Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Fiscal Year 2010 Program of the U.S. DOE Office of Groundwater and Soil Remediation

The mission of the Office of Groundwater and Soil Remediation (EM-32) is to perform assessments, establish technical criteria and promote cross-site integration. The Office provides guidance for the development and implementation of plans for remediation of groundwater and is responsible for development of technologies needed to reduce risk from groundwater contamination. It is also responsible for providing technical direction and/or assistance to sites in resolving difficult technical groundwater and soil remediation problems. This paper discusses the activities funded by EM-32 for FY-2010.

54 ENVIRONMENTAL SCIENCES↗

Benefits of Lean Management in liquid waste operations - One company's journey - 15402

For Savannah River Remediation, LLC (SRR), Lean Management is the culmination of a number of years of searching for an effective process improvement methodology. SRR formally applies Lean Management as the cornerstone to transforming the way we work and lead. Two foundational principles support all Lean efforts: respect for people and continuous process improvement. Respect for people means we respect the work they do and the knowledge they have attained. Continuous process improvement focuses on continuous because to be successful we must continuously return to the process to refine, improve, and optimize. Like every other US DOE contractor, SRR is faced with challenges to accomplish more with less. Our initial round of Lean events focused on value streams such as Work Planning and Control, Supply Chain, and Tank Closure acceleration. We have completed a first pass through these programs. As a result, in general terms, process times were cut in half, while reducing rework and quality issues significantly. SRR reduced Corrective Maintenance backlogs without any appreciable increase in the workforce. This paper chronicles our search for improvement, what we did right, what we did wrong, and where we go next. In short, we want to challenge the management, contractors, and employees in US DOE complex to take this journey. The work we do is vitally important to our nation, our families, and our future. We owe it to the US DOE mission to do all we can with entrusted facilities, personnel, and taxpayer dollars. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Safeguards Analysis of PWR Spent Nuclear Fuel in Dry Storage - 17435

The master plan for spent nuclear fuel (SNF) management in Korea recently adopted by Korean atomic energy promotion council. According to the master plan, the detailed practical and R and D strategies for SNF transferring, storage and disposal should be determined in the near future. Besides, it is also necessary to make plan how to secure SNF at each step in terms of nuclear safeguards, safety, security and nonproliferation. Several nondestructive analysis (NDA) techniques have been studied for assuring the safety of SNF in PWR methods. Obviously, gamma-ray is most dominant radiation emitted by SNF so several gamma-ray measurement methods have been developed and applied for the purpose of SNF monitoring. Those methods, however, suffer from a lack of nuclear data and interfering background radiation. To date, several neutron measurement methods have been developed as a solution to the problem of gamma-ray methods. Korea Institute of Nuclear Nonproliferation and Control (KINAC) currently develops a new novel technique of fast neutron detection for spent fuel monitoring at dry spent fuel storage facilities. As the first step, a computational program has been developed in order to evaluate neutron flux on the surface of PWR dry storage cask and study for some potential sabotage events. Typically, neutron flux on the surface of dry storage cask can be evaluated via two steps. The source term, based on burn-up rate of SNF, its cooling time and others related to operation condition at nuclear power plants, can be firstly defined by ORIGEN code. The surface flux can be then evaluated via MCNP code. These two separated steps are complicated and time consuming so KINAC developed a new algorithm and user-interface, coupled ORIGEN and MCNP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Paradigm Shift continued: An Application of Structured Decision Making for Sustainable Waste Management - 16486

