Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Optimization of Saltcake Removal Flowsheet at SRS through Incorporation of Testing and In-Tank Waste Experience

Saltcake removal at SRS may be performed for several reasons: to provide space for evaporator operation (i.e., to precipitate more salt in the drop tank), to provide feed for salt processing (i.e. immobilize the waste), or to remove the salt for tank closure. Many different salt dissolution techniques have been employed in the 40 years that SRS has been performing salt removal, from a basic “Add, Sit, Remove” method (water is added on top of the saltcake and time is allowed for diffusion), to performing interstitial liquid removal, or using mixing devices to promote contact with the liquid. Lessons learned from previous saltcake removal campaigns, in addition to testing and modeling, have led to opportunities for improvements to the overall saltcake removal process. This includes better understanding of salt properties and behavior during dissolution; the primary concerns for salt dissolution are the release of radiolytic hydrogen and criticality prevention (post-dissolution). Recent developments in salt dissolution include the reuse of dilute supernate and a semi-continuous dissolution (SCD) process, where low volume mixing eductors are used to deliver water near the surface of the saltcake at the same rate as the salt solution is removed and transferred to a receipt tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Continuous Integration Tools for Application Performance Monitoring

High performance computing systems are becom- ing increasingly complex, both in node architecture and in the multiple layers of software stack required to compile and run applications. As a consequence, the likelihood is increasing for application performance regressions to occur as a result of routine upgrades of system software components which interact in complex ways. The purpose of this study is to evaluate the effectiveness of continuous integration tools for application performance monitoring on HPC systems. In addition, this paper also describes a prototype system for application perfor- mance monitoring based on Jenkins, a Java-based continuous integration tool. The monitoring system described leverages several features in Jenkins to track application performance results over time. Preliminary results and lessons learned from monitoring applications on Cray systems at the Oak Ridge Leadership Computing Facility are presented.

Vergara Larrea, Veronica G↗

The 'Room within a Room' Concept for Monitored Warhead Dismantlement

Over the past 10 years, US and UK experts have engaged in a technical collaboration with the aim of improving scientific and technological abilities in support of potential future nuclear arms control and non-proliferation agreements. In 2011 a monitored dismantlement exercise provided an opportunity to develop and test potential monitoring technologies and approaches. The exercise followed a simulated nuclear object through a dismantlement process and looked to explore, with a level of realism, issues surrounding device and material monitoring, chain of custody, authentication and certification of equipment, data management and managed access. This paper focuses on the development and deployment of the ‘room-within-a-room’ system, which was designed to maintain chain of custody during disassembly operations. A key challenge for any verification regime operating within a nuclear weapon complex is to provide the monitoring party with the opportunity to gather sufficient evidence, whilst protecting sensitive or proliferative information held by the host. The requirement to address both monitoring and host party concerns led to a dual function design which: • Created a controlled boundary around the disassembly process area which could provide evidence of unauthorised diversion activities. • Shielded sensitive disassembly operations from monitoring party observation. The deployed room-within-a-room was an integrated system which combined a number of chain of custody technologies (i.e. cameras, tamper indicating panels and enclosures, seals, unique identifiers and radiation portals) and supporting deployment procedures. This paper discusses the bounding aims and constraints identified by the monitoring and host parties with respect to the disassembly phase, the design of the room-within-a-room system, lessons learned during deployment, conclusions and potential areas of future work. Overall it was agreed that the room-within-a-room approach was effective but the individual technologies used to create the system deployed during this exercise required further development.

Nuclear Weapon, Dismantlement, Chain of Custody, C↗

Fabrication and Measurements of 500 MHz Double Spoke Cavity

A 500 MHz β0=1 double spoke cavity has been designed and optimized for a high velocity application such as a compact electron accelerator at the Center for Accelerator Science at Old Dominion University [1] and the fabrication was recently completed at Jefferson Lab. The geometry specific to the double spoke cavity required a variety of tooling and fixtures. Also a number of asymmetric weld joints were expected to make it difficult to maintain minimal geometric deviation from the design. This paper will report the fabrication procedure, resulting tolerance from the design, initial test results and the lessons learned from the first β0=1 double spoke cavity fabrication.

