed the capabilities of a single country. Development of a special international program for broad international cooperation in accident related radioactive waste management activities is required to handle these issues. It would also be reasonable to consider establishment of a dedicated international fund for mitigation of accidents at nuclear sites, specifically, for handling radioactive waste problems in the ChEZ. The experience of handling Chernobyl radioactive waste management issues, including large volumes of radioactive soils and complex structures of fuel containing materials can be fairly useful for the entire world's nuclear community and can help make nuclear energy safer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)

Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft) long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adsorption of Dissolved Metals in the Berkeley Pit using Thiol-Functionalized Self-Assembled Monolayers on Mesoporous Supports (Thiol-SAMMS)

The Berkeley Pit in Butte, Montana, is heavily contaminated with dissolved metals. Adsorption and extraction of these metals can be accomplished through the use of a selective adsorbent. For this research, the adsorbent used was thiol-functionalized Self-Assembled Monolayers on Mesoporous Supports (thiol-SAMMS), which was developed at Pacific Northwest National Laboratory (PNNL). Thiol-SAMMS selectively binds to numerous types of dissolved metals. The objective of this research was to evaluate the loading and kinetics of aluminum, beryllium, copper, and zinc on thiol-SAMMS. For the loading tests, a series of Berkeley Pit water to thiol-SAMMS ratios (mL:g) were tested. These ratios were 1000:1, 500:1, 100:1, and 50:1. Berkeley Pit water is acidic (pH {approx} 2.5). This can affect the performance of SAMMS materials. Therefore, the effect of pH was evaluated by conducting parallel series of loading tests wherein the Berkeley Pit water was neutralized before or after addition of thiol-SAMMS, and a series of kinetics tests wherein the Berkeley Pit water was neutralized before addition of thiol-SAMMS for the first test and was not neutralized for the second test. For the kinetics tests, one Berkeley Pit water to thiol-SAMMS ratio was tested, which was 2000:1. The results of the loading and kinetics tests suggest that a significant decrease in dissolved metal concentration at Berkeley Pit could be realized through neutralization of Berkeley Pit water. Thiol-SAMMS technology has a limited application under the highly acidic conditions posed by the Berkeley Pit. However, thiol-SAMMS could provide a secondary remedial technique which would complete the remedial system and remove dissolved metals from the Berkeley Pit to below drinking water standards.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influence of Carbon Sources and Electron Shuttles on Ferric Iron Reduction by Cellulomonas sp. Strain ES6

The reduction of hexavalent chromium, Cr(VI), to trivalent chromium, Cr(III), can be an important aspect of remediation processes at Department of Energy (DOE) and other contaminated sites. Cellulomonas species are found at several Cr(VI) contaminated and uncontaminated locations at the DOE site in Hanford, Washington. Members of this genus have demonstrated the ability to effectively reduce Cr(VI) to Cr(III) fermentatively and therefore play a potential role in hexavalent chromium remediation at this site. Batch studies were conducted with Cellulomonas sp. strain ES6 to assess the influence of various carbon sources, iron minerals, and electron shuttling compounds on Cr(VI) reduction. These chemical species are likely to be present in these terrestrial environments during in situ bioremediation. Results indicated that there were a number of interactions between these compounds that influenced Cr(VI) reduction rates. The type of carbon source as well as the type of electron shuttle present influenced Cr(VI) reduction rates. When an electron shuttle, such as anthraquinone-2,6-disulfonate (AQDS), was present in the system, reduction rates increased significantly. Biologically reduced AQDS (AHDS) reduced Cr(VI) almost instantaneously. The presence of iron minerals and their concentrations did not significantly influence Cr(VI) reduction rates. However, strain ES6 or AQDS could directly reduce surface-associated Fe(III) to Fe(II) which was capable of reducing Cr(VI) at a near instantaneous rate. These results suggest the rate limiting step in these systems is the transfer of electrons from strain ES6 to the intermediate or terminal electron acceptor whether that is Cr(VI), Fe(III), or AQDS.

60 APPLIED LIFE SCIENCES↗

Los Alamos National Laboratory

The purpose of the briefing is to describe general laboratory technical capabilities to be used for various groups such as military cadets or university faculty/students and post docs to recruit into a variety of Los Alamos programs. Discussed are: (1) development and application of high leverage science to enable effeictive, predictable and reliability outcomes; (2) deter, detect, characterize, reverse and prevent the proliferation of weapons of mass destruction and their use by adversaries and terrorists; (3) modeling and simulation to define complex processes, predict outcomes, and develop effective prevention, response, and remediation strategies; (4) energetic materials and hydrodynamic testing to develop materials for precise delivery of focused energy; (5) materials cience focused on fundamental understanding of materials behaviors, their quantum-molecular properties, and their dynamic responses, and (6) bio-science to rapidly detect and characterize pathogens, to develop vaccines and prophylactic remedies, and to develop attribution forensics.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

STRATIGRAPHIC CONTROL ON CCL4 AND CHCL3 CONCENTRATIONS IN THE 200 WEST AREA, HANFORD SITE

An extensive subsurface contaminant plume of carbon tetrachloride (CCl4) is the focus of a remedial effort in the 200 West Area of the U.S. Department of Energy’s Hanford Site in eastern Washington. Remediation requires a high-resolution understanding of the region’s spatially variable lithofacies and of the effect these lithofacies have on CCl4 migration through the unconfi ned aquifer. To increase the level of detail of our current understanding, a transect was chosen along the primary groundwater fl ow path in the most heavily contaminated area. Borehole logs of wells along this 3.7 km-long transect were standardized and used to create a cross section displaying the depth and continuity of lithofacies. Natural and spectral gamma geophysical logs were examined to pinpoint the depths of geologic units. Depth discrete concentrations of CCl4 and its reductive dechlorination product, chloroform (CHCl3), were overlain on this cross section. Comparison of stratigraphy to contaminant levels shows that peaks in CCl4 concentration occur in thin, fine-grained layers and that other fine-grained layers frequently form lower boundaries to regions of high concentration. Peaks in CCl4 concentrations are frequently located at different depths from those of CHCl3, suggesting that these concentrations are affected by dechlorination of CCl4. Transformation of CCl4 to CHCl3 appears to be more prevalent within reduced, iron-containing sediments. The infl uence of thin, fine-grained layers within the larger aquifer unit indicates that characterization of contamination in this locality should consider subsurface geology with at least as much resolution as provided in this study.