Structured decision making presents an opportunity for DOE and others engaged in solving complex environmental and waste management problems to find solutions that are stakeholder engaged and cost effective. This approach represents a paradigm shift that was introduced in a series of papers and a panel session at the WM2015 Symposium. The advantages of structured decision making over less formal approaches to decision making include technical defensibility, traceability and transparency. Structured decision making also overcomes the limitations of misapplication of conservatism in modeling, addresses stakeholder concerns and competing objectives directly, and provides a formal method through which internal and external stakeholders are encouraged to collectively and carefully consider all relevant attributes of solving complex problems. The first requirement of this paradigm shift is a realization and recognition that the problems faced are inherently decision problems, and that there is a formal theory of decision analysis that can, and should, be used to support finding the best solutions. Structured decision making is, very simply, formalized common sense. The formalities include: framing the problem; identification of objectives and measures for valuing those objectives; costs or values associated with those objectives; management options or alternatives for taking action that are tied directly to the objectives; and, science-based models to evaluate the options. Decision analysis is used to evaluate objectives and choose management options by balancing probability and consequence. The science-based models are built probabilistically based on expectation and uncertainty, and costs and value judgments are used to fulfill addressing stakeholder concerns. Consequently, this approach avoids misplaced conservatism in science-based modeling and properly places values in the objectives component of a decision model. This approach honestly addresses uncertainty and value judgments and balances these competing components to find the most effective decision. A software framework program called Guided Interactive Statistical Decision Tools (GiSdT - pronounced 'gist') is used to support an application of this paradigm shift towards structured decision making. In this application objectives and management options for a waste disposal problem at the Los Alamos National Laboratory are identified, and features, events and processes are described and defined to form the basis of a conceptual site model. This establishes the decision model structure. Objectives are addressed through the three pillars of sustainability - economic, environmental, and social - and also address regulatory concerns or constraints. Management options include removal of waste to another location and engineering designs for leaving waste in place. Using structured decision making, the relationship between objectives, management options, and the conceptual site model is made clear, and leads to a comprehensive, defensible, transparent and traceable approach to effective decision making. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of waste characteristics, and the tracking of inventories against total limits that would affect the results and conclusions of the performance assessment. Waste receipts to date and projected waste receipts through Fiscal Year 2012 are both greater than the inventory assessed in the performance assessment and composite analysis. The waste forms disposed of to the landfill are different from the waste form (compacted soil) assessed in the performance assessment. The leak detection system and groundwater monitoring results indicate the landfill has not leaked. The results of the performance assessment/composite analysis are valid (i.e., there is still a reasonable expectation of meeting performance objectives) but the new information indicates less conservatism in the results than previously believed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compendium of Completed Testing in Support of Rotary Microfiltration at Savannah River Site and Hanford

This report presents a chronological summary of previous technology development efforts concerning the rotary microfiltration (RMF) unit from SpinTek™. Rotary microfiltration has been developed for high radiation application over the last decades as one of the optional filtration techniques for supplemental treatment. Supplemental treatment includes a near- or in-tank solids separation and subsequent cesium removal unit, followed by an immobilization technique; this includes options such as steam reforming, bulk vitrification or cast stone (grout). The main difference between RMF and standard cross flow filtration (CFF) is the disconnection of filtrate flux from feed velocity; i.e., filtrate flux is only dependent on transmembrane pressure, filter fouling and temperature. These efforts have been supported by the U.S. Department of Energy (DOE), Office of Cleanup Technologies since the 1990s by their Environmental Management Program (currently EM-31). In order to appropriately address future testing needs, a compilation of the relevant previous testing reports was essential. This compendium does not intend to cover all of the presentations/reports that were produced over the last decades but focuses on those of relevance for developing an RMF unit fit for deployment at the Hanford site. The report is split into three parts: (1) an introductory overview, (2) Figure 1 graphically covering the main development steps and its key players and (3) a more detailed table of the citations and brief descriptions of results and recommendations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vapor Extraction Well Performance and Recommendations for Future Soil Vapor Extraction Activities at the A-014 Outfall

The vadose zone near the A-014 Outfall contains residual volatile organic compounds that serve as a potential source for groundwater contamination. Since 1995 active soil vapor extraction has been an integral part of the corrective actions at this facility. Currently two separate soil vapor extraction systems are being used to remove contamination in the vapor phase from the subsurface. The 782-3M soil vapor extraction unit was deployed in April of 1995 and the A-014 Mobile #3 unit was deployed in January of 2009. The objective of this investigation is to evaluate the performance of individual wells associated with these systems and provide recommendations on possible optimizations to these systems. Options that are considered include continuation of active extraction, transition to a low-energy soil vapor extraction treatment, or abandon nonperforming wells. The scope of the investigation examined the eighteen (18) vadose zone wells that are associated with the ongoing Resource Conservation and Recovery Act corrective action program within A/M Area. During the evaluation process, individual wells were isolated and purged for a standard period using the existing soil vapor extraction system. Following the purge period, vapor samples were collected intermittently over the following 24–72-hour period. The objective of the sampling activity was to collect sufficient data to estimate the mass flow rate of contaminants from the individual extraction wells. Subsequent analysis then evaluated and ranked extraction performance to provide recommendations on the viability, operational scheme, and applicability of low energy soil vapor extraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phenix Power Plant Decommissioning Project - Removal of Core and Neutron Blanket Components

Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009 in accordance with the reactor operating program with a mean availability of 80%. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase corresponds to the initial operations undertaken to remove the maximum of hazardous materials. During this phase, subject to the standard operating methodological procedures, all the fuel in the plant will be removed and most of the other reactor core elements and other removable components (primary pumps, intermediate heat exchangers, control rod mechanisms, etc.) will be also dismantled and packaged in accordance with the available disposition routes. The core elements include fissile and fertile subassemblies, steel reflectors, and lateral neutron shielding rods. About half the lateral neutron shielding rods are accessible using the existing handling equipment; specific development work will be necessary to remove the others. Multiple engineering studies are in progress concerning the removal of the core elements. They address safety concerns taking into account thermal and seismic stresses, waste management including radiological characterization of the objects to be removed and the specification of suitable disposal routes (interim storage or disposal facilities), and scenario studies with the definition of each stage of the waste removal process. All these aspects are discussed in this paper. The feasibility of removing the core elements has been demonstrated with regard to handling and safety. A new handling arm is now being developed to remove the inaccessible core elements. The new earthquake safety calculations completed in 2006 did not reveal any insurmountable difficulties. Major work remains to characterize the core elements and determine the capacity of the disposition routes. The characterization program now in progress will validate the core element activation levels, but must be supplemented by a program to characterize the surface contamination from the primary sodium system. Concerning the disposition routes, several specific containers and shipping casks must be developed; engineering studies are now in progress to obtain the necessary approvals.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Managing TRU waste processing and storage issues/challenges - 15487