Park, HyeKyoung↗

IMPLEMENTING THE NFPA 805 PROCESS: Observations of a Technical Reviewer

In June 2004 the U.S. Nuclear Regulatory Commission (NRC) amended its fire protection requirements to permit existing nuclear power reactor licensees to voluntarily adopt fire protection requirements contained in National Fire Protection Association (NFPA) Standard 805. NFPA 805 is a performance-based standard for nuclear power plant fire protection that is an alternative to the deterministic, prescriptive fire protection requirements, such as 10 CFR 50 Appendix R, that was issued in 1980. One aspect of implementing NFPA 805 is that the licensee adopts the performance goals, objectives, and criteria for nuclear safety specified in the Standard. These goals, objectives, and criteria can be met through the implementation of deterministic approaches or performance-based approaches, including engineering analyses, probabilistic risk assessment, and fire modeling. Licensees voluntarily adopting the fire protection requirements in NFPA 805 must submit a license amendment request (LAR) to the NRC. The LAR provides the new proposed fire protection licensing basis, including the methodology and results of required evaluations and analyses that show how the NFPA 805 performance criteria are met. As of August 2014, licensees have submitted LARs for 26 nuclear power plants, representing 42 nuclear reactor units. Of these, 7 nuclear power plants, representing 10 nuclear reactor units, have been issued a safety evaluation (SE) by the NRC approving transition of their fire protection licensing basis to one that complies with NFPA 805. Pacific Northwest National Laboratory (PNNL) supports the NRC staff’s technical review of the LARs in the areas of fundamental fire protection, safe shutdown analysis, and Probabilistic Risk Assessment (PRA). PNNL, of course, cannot speak for the nuclear industry and its choice of implementation strategies or the NRC staff’s assessment of the approaches being taken to adopt NFPA 805. However, as a reviewer of the technical details of these submittals, PNNL is in a position to observe the array of implementation tactics taken in these submittals, and observe different ways licensees are making the NFPA 805 process work. For example, we see differences in how fire areas are being transitioned, the kinds of plant modifications being implemented, the changes being made to plant procedures, the number and types of recovery actions being credited, and the kinds and extent of detailed modeling being performed in support of the Fire PRAs. As a caveat, we note that it is probably too early to comment on the overall success or limitations of the NFPA 805 process or provide lessons learned for the future. Furthermore, it is not our intention to endorse any particular approach taken in a submittal over another or to critique the industry or the regulator. Rather our goal in this paper is to summarize a set of interesting and useful differences across submittals that may provide context for further future discussions about what we (i.e., reviewers, industry, and regulators) have learned in being part of the NFPA process; and how to best use that information to inform future NFPA 805 activities or other risk-informed endeavors.

NFPA 805, PRA, PSA, probabilistic risk assessment,↗

Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

Agile Development↗

Visual Text Analytics for Impromptu Analysts

The Scalable Reasoning System (SRS) is a lightweight visual analytics framework that makes analytical capabilities widely accessible to a class of users we have deemed “impromptu analysts.” By focusing on a deployment of SRS, the Lessons Learned Explorer (LLEx), we examine how to develop visualizations around analytical-oriented goals and data availability. We discuss how to help impromptu analysts to explore deeper patterns. Through designing consistent interactions, we arrive at an interdependent view capable of showcasing patterns. With the combination of SRS widget visualizations and interactions around the underlying textual data, we aim to transition the casual, infrequent user into a viable–albeit impromptu–analyst.

Analyst↗

Amped Up! - Volume 1, No. 1, January/February 2015

EERE’s internal newsletter, Amped Up!, is a bimonthly publication that highlights news within EERE, as well as some of our external successes, lessons learned, and best practices.

Newsletter, Amped, Up, Communications↗

Amped Up! - Volume 1, No. 2, March/April 2015

EERE’s internal newsletter, Amped Up!, is a bimonthly publication that highlights news within EERE, as well as some of our external successes, lessons learned, and best practices.

Amped, Up, Communications, Newsletter↗

Existing Whole-House Solutions Case Study: Deep Energy Retrofit of 1910 House, Portland, Oregon

This case study lists project information, cost and energy efficiency performance data, energy efficiency measures and lessons learned for a 100-year-old home in Portland, Oregon, audited by Pacific Northwest National Laboratory for a deep energy retrofit. New HVAC and extensive insulation upgrades including rigid XPS and new siding over the old lead painted siding, and EPS on the basement walls and in cathedral ceiling helped bring HERS down to 68.

basement↗

Existing Whole-House Solutions Case Study: Retrofit of 1915 Home, Dayton, Washington

This case study lists project information, cost and energy efficiency performance data, energy efficiency measures and lessons learned for a 1915 home in eastern Washington audited by Pacific Northwest National Laboratory for an energy retrofit. The asbestos covered diesel boiler was left in place in the basement and a new SEER 16, HSPF 9.4 ductless heat pump with four inside heads was added to cut energy costs over $2,000/year.