Winsor, K↗

System for detecting operating errors in a variable valve timing engine using pressure sensors

A method and control module includes a pressure sensor data comparison module that compares measured pressure volume signal segments to ideal pressure volume segments. A valve actuation hardware remedy module performs a hardware remedy in response to comparing the measured pressure volume signal segments to the ideal pressure volume segments when a valve actuation hardware failure is detected.

47 OTHER INSTRUMENTATION↗

Activities in Support of Continuing the Service of Nuclear Power Plant Safety-Related Concrete Structures

Nuclear power plant (NPP) concrete structures are described. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status provided. Operating experience related to performance of the concrete structures is presented. Basic components of a program to manage aging of the concrete structures are identified and described: (1) Degradation mechanisms, damage models, and material performance; (2) Assessment and remediation: i.e., component selection, in- service inspection, non-destructive examinations, and remedial actions; and (3) Estimation of performance at present or some future point in time: i.e., application of structural reliability theory to the design and optimization of in-service inspection/maintenance strategies, and determination of the effects of degradation on plant risk. Finally, areas are noted where additional research would be of benefit to aging management of nuclear power plant concrete structures.

codes and standards↗

The Evolution of LTS at DOE's Hanford Site

Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richland Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.

54 ENVIRONMENTAL SCIENCES↗

Efficiencies and Optimization of Weak Base Anion Ion-Exchange Resin for Groundwater Hexavalent Chromium Removal at Hanford

The U.S. Department of Energy’s (DOE’s) contractor, CH2M HILL Plateau Remediation Company, has successfully converted a series of groundwater treatment facilities to use a new treatment resin that is delivering more than $3 million in annual cost savings and efficiency in treating groundwater contamination at the DOE Hanford Site in southeastern Washington State. During the production era, the nuclear reactors at the Hanford Site required a continuous supply of high-quality cooling water during operations. Cooling water consumption ranged from about 151,417 to 378,541 L/min (40,000 to 100,000 gal/min) per reactor, depending on specific operating conditions. Water from the Columbia River was filtered and treated chemically prior to use as cooling water, including the addition of sodium dichromate as a corrosion inhibitor. Hexavalent chromium was the primary component of the sodium dichromate and was introduced into the groundwater at the Hanford Site as a result of planned and unplanned discharges from the reactors starting in 1944. Groundwater contamination by hexavalent chromium and other contaminants related to nuclear reactor operations resulted in the need for groundwater remedial actions within the Hanford Site reactor areas. Beginning in 1995, groundwater treatment methods were evaluated, leading to the use of pump-and-treat facilities with ion exchange using Dowex™ 21K, a regenerable, strong-base anion exchange resin. This required regeneration of the resin, which was performed offsite. In 2008, DOE recognized that regulatory agreements would require significant expansion for the groundwater chromium treatment capacity. As a result, CH2M HILL performed testing at the Hanford Site in 2009 and 2010 to demonstrate resin performance in the specific groundwater chemistry at different waste sites. The testing demonstrated that a weak-base anion, single-use resin, specifically ResinTech SIR-700 ®, was effective at removing chromium, had a significantly higher capacity, could be disposed of efficiently onsite, and would eliminate the complexities and programmatic risks from sampling, packaging, transportation, and return of resin for regeneration.

54 ENVIRONMENTAL SCIENCES↗

Natural and Enhanced Attenuation of Soil and Groundwater at the Monument Valley, Arizona, DOE Legacy Waste Site—10281

The U.S. Department of Energy (DOE), the Navajo Nation, and the University of Arizona are exploring natural and enhanced attenuation remedies for groundwater contamination at a former uranium-ore processing site near Monument Valley, Arizona. DOE removed radioactive tailings from the Monument Valley site in 1994. Nitrate and ammonium, waste products of the milling process, remain in an alluvial groundwater plume spreading from the soil source where tailings were removed. Planting and irrigating two native shrubs, fourwing saltbush and black greasewood, markedly reduced both nitrate and ammonium in the source area over an 8-year period. Total nitrogen dropped from 350 mg/kg in 2000 to less than 200 mg/kg in 2008. Most of the reduction is attributable to irrigation-enhanced microbial denitrification rather than plant uptake. However, soil moisture and percolation flux monitoring show that the plantings control the soil water balance in the source area, preventing additional leaching of nitrogen compounds. Enhanced denitrification and phytoremediation also look promising for plume remediation. Microcosm experiments, nitrogen isotopic fractionation analysis, and solute transport modeling results suggest that (1) up to 70 percent of nitrate in the plume has been lost through natural denitrification since the mill was closed in 1968, and (2) injection of ethanol may accelerate microbial denitrification in plume hot spots. A field-scale ethanol injection pilot study is underway. Landscape-scale remote sensing methods developed for the project suggest that transpiration from restored native phreatophyte populations rooted in the aquifer could limit further expansion of the plume. An evaluation of landfarm phytoremediation, the irrigation of native shrub plantings with high nitrate water pumped from the alluvial aquifer, is also underway.

Najavo, groundwater contamination, uranium-ore pro↗