Operational events at the Waste Isolation Pilot Plant (WIPP) facility resulted in suspension of disposal operations and waste shipments to WIPP creating significant challenges for the Department of Energy (DOE) complex. The Oak Ridge Transuranic (TRU) Waste Program which was poised to re-start shipping after a 2.5 year suspension of the Carlsbad Field Office (CBFO) certification activities which resulted in on-site accumulation of the highest activity contact handled (CH) TRU waste containers. As a result, Transuranic Waste Processing Center (TWPC) is nearing its physical storage capacity for CH waste and has already reached storage capacity limits for remote handled (RH) TRU waste. The TWPC storage capacity for RH-TRU waste is very limited and dependent on real time shipping support to continue RH waste processing activities in the facilities Hot Cell. Additionally, changes in dispersion modeling (i.e., dry deposition factor changes) used in the TWPC Documented Safety Analysis (DSA) present Material at Risk (MAR) management challenges to effectively manage off-site dose consequences. These facts necessitated the identification of alternative waste storage options for both CH and RH waste to continue waste processing operations at TWPC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization and improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MEASUREMENT OF AMMONIA RELEASE FROM SALTSTONE

SRNL was requested by WSRC Waste Solidification Engineering to characterize the release of ammonia from saltstone curing at 95 C by performing experimental testing. These tests were performed with an MCU-type Tank 50H salt simulant containing 0, 50, and 200 mg/L ammonia. The testing program showed that above saltstone made from the 200 mg/L ammonia simulant, the vapor space ammonia concentration was about 2.7 mg/L vapor at 95 C. An upper 95% confidence value for this concentration was found to be 3.9 mg/L. Testing also showed that ammonia was chemically generated from curing saltstone at 95 C; the amount of ammonia generated was estimated to be equivalent to 121 mg/L additional ammonia in the salt solution feed. Even with chemical generation, the ammonia release from saltstone was found to be lower than its release from salt solution only with 200 mg/L ammonia.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

REDUCTION OF CONSTRAINTS FOR COUPLED OPERATIONS

The homogeneity constraint was implemented in the Defense Waste Processing Facility (DWPF) Product Composition Control System (PCCS) to help ensure that the current durability models would be applicable to the glass compositions being processed during DWPF operations. While the homogeneity constraint is typically an issue at lower waste loadings (WLs), it may impact the operating windows for DWPF operations, where the glass forming systems may be limited to lower waste loadings based on fissile or heat load limits. In the sludge batch 1b (SB1b) variability study, application of the homogeneity constraint at the measurement acceptability region (MAR) limit eliminated much of the potential operating window for DWPF. As a result, Edwards and Brown developed criteria that allowed DWPF to relax the homogeneity constraint from the MAR to the property acceptance region (PAR) criterion, which opened up the operating window for DWPF operations. These criteria are defined as: (1) use the alumina constraint as currently implemented in PCCS (Al{sub 2}O{sub 3} {ge} 3 wt%) and add a sum of alkali constraint with an upper limit of 19.3 wt% ({Sigma}M{sub 2}O < 19.3 wt%), or (2) adjust the lower limit on the Al{sub 2}O{sub 3} constraint to 4 wt% (Al{sub 2}O{sub 3} {ge} 4 wt%). Herman et al. previously demonstrated that these criteria could be used to replace the homogeneity constraint for future sludge-only batches. The compositional region encompassing coupled operations flowsheets could not be bounded as these flowsheets were unknown at the time. With the initiation of coupled operations at DWPF in 2008, the need to revisit the homogeneity constraint was realized. This constraint was specifically addressed through the variability study for SB5 where it was shown that the homogeneity constraint could be ignored if the alumina and alkali constraints were imposed. Additional benefit could be gained if the homogeneity constraint could be replaced by the Al{sub 2}O{sub 3} and sum of alkali constraint for future coupled operations processing based on projections from Revision 14 of the High Level Waste (HLW) System Plan. As with the first phase of testing for sludge-only operations, replacement of the homogeneity constraint with the alumina and sum of alkali constraints will ensure acceptable product durability over the compositional region evaluated. Although these study glasses only provide limited data in a large compositional region, the approach and results are consistent with previous studies that challenged the homogeneity constraint for sludge-only operations. That is, minimal benefit is gained by imposing the homogeneity constraint if the other PCCS constraints are satisfied. The normalized boron releases of all of the glasses are well below the Environmental Assessment (EA) glass results, regardless of thermal history. Although one of the glasses had a normalized boron release of approximately 10 g/L and was not predictable, the glass is still considered acceptable. This particular glass has a low Al{sub 2}O{sub 3} concentration, which may have attributed to the anomalous behavior. Given that poor durability has been previously observed in other glasses with low Al{sub 2}O{sub 3} and Fe{sub 2}O{sub 3} concentrations, including the sludge-only reduction of constraints study, further investigations appear to be warranted. Based on the results of this study, it is recommended that the homogeneity constraint (in its entirety with the associated low frit/high frit constraints) be eliminated for coupled operations as defined by Revision 14 of the HLW System Plan with up to 2 wt% TiO{sub 2}. The use of the alumina and sum of alkali constraints should be continued along with the variability study to determine the predictability of the current durability models and/or that the glasses are acceptable with respect to durability. The use of a variability study for each batch is consistent with the glass product control program and it will help to assess new streams or compositional changes. It is also recommended that the influence of alumina and alkali on durability be studied in greater detail. Limited data suggests that there may be a need to adjust the lower Al{sub 2}O{sub 3} limit and/or the upper alkali limit in order to prevent the fabrication of unacceptable glasses. An in-depth evaluation of all previous data as well as any new data would help to better define an alumina and alkali combination that would avoid potential phase separation and ensure glass durability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval of High Level Waste for the Cigeo Project - A Practical Retrieval Test Story - 16085