Building America↗

COMSOL-Related Activities within the Research Reactors Division of Oak Ridge National Laboratory

Our group at Oak Ridge National Laboratory (ORNL) started using COMSOL shortly after version 3.0 was released in the Spring of 2004. Over 11 years later and several new releases of the code, the application usage has grown along with the number of licenses we are responsible for. This paper focuses not on details of results and modeling methods, but instead, takes a look at our past and present applications, and evaluates where we are headed with COMSOL in the future. In doing so, we reveal some lessons learned along our pathway, provide some insight on how best to use COMSOL in a group setting, and perhaps help both users and developers to improve how the code is utilized.

COMSOL SQA HFIR↗

Building America Case Study: Zero Energy Ready Home Multifamily Project: Mutual Housing at Spring Lake, Woodland, California

Building cost effective, high performance homes that provide superior comfort, health, and durability is the goal of the Department of Energy's (DOE's) Zero Energy Ready Homes (ZERH) program. Through Building America research and other innovative programs throughout the country, many of the technical challenges to building to the ZERH standard have been addressed. This case study describes the development of a 62-unit multifamily community constructed by nonprofit developer Mutual Housing at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH-certified multifamily project nationwide. Building America team Alliance for Residential Building Innovation worked with Mutual Housing throughout the project. The case study discusses challenges encountered, lessons learned, and how obstacles were overcome. An objective of this project was to gain a highly visible foothold for residential buildings built to the DOE ZERH specification that can be used to encourage participation by other California builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Replacing The Engine In Your Car While You Are Still Driving It [PowerPoint]

The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for the operations staff. You will be surprised.

43 PARTICLE ACCELERATORS↗

Tips and Tricks of Incorporating Industry Standards into a Library Collection

Professional literature on the incorporation of industry standards into a library collection is somewhat limited. The objective of this presentation is to discuss the intricate details of acquiring, managing, and delivering electronic industry standards to library patrons in a seamless manner. Lessons learned regarding vendor selection and license agreements will also be discussed. Results from a survey administer at the National Renewable Energy Laboratory will be used to analyze how collection policies can properly be developed to incorporate industry standards into a library setting. The key points of acquisition decisions, avoidance of liability issues, and cost will be addressed.

99 GENERAL AND MISCELLANEOUS↗

Crystallization in high level waste (HLW) glass melters: Savannah River Site operational experience

This paper provides a review of the scaled melter testing that was completed for design input to the Defense Waste Processing Facility (DWPF) melter. Testing with prototype melters provided the data to define the DWPF operating limits to avoid bulk (volume) crystallization in the un-agitated DWPF melter and provided the data to distinguish between spinels generated by refractory corrosion versus spinels that precipitated from the HLW glass melt pool. A review of the crystallization observed with the prototype melters and the full-scale DWPF melters (DWPF Melter 1 and DWPF Melter 2) is included. Examples of actual DWPF melter attainment with Melter 2 are given. The intent is to provide an overview of lessons learned, including some example data, that can be used to advance the development and implementation of an empirical model and operating limit for crystal accumulation for a waste treatment and immobilization plant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nalu

Nalu is a Sierra ToolKit (STK) based application module, and it has provided a set of "lessons learned" for the STK transition effort through its early adoption of STK. It makes use of the open-sourced Trilinos/ Tpetra library. Through the investment of LORD and ASCR projects, the Nalu code module has been extended beyond prototype status. Physics capability includes low Mach, variable density turbulent flow. The ongoing objective for Nalu is to facilitate partnerships with external organizations in order to extend code capability and knowledge; however, it is not intended to support routine CFD analysis. The targeted usage of this module is for non-NW applications that support work-for-others in the multiphysics energy sector.

Source record↗

Developing a Natural Gas-Powered Bus Rapid Transit Service: A Case Study

The Roaring Fork Transit Authority (RFTA) and its VelociRFTA Bus Rapid Transit (BRT) program are unique in many ways. For example, VelociRFTA was the first rural BRT system in the United States and the operational environment of the VelociRFTA BRT is one of the most severe in the country, with extreme winter temperatures and altitudes close to 8,000 feet. RFTA viewed high altitude operation as the most challenging characteristic when it began considering the use of natural gas. RFTA is the second-largest public transit system in Colorado behind Denver's Regional Transportation District (RTD), and it is one of the largest rural public transit systems in the country. In 2013, RFTA accepted delivery of 22 new compressed natural gas (CNG) buses that went into service after completion of maintenance and refueling facilities earlier that year. This paper examines the lessons learned from RFTA's experience of investigating--and ultimately choosing--CNG for their new BRT program and focuses on the unique environment of RFTA's BRT application; the decision process to include CNG fueling in the project; unforeseen difficulties encountered in the operation of CNG buses; public perception; cost comparison to competing fuels; and considerations for indoor fueling facilities and project funding.

alternative fuels↗