Since the passing of the June 28, 2006 Act, Andra has incorporated in its step-wise design development of the French high level waste (HLW) and intermediate level long lived waste (IL-LLW) deep geological repository (DGR, aka Cigeo) various requirements linked to 'reversibility' at different stages of the repository life cycle (from its construction phase to its final closure). Reversibility is based on a number of practical dispositions including the progressivity of the development and deployment of the facility, the flexibility of the nature of operations being carried out, the adaptability of the facility to future modifications and the possible retrieval of waste. The capacity to retrieve waste from Cigeo, also called 'retrievability', bears specific requirements. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible over at least 100 years. The current paper starts with two acceptations: retrievability and reversibility. It details how those two notions are defined and inter-linked. The 'Retrievability Scale' as proposed by OECD/NEA (and adopted by Andra) is also reminded. The needs for demonstration of retrieval operations are also exposed for the two categories of waste containers disposed of in Cigeo (IL-LLW and HLW) within the context of their respective emplacement configurations (in disposal horizontal vaults and micro-tunnels) at different stages of the repository life cycle. The technical part of the paper is then focused on a practical case story: a technological test campaign (still running) of HLW container retrieval out of a steel cased disposal micro-tunnel. On a test bench built on surface to simulate (create) the environmental conditions that may prevail inside a HLW micro-tunnel at time of retrieval, it was possible to check whether the mechanical means developed for the purpose were adequate and sufficient. The test case story is exposed, c/w the problems and challenges encountered (high temperature impairing the retrieval robot's proper functioning, presence of corrosion products...). The trouble-shooting solutions implemented and the results are commented. This article concludes with a critical analysis of the methods and equipment used, the results obtained and provides some perspectives of improvement. The positive outcomes of this technical test campaign pave the way for planning the in situ retrieval tests to be programmed in the 'industrial pilot phase' of Cigeo (to be implemented over the ten first years of operations, including the active and inactive test period and the first years of disposal activities): the industrial pilot phase is presently scheduled around 2026-2036 (provided the Cigeo construction is authorized in 2021, following the licensing request filing scheduled in 2018). The issues of IL-LLW containers retrieval (for which specific solutions are also studied and technical demonstrations engaged or planned) are also briefly presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Radioactive Waste Tank Inspection Program - 2011

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Radiological Characterization for Off-Site Source Recovery Program Waste Streams LA-OS-00-01.001, LA-OS-00-03, and LA-OS-00-04

The purpose of this memorandum is to satisfy the requirements of Section 4.4 of the CCP Acceptable Knowledge Documentation procedure CCP-TP-005 (Ref. 1). This evaluation is updating the previously issued memo NEN3:24-045 issued in August 2024. CCP-TP-005 requires an AK Expert and the OSRP group to evaluate the radionuclide characterization of a waste stream and prepare the NDA Memorandum (letter to CCP Records). This NDA memorandum was written with input from the OSRP group, as required by CCP-TP-005. This memo includes a discussion of the limitations for the radiological characterization and a description of the characterization method.

07 ISOTOPE AND RADIATION SOURCES↗